General Contractor West Covina, CA: Tract Homes, Hills and Zoning Approvals
A general contractor in West Covina has to plan around two city offices, not one: the Building Division issues permits, while Planning handles zoning clearances and administrative permits under the 2024 Development Code. About 77 percent of homes predate 1980. MDG Builders (CSLB #1040337) runs all eleven trades on West Covina homes.
All eleven trades, each with its own West Covina page
Pick the job you are weighing. Each page below applies West Covina's own permit rules, setbacks and housing history to that one trade and links the City documents it relies on.

Kitchen Remodeling in West Covina
Permit and Zoning Clearance, 1950s ranch kitchens, wall removal, window changes, rentals and costs for West Covina kitchens.
See West Covina kitchen remodeling →
Bathroom Remodeling in West Covina
Permits, the Zoning Clearance, 1950s tract plumbing, lead checks and condo rules for West Covina bathrooms.
See West Covina bathroom remodeling →
ADU Construction in West Covina
The 30-day Second Unit Review, May 2025 size and setback guidelines, garage conversions and hillside lots in West Covina.
See West Covina ADU construction →
Room Additions in West Covina
Second-story Administrative Permits, 500-foot notice, setbacks, lot coverage and soils for a West Covina addition.
See West Covina room additions →
Roofing in West Covina
Re-roof permits, fire hazard zones in the San Jose Hills, solar roof rules and what 1950s tract roofs need.
See West Covina roofing →
Windows in West Covina
The Zoning Clearance for window changes, permit questions, glass for 90 degree summers and replacement windows in 1950s tract homes.
See West Covina window replacement →
Flooring in West Covina
No permit for most finish flooring, asbestos checks under 1950s tract floors, slab moisture tests and HOA or landlord approval in West Covina.
See West Covina flooring →
Painting in West Covina
No permit for ordinary paint, but lead-safe rules for 1950s tract homes, approvals on exempt work and low-VOC limits apply.
See West Covina painting →
Concrete in West Covina
Driveway width caps, the half-landscaped front yard rule, retaining wall permits, hillside and landfill questions and pour costs in West Covina.
See West Covina concrete work →
Decks in West Covina
The 30 inch permit line, 1.5 times setbacks, San Jose Hills hillside rules, fire zone boards, deck repair limits and deck costs in West Covina.
See West Covina deck building →
Fencing in West Covina
Open front fences to 6 feet, 7 foot side and rear fences, hillside retaining walls and pool barrier rules for West Covina lots.
See West Covina fencing →How do West Covina's tract homes, hills and zoning rules shape a remodeling job?
Start with how the city was built. The Tongva lived in this valley first, and Rancho La Puente, roughly 48,000 acres, was sold to Workman and Rowland in 1845. Walnut groves and then orange groves covered the land, the area was known as Walnut Center until 1909, and residents incorporated West Covina in 1923 partly to keep Covina from placing a sewage farm next door. George Meeker's Sunkist Village (1941) was among the first large tracts. Then came the boom: 4,499 people in 1950, 50,645 in 1960, helped by the San Bernardino Freeway in 1955 and the West Covina Center and Eastland Center shopping areas. The Census Bureau's 2024 five-year estimates show 34,287 housing units, 35.3 percent of them built in the 1950s and 76.6 percent before 1980. About 64 percent are detached houses and 39.7 percent of households rent. A City survey in 2006 began with only about 300 houses built before 1946, so the typical West Covina project is a postwar tract house with original wiring, aging plumbing and, behind some finishes, lead paint or asbestos. That is the reality behind a kitchen remodel, a bathroom remodel or new flooring.
Permits begin at the Building Division in City Hall, and the Building Division page says it no longer takes applications by email. Plans go through the One Stop Building Permit Center portal, and the counter in Room 215 serves walk-ins Monday through Thursday from 7:30 a.m. to 5:30 p.m. The Fire Prevention Bureau reads every plan set against the 2025 California codes, reviews have been digital only since June 1, 2023, and starting work before the permit is issued invites a stop-work notice and a non-compliance fee. The Master Fee Schedule effective January 1, 2026 sets plan check at 85 percent of the building permit fee. Either the owner or a California-licensed contractor can pull the permit; a contractor shows the state license card, a City business license and proof of workers' compensation. Work on site is allowed from 7:00 a.m. to 8:00 p.m., and only Athens Services may haul construction debris, because the City impounds roll-offs from other vendors.
The second office is Planning, and this is where West Covina differs from many neighbors. Ordinance 2525 rewrote the zoning chapter in March 2024. A $92.66 Zoning Clearance now sits in front of patio covers, pools, interior remodels and, in a second group, window and door changes, demolition and new driveway approaches. A second story in an R-1 zone goes through an Administrative Permit with notice to neighbors within 500 feet. Accessory structures over 120 square feet or 7 feet tall need one too, which matters for patio and deck projects, and an ADU gets a separate Planning review within 30 days before plan check can start. Side and rear fences can now reach 7 feet, yet the Building Division's no-permit exemption stops at 6, so the counter should confirm a tall one. Out front, a driveway is held to the garage width plus 12 feet and half the front yard must stay planted or approved artificial turf. By contrast, the City's FAQ lists painting and flooring as work that needs no building permit.
The ground adds a third layer. In the hilly south, the San Jose Hills are a mapped Hillside Overlay: slopes over 45 percent stay ungraded and density is capped at one home per gross acre. A sample of 116 points across the city in CAL FIRE's state map returned 9 High and 1 Very High fire hazard readings, all in that southern and southeastern area, so check the exact address before choosing a roof or windows. The former BKK landfill also sits in the south; we found no City building rule for it, so ask the Building Division if your lot is near. Oaks, sycamores and native black walnut trees above a size threshold need a City tree permit, and a homeowners association can add limits on top of the City's. Rain averages about 15 inches a year, with roughly 70 days a year at or above 90 F. MDG Builders holds the contractor license and the permits, writes the scope, books licensed specialty subcontractors, and walks the finished work with you; ask for any subcontractor's license number and proof of insurance, and read how that arrangement works. Nearby cities include Covina, Baldwin Park, La Puente, Walnut, Azusa and Diamond Bar.

- Ordinance 2525 rewrote West Covina's zoning chapter, effective March 2024.
- The Building Division counter is open Monday through Thursday, 7:30 a.m. to 5:30 p.m.
- Sunkist Village (1941) is the only clear potential historic district the City's 2006 survey found.
- Population grew from 4,499 in 1950 to 50,645 in 1960 as groves became tracts.
- About 35 percent of West Covina homes were built in the 1950s.
- Plan check costs 85 percent of the building permit fee under the 2026 fee schedule.
Cities near West Covina we also build in
West Covina project questions we hear most
How do I submit plans for a West Covina building permit?
Upload them through the One Stop Building Permit Center portal, because the Building Division no longer accepts applications by email. The counter in City Hall Room 215 also takes applications Monday through Thursday, 7:30 a.m. to 5:30 p.m. The City's e-submittal instructions say plans filed after hours are checked for completeness the next business day.
Do painting or new flooring need a permit in West Covina?
Not a building permit. The City's FAQ lists interior and exterior painting and flooring such as tile, carpet, laminate and vinyl as work that does not need one. Moving plumbing or electrical for a new layout does, and Planning approval can still apply to an otherwise exempt job, so ask first.
Do I need Planning approval before adding a second story?
Yes. A second story in an R-1 zone goes through an Administrative Permit, which requires notarized owner permission, plans, a mailing list and a radius map. The City approves within 30 days or sends neighbor notice, with a hearing if anyone requests it. Single-family height is limited to two stories and 25 feet.
How tall can a side or rear fence be in West Covina?
Up to 7 feet between single-family lots under the Development Code, or 8 feet where a residential lot meets commercial land. Front setback fences stop at 6 feet and must be 70 percent open above 42 inches. Because the Building Division exemption ends at 6 feet, confirm a 7 foot fence with the counter.
How big can a detached ADU be in West Covina?
Up to 1,200 square feet under the City's ADU guidelines updated in May 2025, with a 16-foot height limit and 4-foot side and rear setbacks. Planning reviews the application within 30 days. That approval only lets you submit for plan check; it is not a construction permit.
Is the south side of West Covina a fire or hillside area?
Parts of it are. The San Jose Hills carry a Hillside Overlay, and a sample of points on CAL FIRE's state map found High and Very High readings only in the south and southeast. A sample is not a parcel map, so look up the exact address on the City's fire hazard page or the CAL FIRE viewer.
Can I remove or trim an oak or walnut tree on my lot?
Only with a City tree permit if it is protected. That covers oaks, California and American sycamores and Southern California black walnuts six inches or larger, plus any front or street-side yard tree with a one-foot caliper. The form lists a $271.58 filing fee for the first tree. Ask before any driveway, fence or addition work near one.
Who can haul away construction debris on a West Covina job?
Athens Services, which holds the City's exclusive franchise for construction waste and recyclables. The Building Division handout says roll-off bins from other vendors on residential property, streets or alleys may be impounded, with a stated $500 fine for a first offense and $1,000 after. Your contractor should book the bin before demolition starts.
Tell us about your West Covina project
Share the address and what you want done. We look up the zoning, hillside and fire mapping first, then explain which West Covina approvals your plan will need and in what order.