online room design   
Your Sample # 1133 Your New Products Shopping
Redesign Of Family Room Design + More + More List






Focal Point  
Design Description

We've created your new family room, including new art, accessories, lighting and furniture. This room has great features, such as the high ceilings, the stone fireplace, and the ample natural lighting that flows through the huge windows.

The goal of this family room re-design was to incorporate your modern, stylish area rug and print and to make the room a great place for family gatherings, watching tv and relaxing.

We also wanted to provide a neutral paint color for the space to ensure re-sale at a later date, to include upholstered furniture rather than leather, to include a TV stand for a flat screen television, and to keep the fantastic, colorful print you have above the fireplace.

We were able to accomplish these goals, and provide you with an inviting, modern design. Our design concept was to select neutral furniture, a great accent paint color and to bring in small brightly colored accessories to complement the colors in the rug and art, including the blues, red and greens found in those items. Dark wood tables contrast with the neutral upholstry to provide pops of strength and a bit of masculine tone and the hardware finishes are all brushed nickel in keeping with the modern design

Perspective  
© 2010 My Design Guide, Inc. • (877) STYLE-03