online room design   
Your Sample # 90000021 Your New Products Shopping
Re-design Of Living Room Design + More + More + More List






Focal Point  
Design Description

Your family room has terrific architectural details and a much sought after fireplace. The challenge for this room is the size, which is fairly narrow. The size makes it difficult to have large pieces of furniture as well as room to maneuver through the space. The design inspriation was the beautiful piece of artwork you already owned. We loved the colors in the print and they work so beautifully with the space.

With some accessories, paint, and smaller scaled furniture, your living room will be transformed into a more functional, comfortable, and inviting space.

Functional and comfortable seating is provided by the new sectional. The sectional has reclining features, which is something that you wanted to keep in the room. It offers ample seating without taking up a lot of space, which makes your room appear larger.

A stylish, leather ottoman replaces your existing coffee table. The ottoman features a pull out tray on either side for holding drinks, which is great for entertaining. It also features a sturdy wood frame and dense foam padding for comfort and support if used for seating.

The round, glass top end table holds a new table lamp. The end table has a shelf beneath for added storage, and the lamp features a beautiful textured wood base matching the other wood finishes in the room.

The area rug contains neutral hues and has a unique pattern that creates color and interest in the space. Coordinating throw pillows add color, texture, and pattern using the same neutral colors.

A round mirror features an antique embossed brass finish and bamboo trim, which echos the other finishes throughout the room. The embossed finish matches beautifully with the colors in the space.

Perspective  
© 2012 My Design Guide, Inc. • (877) STYLE-03