Fencing in Southern California & the Bay Area
Quick answer
A new fence in Southern California typically costs about $35–$65 per linear foot for a wood privacy fence and $40–$75 per linear foot for vinyl, installed. Total cost depends on length, height, gates, old-fence removal and site conditions. Most residential fences are built in a few days.
5.0 from 47 reviews on Houzz · CSLB Lic. #1040337 · Class B

What our fencing service includes
Wood, horizontal slat and vinyl fences and gates that add privacy and curb appeal, set on solid posts.
MDG Builders sells, designs and manages your project; the work is performed by licensed, insured subcontractors.
- Layout and property-line planning
- Wood, horizontal slat and vinyl fences
- Gates and hardware
- Post footings in concrete
- Removal of old fencing
Fencing cost in California
| Scope | Typical installed range |
|---|---|
| Wood privacy fence, per linear foot | $35 – $65 |
| Vinyl privacy fence, per linear foot | $40 – $75 |
Cost factors
- Linear footage and height
- Material: wood, horizontal slat, vinyl or metal
- Number and type of gates
- Removal of the old fence
- Slope and soil conditions
- Local height and setback rules
How long it takes
Most residential fences are built in a few days after layout and post footings cure.
Permits
Many California cities require a permit above a set height or for fences in front setbacks. We check local rules first.
| Wood | Vinyl | |
|---|---|---|
| Typical installed price | $35–$65 per linear foot | $40–$75 per linear foot |
| Maintenance | Periodic sealing or staining | Occasional washing |
| Look | Natural, warm | Clean, uniform |
How your fencing project works
Consultation
Call (888) 666-8224 or send the form to share goals, timing and budget range.
Site visit
We measure, assess existing conditions and discuss options in person.
Written proposal
You receive a written scope and price; typical ranges are a guide, not a quote.
Permits and scheduling
We coordinate permits where required and schedule licensed, insured subcontractors.
Construction and walkthrough
Our team manages the work through final inspection and walkthrough.
What clients say about MDG Builders
From the beginning, we had a great experience with the team at My Design Guide Inc! We wanted to upgrade our patio but we weren't creative enough to know what to do. David was full of great suggestions to make the patio a true conversation piece while still honoring our budget and we couldn't be happier with the result! The quality of work and professionalism is the best I have seen in this business, and they really do take pride in their work. David communicated with us throughout the process and was meticulous in ensuring our yard was still taken care of during the construction period. We have received so many compliments on our new paver patio, fire pit with seating, and built-in outdoor counter. I highly recommend going with them. I would go with them again a hundred times over!
Emil is the most professional, honest, and hardworking person I've hired. I hired him and his crew to pour a 16'x12' concrete slab for a patio. He walked me through every step of the way and communicated with me at all times. I highly recommend him and I will be hiring him for future jobs. It was truly a stress-free job knowing I was getting a good quality install!
We had no idea where to start, we had a large project with so many moving parts can be very challenging for novices like us. From the very beginning, Emil was responsive, helpful, timely with any questions, night and day. Since this was a gut job we were even more nervous. We were astonished on just how easy the whole process was with no hiccups at all. Less than 3 weeks and we had a wonderful spa. His workers were responsible, timely, responsive and did an amazing job down to the little details. Even our friends were surprised we had such an easy time with the job. Book them for any job because you will not be disappointed.
Verbatim Houzz reviews of MDG Builders; some describe projects other than fencing.
Fencing questions, answered
Related services:
Cost guides:
How much does a fence cost per foot in Southern California?
Typically $35–$65 per linear foot for wood privacy fencing and $40–$75 for vinyl, installed.
What fence lasts longest?
Vinyl and metal fences need the least maintenance; wood needs periodic sealing or staining.
Do I need a permit for a fence?
Often only above a certain height or in front yards; rules vary by city.
Who pays for a shared fence in California?
California's Good Neighbor Fence Act presumes adjoining owners share responsibility for a boundary fence; talk with your neighbor first.
Wood or vinyl fence?
Wood offers warmth and lower upfront cost; vinyl offers low maintenance.
How long does fence installation take?
Typically a few days once materials are on site.
Can you remove my old fence?
Yes, removal and disposal can be included.
Who actually does the work on my project?
MDG Builders (My Design Guide Inc, CSLB #1040337, Class B) sells, plans and manages your project from start to finish. The hands-on work is performed by licensed, insured subcontractors in each trade, scheduled and supervised by our team so you have one point of contact.
Is MDG Builders licensed in California?
Yes. My Design Guide Inc holds California Contractors State License Board license #1040337, Class B (General Building). You can look up any license on the CSLB website.
What areas do you serve?
Southern California from Lancaster to San Diego, plus the San Francisco Bay Area.
How do I get an estimate?
Call (888) 666-8224, email info@mydesignguide.com or send the estimate form. We discuss your goals, schedule a site visit and send a written proposal. Office hours are Monday to Thursday 8 AM to 5 PM and Friday 8 AM to 2 PM.
Planning a fencing project?
Free estimates. A real person answers — call or send the form and we'll follow up to schedule a site visit.
MDG Builders at a glance
- Who
- My Design Guide Inc dba MDG Builders, a licensed general contractor that sells, designs and manages remodeling and construction projects
- License
- CSLB #1040337, Class B (General Building)
- Where
- Based in Tarzana, CA; serving Southern California (Lancaster to San Diego) and the San Francisco Bay Area
- Phone & email
- (888) 666-8224 · info@mydesignguide.com
- Hours
- Mon–Thu 8:00 AM–5:00 PM · Fri 8:00 AM–2:00 PM · Sat–Sun closed
- Rating
- 5.0 from 47 reviews on Houzz