Your Dining Room Art and Accessories package has been customized to coordinate with your existing furnishings and design preferences. Your calm, blue walls, and crisp, white draperies in combination with the richly colored carpet and dark, traditional furniture are a wonderful base to build on!
General Design goals for your selection included:
Pull warmer colors to the walls and table top to link the cool colored walls with the warm colored carpet.
Add reflective accessories and new lighting to add brightenss and sparkle to the room, particularly for evening meals in the space.
Link formal furniture with cheerful, feminine accessories to soften the room and lend a welcoming tone.
Design Elements:
Image A:
grouped botanicals (set of 4) on fireplace wall
Large mirror over buffet (hang in horizontal orientation)
Runner, placemats, napkins for tabletop
Relocate small chest from below window
Image B:
Move small chest to the left of the window
Hang two floating shelves (above relocated chest) to the left of the window (home for decorative china)