online room design   
Your Sample # 1190 Your New Products Shopping
Family Room - 1, ~STANDARD Design + More + More + More List






Focal Point  
Design Description

This is your MyDesign Guide Custom Room Design. We have worked with you to create a family room that incorporates your style, taste and lifestyle into a chic, functioning design. Your stylefinder told us that you have a preference for rustic and traditional style, with some country leanings as well. Your color preference was for warm red tones, but you are also drawn to neutral and earth tones. Your most important area of concern was to create a space that is warm, cozy and family friendly. You have a dog, so your items need to be able to stand a reasonable amount of wear and tear. You also needed more seating, but with a floor plan that includes two large entryways, you were uncertain how to do that.

Perspective  
© 2012 My Design Guide, Inc. • (877) STYLE-03