online room design   
Your Sample # 90000004 Your New Products Shopping
A Redesign Of A Condo In D.C. Design + More + More + More List






Focal Point  
Design Description

Introduction

  • Living room redesign for your condo in Washington, D.C.

  • You indicated that this space is used for entertaining, reading, and relaxation. The design includes using your existing sofa and fantastic Barcelona chair. These two are both great pieces, but required some desing elements to link them together and meet your functionality needs. You indicated that the room is used for entertaining as well as for reading and relaxing.

  • In addition, the space was in need of subtly separating both the dining room and the entry from the living room area.
  • Perspective  
    © 2010 My Design Guide, Inc. • (877) STYLE-03