online room design   
Your Sample # 1195 Your New Products Shopping
Charlotte NC - 1, ~STANDARD Design + More + More + More List






Focal Point  
Design Description

This is your custom family room design. This plan includes several 3D renderings, furniture, draperies, carpet, lighting, art and accessories and paint color all wrapped up with a complete personal, clickable, shopping list for you. It was created by our professional designers, all of whom have degrees in design.

This open family room space is fantastic, it's great for entertaining and family time. The fireplace with the built in shelving is a fantastic focal point. This room however, needed some color and elegant furnishings to achieve your modern sophisticated style.

Because we are making use of your large burgundy sectional, we've chosen a color palette to build upon it using warm brown tones and an orange accent color. Dark wood accents have been added to the room and nickel hardware finishes to make this space -oh so striking.

The style is modern transitional - using amazing modern accent pieces and color, all wrapped up in some traditional elements.

Comfortable, welcoming, but Wow.

Perspective  
© 2012 My Design Guide, Inc. • (877) STYLE-03