online room design   
Your Sample # 1169 Your New Products Shopping
The Hang Out Room - 1, ~STANDARD Design + More + More + More List






Focal Point  
Design Description

You have a great space to work with, in that you have a historical home that you love and wish to respect. You have lovely wood floors and architectural accents that deserve to be highlighted. In our telephone conversation you mentioned that you wanted the room to speak to its history, without feeling dated. Your style profile indicated that you are drawn to traditional style, but you also like romantic, rustic and coastal touches. The color preferences we discussed were more neutrality overall, with brighter decorative accents. The space needs to be a comfortable place for family and friends to hang out and watch TV, while still respecting the nature of a more traditional home.

Perspective  
© 2012 My Design Guide, Inc. • (877) STYLE-03