Tarzana, CA · Serving Southern CaliforniaCSLB #1040337 · (888) 666-8224
Agoura Hills, CA

General Contractor in Agoura Hills, CA

Quick answer

A general contractor in Agoura Hills plans around protected oaks, hillside review, fire standards on every lot and three design overlays before any trade starts. MDG Builders, CSLB #1040337, writes the scope, files permits with the City and schedules licensed subcontractors across eleven trades. Confirm each rule with the City, since we read code text from a mirror site.

Services

Eleven guides for Agoura Hills lots, slopes and canyon homes

Every guide below reads the Agoura Hills code text we could find for that trade and says where the City must confirm it. Pick your job, or read the city background underneath first.

Finished bright kitchen in a California home: white shaker cabinets, kitchen remodeling by a general contractor near Agoura Hills in Oak Park

Kitchen Remodeling in Agoura Hills

1970s and 1980s kitchens, permit exemptions for cabinets and counters, island sink venting, the 50 percent sprinkler rule and SB 407 fixtures.

See Agoura Hills kitchen remodeling →
Small powder room with a patterned cement tile floor, pedestal sink, bathroom remodeling by a general contractor in Agoura Village, Agoura Hills

Bathroom Remodeling in Agoura Hills

Agoura Hills bathroom work: the permit line, 1970s tract plumbing, SB 407 fixtures, fire standards on every lot, oaks and construction hours.

See Agoura Hills bathroom remodeling →
Interior of a garage converted to living space: new finished wall where the garage door was, adu construction by a general contractor near Agoura Hills in Agoura

ADU Construction in Agoura Hills

Agoura Hills ADU route: the December 2025 ordinance, 60 day clock, garage conversions, oaks, slopes, sewer and fire standards.

See Agoura Hills ADU construction →
A framed room addition on a hillside Los Angeles house with a stepped concrete retaining wall, room additions by a general contractor in Lake Lindero, Agoura Hills

Room Additions in Agoura Hills

Agoura Hills addition rules: Planning first, the 10 percent hillside line, oak permits, soils reports, 50 percent sprinkler trigger and overlays.

See Agoura Hills room additions →
Roofing material samples on a driveway: a gray shingle, roofing by a general contractor near Agoura Hills in Westlake Village

Roofing in Agoura Hills

Class A roofs on every lot, no wood shakes, 5 and 50 percent re-roof lines, protected oaks and solar panel resets for Agoura Hills homes.

See Agoura Hills roofing →
The front of a historic California Craftsman bungalow with original restored wood double-hung window, windows by a general contractor in Old Agoura, Agoura Hills

Windows in Agoura Hills

Agoura Hills windows: fire glass on every lot, the permit rule, lead-safe work, energy code numbers, door conversions and install day.

See Agoura Hills window replacement →
Large-format porcelain tile floor in a house entry with a wood front door and a console table, flooring by a general contractor near Agoura Hills in Calabasas

Flooring in Agoura Hills

Old vinyl and mastic in 1970s tract homes, slab soils on a hillside lot, the permit exemption, condo approvals and work hours in Agoura Hills.

See Agoura Hills flooring →
A historic California Craftsman bungalow on a tree-lined street freshly painted in period colors, painting by a general contractor in Reyes Adobe, Agoura Hills

Painting in Agoura Hills

No paint permit, earthtone colors in Old Agoura and SB 9 areas, lead-safe rules for 1970s homes and fire code limits on what paint can fix.

See Agoura Hills painting →
Close-up of smooth trowel-finished concrete with precise saw-cut control joints, soft side light, concrete by a general contractor near Agoura Hills in Hidden Hills

Concrete in Agoura Hills

Protected tree zones, hillside grading, the 30 inch permit line, retaining walls, overlay rules and pour costs in Agoura Hills.

See Agoura Hills concrete work →
Raised composite deck with a cable railing and outdoor dining set on a hillside lot, canyon view, decks by a general contractor in Ladyface Mountain, Agoura Hills

Decks in Agoura Hills

Fire resistant decking on every lot, the 200 square foot permit line, yard projections, hillside and tree rules and deck repair in Agoura Hills.

See Agoura Hills deck building →
Fence material samples leaning against a stucco wall: a cedar picket, fencing by a general contractor near Agoura Hills in Bell Canyon

Fencing in Agoura Hills

A 3.5 foot front yard cap, 6 foot backyards, Old Agoura open fronts, retaining wall heights, protected oaks and pool barriers.

See Agoura Hills fencing →
Oaks, slopes, 1982 cityhood

What should an Agoura Hills homeowner know before hiring a general contractor?

Agoura Hills is a young city on very old ground. Chumash settlement here dates back about 10,000 years, the Reyes Adobe was once the headquarters of a ranch, and the 1920s Paramount Ranch film years briefly gave the community the name Picture City. The post office took its 1927 name from a Basque settler, Pierre Agoure. Homebuilding at scale waited for the Ventura Freeway in the late 1960s, and voters chose cityhood in 1982 with 68 percent in favor, making this the 83rd city in Los Angeles County. Census Bureau estimates for 2020 to 2024 count 7,566 housing units: 36.8 percent date from the 1970s and 36.6 percent from the 1980s, while just 2.3 percent predate 1950. About 53 percent were built before 1980, so lead-safe work rules may apply to a paid repaint or a window swap, and pulling up old flooring can disturb asbestos. The median owner-occupied home is valued at $1,098,000, and about 71 percent of units are detached houses.

Trees and slopes come before the trades do. The protected tree ordinance of December 10, 2025 covers every scrub oak and any oak, California sycamore or Southern California black walnut with a trunk of 6 inches or more at 4.5 feet above ground. Its protection zone never shrinks below 15 feet from the trunk, and ground disturbance within 25 feet of that zone calls for a development tree permit backed by a consultant's report. That can catch a new driveway or patio slab, a trench for a fence or the footings of a deck. A lot that averages more than 10 percent slope needs a conditional use permit or architectural review before a building or grading permit, and hillside buildings stop 15 feet above the reference grade. The Old Agoura and Indian Hills design overlays add review, and the Equestrian overlay sets aside a horse keeping area on new house lots. Grading follows Appendix J, and we could not confirm which grading is exempt under J103.2, so ask before a room addition touches a slope.

Fire rules reach every address. The City's Building and Safety handouts say all Agoura Hills properties follow its Very High Fire Hazard Severity Zone construction standards, meaning Class A roofs, ember resistant vents, tempered pane windows, ignition resistant eaves and decks, and no wood shakes. The County's copy of CAL FIRE's map returned Very High at 47 of 59 sample points, with 3 High, 6 Moderate and 3 NonWildland. Those are sample points, not parcels, and we could not confirm that the Council adopted CAL FIRE's 2025 map. The Woolsey Fire burned through the community in November 2018, which is why a roof replacement here is a conversation about vents, eaves and glass as much as shingles. Paint cannot rescue non-compliant siding either: the fire standards do not count coatings as ignition resistance, so ask Planning about colors on an exterior repaint inside Old Agoura.

The paper trail needs care. The Municipal Code adopted the 2025 California codes with local changes on November 12, 2025, yet the City's handouts still cite the 2022 codes, its permits page still quotes a 180 day expiry and the old $500 minor-work limit, and one page still links the earlier ADU ordinance. We read the code on the GoCodebook mirror, so every section needs confirming with Building and Safety. A kitchen remodel or bathroom remodel that moves pipes or opens walls needs a permit even though cabinets and tile do not. For an ADU, start from the December 2025 ordinance, which promises approval within 60 days of a complete application; the JADU owner-occupancy rule there conflicts with AB 1154, so confirm which one the counter applies. Calabasas and Los Angeles have their own guides, while Thousand Oaks, Simi Valley and Moorpark keep separate codes. MDG Builders is the contractor of record on the contract: we design, apply and sequence, and licensed specialists build.

Wide-plank natural oak floor in a bright living room with a white sofa and a large window, flooring by a general contractor in Downtown Agoura Hills, Agoura Hills
  • Agoura Hills became a city in 1982 after a 68 percent vote and is the 83rd city in Los Angeles County.
  • Census estimates for 2020 to 2024 count 7,566 housing units, 73.4 percent of them built in the 1970s and 1980s.
  • Ground disturbance within 25 feet of a protected tree's zone needs a development tree permit under the December 2025 ordinance.
  • A lot averaging more than 10 percent slope needs a conditional use permit or architectural review before a building or grading permit.
  • The County map returned Very High at 47 of 59 sample points, yet the City applies Very High standards to every property.
  • Our code reading comes from the GoCodebook mirror, and the City's handouts still show 2022 codes and the earlier ADU ordinance.
Nearby

Cities near Agoura Hills we also build in

FAQ

Agoura Hills questions to settle before you sign

Where do I apply for a building permit in Agoura Hills?

Apply online through the City's MGO Connect portal, after Planning approval where the job needs it. Building and Safety sits inside the Community Development Department, and Planning handles zoning, tree and hillside review. Read the permit center page, then ask which handouts are current.

Do I need a permit to replace windows or a roof?

Yes to both. The City's window handout says every window or exterior door replacement needs a building permit, and the roof handout says any recovering or replacement does, though neither job needs plan check drawings. The handouts are dated 2023, so ask Building and Safety whether the 2025 codes changed anything.

Can I trim or remove an oak tree on my Agoura Hills lot?

Not without checking first. Oaks, sycamores and black walnuts of 6 inches or more, plus every scrub oak, are protected, and removing or damaging one needs a permit. Routine upkeep such as deadwood pruning is exempt, while topping is banned. Call Planning before anyone brings a saw, a trencher or a skid steer.

Is my Agoura Hills house in a fire hazard zone?

Plan as if it is. The City's handouts hold every property to its Very High construction standards, while the County map showed Very High at 47 of 59 sample points, which are not parcels. We could not confirm Council adoption of CAL FIRE's 2025 map, so check your lot on that map and ask Building and Safety.

Can I build an ADU or JADU in Agoura Hills?

Generally yes. The City adopted a new ADU ordinance on December 10, 2025, and a complete application that meets its objective standards is approved within 60 days. Older handouts may show the former rules. For a JADU, the City requires owner occupancy while AB 1154 narrows that rule, so confirm which one applies.

What hours can contractors make noise in Agoura Hills?

Loud equipment is banned on Sundays and holidays and from 7:00 p.m. to 7:00 a.m. on other days under Municipal Code 4100. The zoning section uses 8:00 p.m., so plan around the earlier hour. The building official can suspend a permit over night noise or excess dust, so warn neighbors before demolition or cutting.

How much does a project cost in Agoura Hills?

No page here quotes an Agoura Hills price; the figures in our trade guides are sourced Los Angeles area ranges. Hillside access, tree protection, fire rated materials and soils or engineering reports push a total up. A written proposal after a site visit is the real price, so compare scopes and allowances line by line.

Who actually does the work on an MDG Builders job?

Licensed specialty subcontractors do the field work, and MDG Builders, CSLB #1040337, is the general contractor that plans the scope, files permits and orders the trades. Ask each firm for its license number and certificate of insurance before work starts. The City also requires contractors on its permits to hold a City business license.

Free estimate

Tell us about your Agoura Hills project

Share your neighborhood, whether the lot slopes or has oaks, sycamores or walnuts, and what you want built. We check the overlay and tree questions before we call you.

Free estimate · A real person answers · (888) 666-8224

Call (888) 666-8224