online room design   
Your Sample # 1131 Your New Products Shopping
DC Dining Room Design + More + More + More List






Focal Point  
Design Description

Introduction

  • We have designed your condo dining room. It's a great space with lots of light and a terrific view past the living room to the skyline of DC.

  • The dining area, which can comfortably hold six, started out a little bland, white walls and a lack of storage and true points of interest.

  • We've created a design that simplifies the dining space with a clean and modern design. It builds on the warm brown of the terrific parquet floor but moves the eye to new pieces and colors that add interest.

  • Perspective  
    © 2010 My Design Guide, Inc. • (877) STYLE-03