General Contractor Covina, CA: Citrus Town Rules for Tract Homes
A general contractor in Covina deals with Planning before Building: every wall and fence needs a Planning permit, paving near a protected oak needs a tree permit, and paper plan check at City Hall runs weeks. About 76 percent of homes predate 1980. MDG Builders, CSLB #1040337, manages all eleven trades here.
Eleven Covina guides, from kitchens to fences
Each guide below takes one trade and ties it to Covina's code sections, handouts and housing stock, and it names the points where the City's own papers do not agree.

Kitchen Remodeling in Covina
A City kitchen handout dated 2023, paper plan check at the counter, GFCI and range hood rules, and 1950s tract kitchens in Covina.
See Covina kitchen remodeling →
Bathroom Remodeling in Covina
The permit line in the City handout, fan and fixture rules, tract-house baths and condo approvals for Covina bathrooms.
See Covina bathroom remodeling →
ADU Construction in Covina
Chapter 17.69 approval tracks, the HCD findings, garage conversions, the southeast fire zone and utilities for Covina ADUs.
See Covina ADU construction →
Room Additions in Covina
Lot coverage and yards, the Planning-first approval path, second stories, protected oaks and soils for Covina additions.
See Covina room additions →
Roofing in Covina
The 200 square foot permit line, Class B coverings, 1950s tract roofs and the southeast fire zone for Covina homes.
See Covina roofing →
Windows in Covina
Same-size permits, dual glazing limits, egress openings, lead-safe rules and the southeast fire zone for Covina windows.
See Covina window replacement →
Flooring in Covina
Lead and asbestos checks for 1950s tract homes, slab moisture tests, condo approvals, the permit exemption and what a flooring job costs in Covina.
See Covina flooring →
Painting in Covina
No permit for paint, Planning approval before color changes, lead-safe prep for 1950s tract homes and stucco care in Covina.
See Covina painting →
Concrete in Covina
Heritage oak permits, front yard paving approval, right of way rules, retaining and block walls, soils and pour costs in Covina.
See Covina concrete work →
Decks in Covina
The 200 square foot and 30 inch permit lines, patio cover rules, oak dripline footings, fire zone boards, deck repair limits and deck costs in Covina.
See Covina deck building →
Fencing in Covina
A Planning permit for every wall, 4 and 5 foot front yard limits, the chain-link ban and heritage oak rules in Covina.
See Covina fencing →What should a Covina homeowner know about the city's rules before choosing a general contractor?
Covina began as a citrus railroad town. Wikipedia dates its founding to 1884, although other sources say 1882 or 1885, and voters incorporated the city on August 14, 1901. By 1907 it was already claimed as the third-largest orange shipping point in the world. The groves then gave way to subdivisions: the census table shows 3,956 residents in 1950, 20,124 in 1960 and 30,395 in 1970. The Census Bureau's 2020 to 2024 estimates count 16,978 housing units, and 33.2 percent of them were built in the 1950s and 23.9 percent in the 1960s. That puts roughly 76 percent before 1980 and 38.6 percent before 1960, so the typical job is a tract house of sixty to seventy years with original wiring, aging drain lines and, possibly, lead paint under the newer coats. Detached houses make up about 53 percent of units, apartment buildings of five or more units hold another 25.7 percent, renters occupy 41.2 percent of homes, and the median owner value is $718,900. Those numbers shape a kitchen remodel, a bathroom remodel, new flooring and a repaint alike, because landlords, associations and old materials come into play before any tile is chosen.
Two counters decide the order of work. The Building and Safety Division at City Hall serves the public Monday to Thursday from 7 a.m. to 6 p.m., closes from 1 to 2 p.m. and stays shut Friday through Sunday. Covina takes paper plans at that counter, offers no electronic plan check and no expedited review, and says a first submittal typically takes 4 to 6 weeks. Planning comes first for many jobs: its clearance is expected before Building accepts plans for a roof color or material change, a patio, a window moved even like for like, a shed of any size, added square footage, or a wall or fence. Express counter permits cover a re-roof and a like-for-like swap of windows, but each room addition goes the long way, with zoning, setbacks and lot coverage reviewed first. Check the jurisdiction too: a Covina mailing address numbered above 2999, or one south of the 10 Freeway, may sit in unincorporated county territory. We read the code text on the gocodebook.com mirror and some City handouts carry old dates, so the kitchen and patio cover handouts are dated 1/1/2023 and cite the 2022 codes while the January 2026 handouts cite the 2025 codes. Confirm every number with the City before you rely on it.
Then come the rules that Covina owners rarely expect. Every fence and wall needs a wall and fence permit from Planning, front yard walls are limited to 4 feet when solid or 5 feet when half open, chain-link is banned, and block walls must be stucco-covered. The City's code and its Planning FAQ do not read the same on the front yard height and on whether a building permit follows, so ask at the counter before you order anything. A heritage oak 10 inches or more across at 4.5 feet is protected, and paving, trenching or changing grade inside its dripline needs a tree preservation permit, which touches concrete work and the footings of a deck as much as a fence post. About 3.8 percent of the city, in the southeast corner, overlaps a CAL FIRE Very High fire zone, where wildland-urban interface construction, tile or similar roofing and a defensible space apply, and the City's chapter 17.33 keeps SB 9 projects out of that corner. Elsewhere the City's design criteria call for a soils investigation, list Seismic Design Category E or F and set a 110 mph ultimate wind speed. Historic review is voluntary, and the Los Angeles Conservancy reports that the City had designated no landmarks, so most addresses face none.
The ADU picture is the least settled. The City handles ADU construction under chapter 17.69 without a hearing, but HCD's June 2, 2026 letter listed seven problems with Ordinance 25-15 and we do not know how the City answered, so setbacks and design standards deserve a call to Planning before a quote. Weather matters as well. NOAA's 1991 to 2020 normals for the Covina City Yard station show 16.74 inches of rain a year, 13.47 of it from December through March, and the Pomona station logs 70.5 days of 90 degrees F or hotter each year, so summer is the season for pours, paint and roofs. Under CSLB #1040337, MDG Builders serves as the contractor in charge: we write the scope, file the paperwork, book licensed specialty subcontractors and inspect the result with you, and each subcontractor's license and insurance certificate can be requested. Read how a general contractor uses subcontractors and how to check a license, then see our neighbors in West Covina, Baldwin Park, Pomona and Diamond Bar.

- Covina incorporated on August 14, 1901, and the census table shows 30,395 residents by 1970.
- Roughly 76.2 percent of Covina's housing units date from before 1980.
- Covina takes paper plans at the counter and has no electronic plan check.
- Heritage oaks 10 inches or more across at 4.5 feet are protected inside their driplines.
- About 3.8 percent of the city, in the southeast corner, overlaps a Very High fire zone.
- The Covina City Yard station averages 16.74 inches of rain a year.
Cities near Covina we also build in
Covina contractor questions, answered plainly
Who issues a Covina building permit, and how long does plan check take?
Apply at the Building and Safety counter in City Hall, because Covina takes paper plans and has no electronic plan check. Staff say a first submittal typically takes 4 to 6 weeks, and the counter is closed Friday through Sunday. Planning may need to clear the project first, so call before you assemble the set.
How do I know my address is inside the City of Covina?
Use the jurisdiction checker the City publishes on its website. Some properties with a Covina mailing address, especially numbers above 2999 or lots south of the 10 Freeway, may be in unincorporated Los Angeles County instead. County parcels follow a different office, different fees and different rules, so settle this before any drawings start.
Does every fence and wall in Covina need a permit?
Every fence and wall needs a wall and fence permit from Planning, according to the City's rules. Whether a building permit also applies depends on which City document you read, and they do not fully agree. Block walls must be stucco-covered and chain-link is banned, so confirm the plan at the counter first.
How tall can a front yard wall be in Covina?
The City's rules set 4 feet for a solid front yard wall and 5 feet if it is half open. Its code and its Planning FAQ do not read identically on this point, so treat those figures as a starting point. Ask Planning to confirm the height for your zone before ordering materials or booking a crew.
Can I pave or dig near an oak tree in Covina?
Only with a tree preservation permit if the work falls inside the dripline of a protected oak. The rule covers oaks 10 inches or more across at 4.5 feet, or 22 inches combined for multi-trunk trees. Paving, trenching and grade changes all count, so mark the oak and its dripline on the site plan.
Is my Covina home in a fire hazard zone?
Probably not, but a pocket is. About 3.8 percent of the city, all in the southeast corner, overlaps CAL FIRE's Very High layer in our screening, and the City designates a Very High zone in chapter 14.13. Ask the City or County Fire about your parcel, because construction rules change inside it.
Can I still build an ADU in Covina?
Yes, chapter 17.69 of the Municipal Code treats ADUs as ministerial, with no hearing. HCD's June 2, 2026 letter found seven problems with the City's ordinance, and we could not find the City's response, so confirm setbacks, size limits and design rules with Planning before you pay for plans.
Do lead-safe rules apply to older Covina houses?
For most of them, yes. About 76.2 percent of Covina's housing units were built before 1980, and federal lead-safe rules reach paid jobs that disturb paint in pre-1978 housing. A repaint, a window swap or a remodel can trigger it, so use a certified firm and test first.
Tell us about your Covina property
Send the address, the trade and a few lines on what you want done. We check the parcel for jurisdiction, fire zone, slope and oak trees first, then call to explain which City approvals fit your scope.