Tarzana, CA · Serving Southern CaliforniaCSLB #1040337 · (888) 666-8224
Duarte, CA

General Contractor in Duarte, CA

Quick answer

A general contractor in Duarte plans around two lines the city draws itself: a hillside boundary near Sunnydale Drive and Brookridge Road, and staff design review that reaches every fence and wall. MDG Builders holds CSLB #1040337, draws plans, files permits and schedules licensed subcontractors across eleven trades, from roofs and windows to ADUs and decks.

Services

Pick the Duarte project: eleven trade pages

Each page reads Duarte's posted code for one trade and marks what we could not confirm. Start with your own job, or skim the city notes underneath first.

Finished bright kitchen in a California home: white shaker cabinets, kitchen remodeling by a general contractor near Duarte in Bradbury

Kitchen Remodeling in Duarte

1950s kitchens, Type K copper in repipes, 2025 code editions, permit fees at twice the County rate and design review for bump-outs.

See Duarte kitchen remodeling →
Small powder room with a patterned cement tile floor, pedestal sink, bathroom remodeling by a general contractor in Royal Oaks, Duarte

Bathroom Remodeling in Duarte

Duarte's permit line for bath work, the Type K copper rule, lead-safe work in 1950s and 1960s homes, rentals and design review.

See Duarte bathroom remodeling →
Interior of a garage converted to living space: new finished wall where the garage door was, adu construction by a general contractor near Duarte in Monrovia

ADU Construction in Duarte

Duarte's ADU route: ministerial review, size caps, garage conversions, the foothill line, code lines to confirm, utilities and fees.

See Duarte ADU construction →
A framed room addition on a hillside Los Angeles house with a stepped concrete retaining wall, room additions by a general contractor in Las Lomas, Duarte

Room Additions in Duarte

Duarte's design review tiers, lot coverage, second-story step-back, foothill reports, garage parking triggers and tree permits.

See Duarte room additions →
Roof eave with a new white fascia board, a seamless gutter, roofing by a general contractor near Duarte in Irwindale

Roofing in Duarte

Class A roofs in high fire zones, a Sunnydale Drive hillside line, design review for pitch changes and a re-roof permit to confirm for Duarte homes.

See Duarte roofing →
The front of a historic California Craftsman bungalow with original restored wood double-hung window, windows by a general contractor in Butler, Duarte

Windows in Duarte

Lead-safe rules for older homes, tempered glass in fire zones, design review, heat and install day for Duarte windows.

See Duarte window replacement →
Large-format porcelain tile floor in a house entry with a wood front door and a console table, flooring by a general contractor near Duarte in Azusa

Flooring in Duarte

1950s homes, lead and asbestos checks, the permit question, the 50 percent thresholds, rentals and costs for flooring in Duarte.

See Duarte flooring →
A room prepared for ceiling paint with plastic sheeting, painting by a general contractor in City of Hope, Duarte

Painting in Duarte

Lead-safe rules for homes built before 1980, stucco prep under a hot foothill sun, design review for color changes and sourced paint prices.

See Duarte painting →
Close-up of smooth trowel-finished concrete with precise saw-cut control joints, soft side light, concrete by a general contractor near Duarte in Glendora

Concrete in Duarte

The 3 inch driveway minimum, hillside grading above Sunnydale Drive, native tree permits, retaining walls and pour costs in Duarte.

See Duarte concrete work →
Raised composite deck with a cable railing and outdoor dining set on a hillside lot, canyon view, decks by a general contractor in Duarte/City of Hope station, Duarte

Decks in Duarte

The 200 square foot permit line, yard projections, patio cover limits, fire zone decking, hillside rules and deck repair in Duarte.

See Duarte deck building →
A tall cedar board-on-board privacy fence along a suburban backyard with raised planter beds and fre, fencing by a general contractor near Duarte in Baldwin Park

Fencing in Duarte

No building permit to 6 feet but design review for every fence, 4 foot R-1 fronts, a chain link ban and 10 foot hillside retaining wall caps.

See Duarte fencing →
Foothill city, 1957 charter

What should a Duarte owner know before hiring a general contractor?

Duarte sits on land first granted as Rancho Azusa de Duarte to Andrés Avelino Duarte on May 10, 1841, a grant that now covers the city and Bradbury plus parts of five neighboring cities. According to Wikipedia, citrus came first, and the City of Hope began as a tent sanitarium in 1913. The city incorporated on August 22, 1957, and grew from 13,962 residents in 1960 to 20,688 in 1990, with old Route 66 running along Huntington Drive. The houses show that history. Census ACS 2024 5-year estimates count 7,832 housing units, 63.9 percent of them single-family detached, with a median year built of 1968. The 1950s are the largest decade at 23.4 percent, about 72 percent of units predate 1980, and the median owner-occupied value is $779,400. Expect lead paint questions on a house painting, window replacement or bathroom remodel job, and since 39.0 percent of occupied homes are rented, a landlord's signature often comes first.

Duarte's paperwork runs in a fixed order. The posted code adopts the 2025 California codes in Municipal Code 16.04, last amended by Ordinance 25-05 on December 9, 2025, names the community development director as building official, and asks for a Zoning Clearance before any construction permit (19.128.020.B). Work that needs Site Plan and Design Review cannot get a building permit until that review ends (19.122.020.B), and the review covers every fence and wall, roof pitch changes and many additions even where no building permit is required. Every City of Duarte page returned an HTTP 403 error to our automated checks, so we read the code on the GoCodebook mirror and the state permit-exempt list in a third-party copy published by the City of Albany. Confirm each section with Duarte's Building & Safety Division before relying on it, most of all for a kitchen remodel, a room addition or new flooring, where the line between a finish update and permitted work moves with the scope.

The hillside line is the second rule that sorts jobs. Every lot in the R-1B, R-1D and R-1F zones, plus R-1 and R-1A lots north of Sunnydale Drive and Brookridge Road, falls under Chapter 19.46, which brings wildland-urban interface construction for new building, geologic and biological reports, fuel modification landscaping within 500 feet of the house and a 10 foot cap on retaining walls. In the high fire zones the code allows only Class A roof assemblies (16.04.140) and tempered window glass (16.04.150), which shapes a roof repair or a window order. Which parcels sit in those zones is unverified: CAL FIRE issued new maps in March 2025, and we could not open the City's fire map page, so look up the address with the City or the CAL FIRE viewer. The June 2016 Fish Fire, which started in Fish Canyon, put parts of the city under a multi-day evacuation order, a reminder that foothill fence, deck and concrete choices are fire choices too. Flatter lots near Huntington Drive face other tests. Chapter 16.40 asks for a development permit for paving and grading so staff can flag flood-prone parcels, and native trees of 12 inches or more need a City tree permit before anyone grades, fills or surfaces around them.

The ADU section also needs a careful read. Section 19.60.160.D as posted on the mirror still prints an owner-occupancy requirement, which conflicts with Government Code 66315, so we treat it as a question for the City, not a rule, and our ADU construction page lists the other lines to confirm. Next-door cities write their own rules: guides for Monrovia, Azusa, Baldwin Park, Arcadia, Covina and Glendora are live, while Bradbury and Irwindale also touch Duarte and have no guide yet. On every job here MDG Builders (CSLB #1040337) acts as the general contractor that writes the scope, files the permits and runs the schedule, and licensed specialty subcontractors do the building work.

A white wooden picket fence with a matching gate along the front yard of a California bungalow, fencing by a general contractor in Duarte City Hall, Duarte
  • Duarte incorporated on August 22, 1957, on land from the 1841 Rancho Azusa de Duarte grant.
  • ACS 2024 5-year estimates put the median year built at 1968, with 72.0 percent of units older than 1980.
  • Lots in R-1B, R-1D and R-1F, and R-1 and R-1A lots north of Sunnydale Drive and Brookridge Road, follow the Chapter 19.46 hillside rules.
  • The posted code needs no building permit for fences up to 6 feet, yet every fence and wall still goes through Site Plan and Design Review.
  • High fire zones allow only Class A roofs and tempered windows, but parcel zones after CAL FIRE's March 2025 maps are unconfirmed.
  • Every City of Duarte page returned a 403 error, so code text comes from GoCodebook and the state exempt list from a City of Albany copy.
Nearby

Cities near Duarte we also build in

FAQ

Questions Duarte owners ask before hiring a contractor

Where do I get a building permit in Duarte?

Start with the City of Duarte Community Development Department, Building & Safety Division, which the posted code names as the building official's office. We could not open the City's permit pages, so confirm counter hours, forms and fees with the City. Expect a Zoning Clearance from Planning before the building permit, and design review first where it applies.

Does a fence need a permit in Duarte?

Not a building permit for most backyard fences, but design review still applies. The posted code exempts fences up to 6 feet other than pool barriers, one foot below the state's 7 foot line, and sends all fences and walls through Site Plan and Design Review. Chain link is barred in residential zones, so confirm both with the City.

Which part of Duarte counts as hillside?

Every lot in the R-1B, R-1D and R-1F zones, plus R-1 and R-1A lots north of Sunnydale Drive and Brookridge Road, falls under Chapter 19.46. That brings geologic and biological reports, fuel modification landscaping and a 10 foot retaining wall cap. The code text comes from a mirror, so ask Planning to place your parcel.

Is my Duarte house in a high fire hazard zone?

We cannot say, and no website can without your address. The code designates zones through a City map, and CAL FIRE issued new Southern California maps in March 2025. We could not open the City's map page, so check the parcel with the City or CAL FIRE's viewer before choosing a roof, vents or windows.

Do I need a lead-safe contractor for an older Duarte home?

Probably, for paid work on a house built before 1978. EPA's Renovation, Repair and Painting rule covers repaints, window replacement and remodels that disturb paint, and about 72 percent of Duarte's units predate 1980. Ask any contractor for the firm's EPA lead-safe certification before work starts, since small jobs under the area limits are the only exemption.

Can I build an ADU in Duarte if I do not live on the property?

Possibly, but confirm it first. The mirror's text of section 19.60.160.D still prints an owner-occupancy requirement, while Government Code 66315 does not allow one for an ADU. We treat that as a conflict, not a rule. Ask Building & Safety in writing which reading it enforces today, before you buy or sell a property for a unit.

Do I need a tree permit to work near an oak in Duarte?

Possibly, if the tree is a protected native 12 inches or more across, or a specimen tree of 24 inches or more. The code requires a City tree permit before removal or alteration, and alteration includes grading, filling or surfacing the soil around the trunk. Pour or trench near a tree only after asking Community Development.

How do I check a contractor's license in Duarte?

Look up the license number on the CSLB website, which shows the classification, bond and status. Ours is CSLB #1040337, held by MDG Builders as a general contractor. Permitted work needs a licensed contractor, and you can request every subcontractor's license number and proof of insurance in writing before the schedule is set.

Free estimate

Describe your Duarte job

Tell us the job, the neighborhood and roughly when the home was built. We check the hillside line and design review before we call you back.

Free estimate · A real person answers · (888) 666-8224

Call (888) 666-8224