online room design   
Your Sample # 1148 Your New Products Shopping
Family Room Re-Design Design + More + More + More List






Focal Point  
Design Description

Your family room has terrific space and a beautiful stone fireplace which is a much sought after feature in a home. The goal of the design is to create an inviting, comfortable sitting area and eat in kitchen area for your family and friends to enjoy. We combined traditional styles with things that are a bit more modern - because you guys are young and hip. We also combined a neutral wall palette (browns and linens) with the blues and greens you love.

With some new accessories, paint, and furniture, your room will be transformed into the space of your dreams. Remember that not everything has to be purchased new - look around your home for items that match this design and yard sales and flea markets are great too.

The new sofa and loveseat combines a classic look with a contemporary flare. Each piece features a patented independent spring seating system which isolates the movement on each seat, for a personalized level of comfort. Both pieces feature turned wood legs which provide a traditional look to the space. The new chair provides pattern and texture to the space, provides extra seating and coordinates nicely with the color palette of the room.

An oval cocktail table (more kid friendly than square) has an etched glass top that reveals a sunburst design on the shelf below. The shelf provides additional storage or can be used to display accessories. Two matching end tables coordinate with the cocktail table. A coordinating sofa table provides another area to display accessories, and features the same glass top as the cocktail table and end tables. You could use any dark wood traditional/modern sofa table here if you find something less expensively.

The table lamps feature a striking combination of a contemporary drum shade with a classical, sculptural base which coordinate beautifully with the new furniture.

Perspective  
© 2012 My Design Guide, Inc. • (877) STYLE-03