Tarzana, CA · Serving Southern CaliforniaCSLB #1040337 · (888) 666-8224
Alhambra, CA

General Contractor Alhambra, CA: Older Homes Under a New Zoning Code

Quick answer

A general contractor in Alhambra works under a rulebook that is new and a housing stock that is old. The City's Zoning Code and Map took effect October 3, 2026, while 72.1 percent of homes predate 1980. MDG Builders, CSLB #1040337, plans the scope, files it online and manages licensed subcontractors for eleven trades.

Services

Eleven trades, each with an Alhambra guide of its own

Each guide applies the City's published rules, the age of the local housing and the hedges we could not resolve to one kind of job. Start with the one closest to your plan.

A small bright rental apartment kitchen freshly updated with white shaker cabinets, kitchen remodeling by a general contractor near Alhambra in San Gabriel

Kitchen Remodeling in Alhambra

Finish work that skips a permit, trade permits for wiring and gas, pre-1980 walls, Design Review for additions and online-only filing for Alhambra kitchens.

See Alhambra kitchen remodeling →
Hall bathroom with a tub-to-shower conversion: white subway tile to the ceiling, clear glass panel, bathroom remodeling by a general contractor in Alhambra Historical Society, Alhambra

Bathroom Remodeling in Alhambra

Paperless permits, inspection timing, older-house surprises, rental rules and layout choices for Alhambra bathrooms.

See Alhambra bathroom remodeling →
The backyard of a 1920s California bungalow cleared for a new backyard unit, with wooden stakes, adu construction by a general contractor near Alhambra in South Pasadena

ADU Construction in Alhambra

The 60 day review, size and setback limits, garage conversions, listed fees and rental rules for an Alhambra ADU.

See Alhambra ADU construction →
A 1960s stucco house with a freshly built second story, new windows and a low-pitched roof, room additions by a general contractor in Alhambra High School, Alhambra

Room Additions in Alhambra

Design Review for second stories, RL zone limits, historic thresholds, plan check and soils for an Alhambra addition.

See Alhambra room additions →
Barrel clay tile roof on a Spanish-style California house with white stucco walls and an arched entr, roofing by a general contractor near Alhambra in South Pasadena Public Library

Roofing in Alhambra

Cool roof energy rules, permits filed online only, a Design Review exception for like-for-like re-roofs and a housing stock with a median build year of 1960.

See Alhambra roofing →
Bedroom with two white double-hung windows, linen curtains, a bed with white bedding, windows by a general contractor in Almansor Park, Alhambra

Windows in Alhambra

The window permit, the like-for-like Design Review exception, historic review, glass labels and summer heat for Alhambra homes.

See Alhambra window replacement →
A bare plywood subfloor in an empty room being prepared: clean screws in rows, flooring by a general contractor near Alhambra in Barnes Memorial Park

Flooring in Alhambra

Floors in 1920s tract homes, the exempt-work list, slab moisture, garage conversion slabs, renter and condo limits and historic review in Alhambra.

See Alhambra flooring →
Exterior of a California Craftsman bungalow freshly painted warm white with dark charcoal trim and a, painting by a general contractor in Alhambra Park, Alhambra

Painting in Alhambra

No permit for painting, historic review only for new color on unpainted surfaces, and lead-safe rules for a housing stock built mostly before 1980.

See Alhambra painting →
Stamped concrete patio in a slate pattern with a round fire pit and outdoor chairs, concrete by a general contractor near Alhambra in Monterey Park

Concrete in Alhambra

The 25 percent hardscape cap, driveway approach permits, retaining wall limits, cracked tract walks, heat and rain and pour costs in Alhambra.

See Alhambra concrete work →
A rear deck of warm cedar boards on a 1920s California bungalow, with simple railings, decks by a general contractor in Story Park, Alhambra

Decks in Alhambra

The 30 inch permit line, yard setbacks, the 15 foot rule for upper decks, repair limits, fire zone boards and deck costs in Alhambra.

See Alhambra deck building →
Horizontal slat redwood fence with a matching gate along a modern backyard with gravel and grasses, fencing by a general contractor near Alhambra in Garvey Ranch Park

Fencing in Alhambra

A 3 foot front yard cap, Design Review for street-facing fences, a 6 foot limit elsewhere and corner sight triangles under the new zoning code.

See Alhambra fencing →
Rules and housing

What should an Alhambra owner sort out before hiring a general contractor?

Alhambra grew fast and early. According to Wikipedia, Benjamin Davis Wilson developed the land and named it for Washington Irving's Tales of the Alhambra, and the city incorporated on July 11, 1903. Census counts on that page run from 5,021 residents in 1910 to 29,472 in 1930, so the 1920s were the biggest growth decade. The Alhambra Historical Society's neighborhood notes describe what that growth built: Arts and Crafts houses in Ramona Park and Wuest-Bushnell, Spanish and storybook homes in Lindaraxa, Tudor and Cape Cod revival in Mayfair, and 1940s and post-war houses in the Bean, Midwick and Airport tracts. The Census Bureau's 2020 to 2024 estimates count 32,751 housing units, with a median year built of 1960. About 23 percent date from 1939 or earlier and 72.1 percent from before 1980, which is why a kitchen remodel, a bathroom remodel or new flooring often meets original wiring, pipes and subfloors. Only 41.3 percent of units are detached houses, and 58.9 percent of households rent, so landlord and association approvals come up on many jobs.

Paperwork runs through the Building Division of the Community Development Department, and it is fully paperless. Applications and plans go in through the Permit Portal and Plan Check Portal, inspections are requested online, and paper plans and counter payments are not accepted. The Division lists hours Monday through Thursday, with the permit counter open mornings and early afternoons, and says its first plan check review takes 2 to 4 weeks. Planning confirms what the lot allows before the building application goes in. That matters now, because the City's new Zoning Code and Zoning Map took effect October 3, 2026, and the City warns that its online Municipal Code can trail the 2026 updates by several months. The same online code adopts the 2022 California codes, and we could not confirm whether Alhambra has adopted the 2025 edition, so ask which one your plans will be checked against. We also found no published permit fee schedule, so no fee appears on our pages; the amount follows project valuation and the counter can quote it for your address.

The new code shows up first in the front yard and on the second floor. Street-facing yards must be landscaped with live plants or artificial turf, ordinary hardscape is capped at 25 percent, and a front yard fence stops at 3 feet and goes to Design Review. Pouring a wider driveway or a patio slab for concrete work therefore starts with that cap, and a deck is checked against separate setbacks. Two-story additions and street-visible exterior changes that need a building permit also go to Design Review, with like-for-like windows and re-roofs excepted, so a room addition on a second floor takes longer than a single-story bump-out. An ADU follows the ministerial track instead of a hearing. Historic review is narrower than many owners fear: the City's 2023 survey flagged 865 properties as potentially eligible and its page shows none formally designated. Under the September 2025 ordinance, repainting a painted surface, an in-kind window replacement and a look-alike roof are negligible alterations, and a repaint needs no review at all. Demolition and major street-facing changes do not get that pass.

The ground and the weather are mostly mild. County GIS layers showed 205 of 207 sample points inside the city as non-wildland for fire, and the 2 Moderate points sat on the west side, but that is a sample, the City has no page on the 2025 maps that we found, and a lot-level answer comes from the CAL FIRE viewer. The same layers put no sample point in a liquefaction, fault or flood zone. The San Gabriel station nearby records 15.67 inches of rain a year, 81 percent of it from December through March, and about 64 days at or above 90 degrees F. MDG Builders holds CSLB #1040337 and acts as the general contractor of record: we draw the scope, handle the portals and plan check, hire licensed specialty subcontractors and walk the result with you, and you may ask each subcontractor for a license number and certificate of insurance. Our subcontractor guide shows how that works. For work just over the line, see our hubs for Pasadena and Los Angeles; Monterey Park, San Gabriel, South Pasadena and Rosemead are not published yet, so call us about those.

A 1960s California ranch house with a fresh two-tone exterior: soft greige body, painting by a general contractor in Ramona Park, Alhambra
  • The City's Zoning Code and Zoning Map are effective October 3, 2026, and the online Municipal Code may lag.
  • About 23 percent of Alhambra housing units went up in 1939 or earlier, and 72.1 percent before 1980.
  • Applications, plans, payments and inspection requests all go through the City's online portals.
  • The Building Division quotes 2 to 4 weeks for the first plan check review.
  • The City's 2023 survey listed 865 potentially eligible properties, and its page shows none formally designated.
  • The nearby San Gabriel station averages 15.67 inches of rain a year, 81 percent of it from December through March.
FAQ

Alhambra contractor and permit questions, answered

What does a general contractor do on an Alhambra project?

A general contractor takes responsibility for the whole job: scope, drawings, permits, subcontractor scheduling, inspections and the final walkthrough. MDG Builders, CSLB #1040337, does not self-perform trades. Licensed specialty subcontractors build, and you can ask for each one's license number and certificate of insurance before work starts.

Where do I apply for a building permit in Alhambra?

Apply online through the Building Division's Permit Portal, then upload plans to the Plan Check Portal. The Division is paperless and accepts no paper plans, paper applications or in-person payments. Confirm with Planning first what the lot allows, and call the Division at 626-570-5032 about anything the portal steps leave unclear.

How does Alhambra's new Zoning Code affect my remodel?

It can change what you may build. The code took effect October 3, 2026, with front yard planting, a 25 percent hardscape cap, 3 foot front fences and Design Review for two-story additions among its rules. The City says its online code can lag, so ask Planning at 626-570-5034 to confirm your lot.

Is my Alhambra house a historic property?

Probably not formally, but ask. The City's 2023 survey flagged 865 properties as potentially eligible, and its page shows none designated. Repainting, in-kind windows, look-alike roofing and interior work are negligible alterations; demolition and major street-facing changes are not. A potentially eligible house needs a historic resource assessment before major work.

Which building code does Alhambra check plans against?

The online Municipal Code adopts the Los Angeles County codes as of January 1, 2023, which are based on the 2022 California codes, and the City's checklists cite 2022 standards. The state's 2025 edition took effect January 1, 2026, and we could not confirm that Alhambra adopted it, so ask the Building Division.

How much are Alhambra permit fees?

We could not find a published fee schedule, so we quote no permit fee. The municipal code says fees follow project valuation, including finish work, and are set by separate resolution. Ask the permit counter for the amount on your address, and ask us to list permit and plan check fees on their own line.

Is Alhambra in a fire hazard severity zone?

Mostly not, based on a sample. In County GIS data, 205 of 207 points spaced across the city were Non-Wildland and 2 were Moderate, both on the west side; none was High or Very High. The City has no page on the 2025 maps that we found, so check your address on the CAL FIRE viewer.

How long does approval take, and when can crews work?

The Building Division quotes 2 to 4 weeks for the first plan check review, and extra review rounds add fees and time. Construction noise is exempt from the City's limits only if no work happens between 7 p.m. and 7 a.m. on weekdays and Saturday, or on Sundays and federal holidays.

Free estimate

Tell us about your Alhambra project

Send the address and a few lines about the job. We look up the zoning, historic and fire questions for that lot first, then call to explain which Alhambra approvals your plan is likely to meet.

Free estimate · A real person answers · (888) 666-8224

Call (888) 666-8224