online room design   
Your Sample # 90000019 Your New Products Shopping
Re-design Of Family Room Design + More + More List






Focal Point  
Design Description

Your family room has terrific architectural details and a much sought after fireplace. It just lacked some color and cohesiveness.

The goal of the re-design is to create a space that is functional, inviting and comfortable, and to utilize the room's full potential. The challenge of this room is it's long narrow layout and being able to incorporate an office/computer area into the room that looks stylish and as if it's part the room.

Using new furniture, accessories and artwork, and incorporating some of your existing pieces, we have created a stylishly comfortable room for your family. As you'll notice, we went a little heavy on the Pottery Barn selections because it's one of your favorite stores.

Functional and comfortable seating is provided by the new sectional sofa. It offers ample seating for family and guests, and is big enough for your kids to play around on. The fabric is easy to clean, and features an independent seating system that isolates the movement on each seat, so you can relax without disruption. This sectional has many configuration options to meet your family needs. A less expensive option would be to pair a sofa with a loveseat, available with this same collection.

New artwork above the sofa is a striking piece of perfect scale. It adds color to your room and coordinates perfectly with the new paint color.

Wall-Mounted candleholders add elegance while incorporating your transitional style.

The throw pillows bring texture, color, and pattern to the room, which is important to make the room feel richly finished.

The rug features warm, neutral hues sparked with red and gold, and it works nicely with the artwork and throw pillows.

The leather ottoman /coffee table offers great storage for toys, in a traditional fashion. Caution - it's from Overstock, which we love, but may be available for a limited time.

Perspective  
© 2010 My Design Guide, Inc. • (877) STYLE-03