online room design   
Your Sample # 1122 Your New Products Shopping
Grand Living Room Design + More + More List






Focal Point  
Design Description

This empty room has fantastic architecture. With our design, the room goes from being a classic but tired space, to a grand and elegant room for entertaining. Your desire to make this a beautiful classical space for entertaining including some modern touches comes alive.

  • The owners' existing artwork is the inspiration for the design. This large landscape placed above the fireplace, contains rich, warm colors which we've incorporated into your new formal living room.

  • The owners' existing sofa is used to anchor the seating area around the grand fireplace. A new Windsor rug warms the room, but continues in the formal tradition. The rug should be centered on the fireplace, but set out approximately six inches.
  • Perspective  
    © 2010 My Design Guide, Inc. • (877) STYLE-03