online room design   
Your Sample # 1153 Your New Products Shopping
Master Bedroom Design + More + More + More List






Focal Point  
Design Description

This is your Art and Accessories plan. As we mentioned in the Quick Fix, you have terrific furniture and a beautiful, bright, large master bedroom. The new paint color we recommended in your Quick Fix will coordinate with most art and accessories.

The bed is a key focal point in the room. The bedding choices we've selected are neutral, but provide the elegance and sophistication you are seeking, as well as adding just enough color to the room to move the eye from point to point. We've recommended two affordable options for you to choose from. The Rustic Foliage Bedding features sophisticated shades of tan, brown, and bronze along with accents of rich textures including velvet, faux silk, and fringe to create an elegant, beautiful retreat. The Dreamtime Floral Bedding features vintage-inspired designs, delicate embroidery and quilted touches, creating a fresh look rooted in traditional charm.

The new chandelier provides your bedroom with more lighting and is the right scale for the size of the room. The chandelier features hand wrought iron and an oil bronze finish that will coordinate with your current furniture and new paint color.

New bedside table lamps complement your new chandelier beautifully. Both have a bronze finish and are the right scale for your bedroom. The lampshade can be switched out to a shade of your choice if need be.

Your room lacks the art and accessories it needs to create a sophisticated, complete look. The Steven N. Meyers prints coordinate with the colors and flowers in the Janette Bedding Set and provides a unique look to the room. Hang the Iceland Poppy I print on the right side of your bathroom door where your current artwork is hanging. Hang the Iceland Poppy Print II print on the left side of the bathroom door. This will provide balance and unity to the wall. Hang the Anemone III and IV prints on either side of the dresser, providing another focal point on that wall. The Anemone I print can be hung on the wall above the chest.

The artwork selected to coordinate with the Rustic Foliage Bedding features the same colors and similiar patterns. Hang the Vintage Wallpaper Art Prints on either side of the bathroom door. Hang the Bronze Botanical Art Prints on either side of the dresser. These prints contain colors that match the Rustic Foliage Bedding. The Rustique Romance Print can be hung on the wall above the chest.

Perspective  
© 2010 My Design Guide, Inc. • (877) STYLE-03