Tarzana, CA · Serving Southern CaliforniaCSLB #1040337 · (888) 666-8224
Arcadia, CA

General Contractor Arcadia, CA: Five HOA Boards, Protected Oaks and Foothill Fire Rules

Quick answer

A general contractor in Arcadia coordinates up to four reviewers on one job: the City's Building Services, one of five homeowners association review boards, the Fire Department in the foothills, and a tree ordinance covering oaks and sycamores. Roughly 69 percent of homes were built before 1980. MDG Builders, CSLB #1040337, handles all eleven trades on Arcadia houses.

Services

Eleven trades, each written for Arcadia's own streets and rules

Choose the job you are planning. Every guide below applies Arcadia's permit paperwork, lot standards and neighborhood boards to that single trade and points to the City documents we read.

Range wall of a kitchen: stainless gas range, plaster range hood, zellige tile backsplash, kitchen remodeling by a general contractor near Arcadia in Sierra Madre

Kitchen Remodeling in Arcadia

Separate trade permits, EDGE filing, the 50 percent rebuild rule, 1950s homes, HOA boards and fire-area triggers for Arcadia kitchens.

See Arcadia kitchen remodeling →
Primary bathroom: freestanding white tub, bathroom remodeling by a general contractor in Santa Anita Park, Arcadia

Bathroom Remodeling in Arcadia

Separate plumbing and electrical permits, 1950s walls and pipes, HOA board questions and the Energy Code fan rule for Arcadia bathrooms.

See Arcadia bathroom remodeling →
Finished modern stucco ADU with a small front porch and warm lights on at dusk, adu construction by a general contractor near Arcadia in Temple City

ADU Construction in Arcadia

The 60 day ministerial clock, protected oak and sycamore zones, foothill fire and fault checks, and two City documents that disagree.

See Arcadia ADU construction →
New room addition framing attached to an existing house: wall studs, room additions by a general contractor in Arcadia County Park, Arcadia

Room Additions in Arcadia

The 50 percent rebuild line, lot coverage and floor area by lot size, protected oak zones, HOA boards and foothill fire triggers for Arcadia additions.

See Arcadia room additions →
Barrel clay tile roof on a Spanish-style California house with white stucco walls and an arched entr, roofing by a general contractor near Arcadia in Monrovia

Roofing in Arcadia

Foothill fire zone roofs, the 25 percent re-roof trigger, five HOA review boards, the re-roof permit form and 1950s housing in Arcadia.

See Arcadia roofing →
Exterior of a white stucco house with black-framed windows, a wooden front door, windows by a general contractor in Arcadia City Hall, Arcadia

Windows in Arcadia

The City window permit submittal, foothill fire glass rules, HOA boards, lead-safe work in 1950s houses and the heat and wind numbers for Arcadia.

See Arcadia window replacement →
Raised wood floor framing seen from a crawlspace, with joists, a girder on concrete piers, flooring by a general contractor near Arcadia in Duarte

Flooring in Arcadia

Floors in 1950s ranch houses, slab moisture, HOA board questions, foothill fire rules and what to ask a flooring contractor in Arcadia.

See Arcadia flooring →
Exterior of a California Craftsman bungalow freshly painted warm white with dark charcoal trim and a, painting by a general contractor in Highland Oaks Park, Arcadia

Painting in Arcadia

No City paint permit, five HOA review boards, lead-safe prep for 1950s ranch homes, historic questions and sun exposure in Arcadia.

See Arcadia painting →
A freshly poured concrete driveway slab with wooden forms and a long screed board resting across it, concrete by a general contractor near Arcadia in San Marino

Concrete in Arcadia

The 15 foot tree rule, driveway width and slope limits, retaining wall permits, foothill ground hazards and pour costs in Arcadia.

See Arcadia concrete work →
Deck stairs with a black metal railing and wide treads leading down to a lawn, decks by a general contractor in Highland Oaks Drive, Arcadia

Decks in Arcadia

Foothill fire rules, permit questions, protected tree zones, the roof deck ban, deck repair and costs in Arcadia.

See Arcadia deck building →
Horizontal slat redwood fence with a matching gate along a modern backyard with gravel and grasses, fencing by a general contractor near Arcadia in El Monte

Fencing in Arcadia

Open-work front yards, design review for new fences, 15 foot tree zones, block wall details and five HOA review boards in Arcadia.

See Arcadia fencing →
Arcadia basics

What should an Arcadia homeowner know about review boards, trees and fire rules before hiring a contractor?

Arcadia was ranch land before it was a city. According to the City's General Plan, the 1930s subdivisions replaced the northern part of Baldwin Ranch with the estate lots now overseen by the Rancho Santa Anita and Santa Anita Oaks associations, while farms raising poultry and produce in the south gave way to modest family homes. Arcadia incorporated in 1903, with Elias J. "Lucky" Baldwin as its first mayor, and the plan counts over 10,000 homes built between 1940 and 1960, a stretch when the population more than quadrupled. Census Bureau figures for 2020 to 2024 count 20,992 housing units: 26.4 percent date from the 1950s, 69.0 percent predate 1980 and 874 go back to 1939 or earlier. Detached houses are 56.9 percent of the stock, apartment-scale buildings of five or more units are 26.7 percent, and owners live in 58.1 percent of occupied homes. The usual job here, then, is a postwar ranch with original wiring, old drain lines and lead-era paint, whether the plan is a new kitchen, an updated bathroom or fresh flooring.

Permits start at the Building Services Division of Development Services, at 240 West Huntington Drive. Applications go through the EDGE online portal, plans are accepted in digital form only, and the counter answers questions at (626) 574-5416. A plan set can be routed to Planning, Building Services, Engineering, Fire Prevention and Public Works, depending on the job. The City's FAQ is the best short guide to what needs a permit. It requires separate electrical, plumbing and mechanical permits, and it requires one for window replacement. It lists painting as exempt work, which covers most house painting, and it lists walks and driveways as exempt while warning that zoning limits front-yard paving, a point we cover under concrete work. Walls over 18 inches tall need a permit, wood or wrought iron fencing up to 6 feet does not, and every new fence still faces design review. We found no City line about finish floors, so ask the counter before assuming a clean exemption. A re-roof has its own application form, covered on the roofing page. A permit runs one year and lapses after 180 days of idle work, and noisy construction is limited to weekdays until 6:00 p.m., Saturdays from 8:00 a.m. to 5:00 p.m. and never Sundays.

The City is only one of the reviewers. By Council resolution Arcadia recognizes five homeowners associations, among them Santa Anita Oaks, Santa Anita Village and Arcadia Highlands plus two Rancho Santa Anita groups, and every one has an Architectural Review Board. Three publish pre-approved roofing lists, and the two Rancho groups want a short review of any roofing material. Nothing we read lists which exterior jobs a given board covers, so ask the association before you order paint, tile or windows. Trees are the next filter. Under the tree chapter, small oaks (4 inches across) and western sycamores (6 inches) count as protected, larger trees of other oak species too, and walls and impervious paving are barred from a zone reaching at least 15 feet out from the trunk. That single limit reshapes driveways and patios, deck plans and the siting of an ADU. Scope matters too. Under Municipal Code Section 8130.5, a project that strips out over half of the floor assembly and over half of the outside walls is treated as a new building, which is why a big room addition gets measured before it gets drawn. On ADUs, the City posts the Ordinance 2401 text and an older Single Family standards PDF that disagree, so we followed the ordinance and suggest asking Planning which document the counter applies.

North of the freeway-side flats, the ground and the fire map change. The City's February 2025 newsletter calls the areas above Orange Grove Avenue and Sycamore Avenue Very High Fire Hazard Severity Zones, and the City's own wildfire handout asks for Class A roofs, no wood shakes, one-hour eaves, mesh vents, 20-minute glazing and a 25 percent re-roof trigger. Because the handout carries a 2011 date and refers to the 2010 code, confirm each line with Building Services before a roof or window order. The County's CAL FIRE layer was revised in August 2025, and we could not confirm whether the City has adopted it, so look up the exact address rather than trusting a neighborhood name. A point sample of the County's hazard maps also touched an earthquake fault zone and landslide zone along the foothill edge, and a mapped dam inundation area across roughly half the sample. Rain averages about 15.7 inches a year at the nearest NOAA station, roughly five miles southwest, with about 65 days at 90 F or higher. MDG Builders holds the license, drafts the scope and manages permits, then books licensed specialty subcontractors for the field work; request each one's license number and certificate of insurance, and see how that arrangement works. Close by, we also have area guides for El Monte, Pasadena and Baldwin Park; Temple City, Monrovia, Duarte, San Gabriel and Sierra Madre border or sit within a few miles.

Walk-in shower with a recessed tile niche, small mosaic floor tile, bathroom remodeling by a general contractor in Los Angeles County Arboretum, Arcadia
  • Arcadia incorporated in 1903, and the 1950s remain its largest building decade.
  • Five homeowners associations each run an Architectural Review Board of their own.
  • Protected oaks and sycamores keep walls and paving 15 feet or more from the trunk.
  • Building Services accepts plans digitally through the EDGE portal.
  • Removing over half the foundation and over half the exterior walls makes a remodel a rebuild.
  • About 69 percent of Arcadia homes were built before 1980.
Nearby

Cities near Arcadia we also build in

FAQ

What Arcadia homeowners ask before they hire

Where do I get a building permit in Arcadia?

Building Services, part of Development Services at City Hall, issues them, and applications go through the EDGE portal. Plans are accepted digitally. Phone (626) 574-5416 for counter questions. The City's FAQ lists painting as exempt, while window replacement and any electrical, plumbing or mechanical change need one, so the scope decides the paperwork.

Does my homeowners association approve work as well as the City?

Often, yes. Arcadia recognizes five associations, and each has an Architectural Review Board with design authority over its area. The City's page does not say which exterior jobs each board reviews, so ask yours before ordering paint, roofing or windows. City permit approval does not replace a board's sign-off, and the reverse is true as well.

Is my Arcadia house in a high fire hazard zone?

It may be if it sits above Orange Grove Avenue or Sycamore Avenue, which the City's 2025 newsletter calls Very High zones. We could not confirm whether the City has adopted the County's August 2025 CAL FIRE map. Ask Building Services and the Fire Department about your exact address, since a neighborhood name is not a parcel answer.

Does the foothill roof rule force a whole new roof?

Possibly. The City's wildfire handout says the whole roof must meet Class A or noncombustible standards once repairs and replacements in 12 months reach 25 percent of the original roof area. The handout is dated 2011 and cites the 2010 code, so confirm today's trigger with Building Services before you accept or reject a partial repair.

How close can a driveway or wall go to an oak in Arcadia?

Not within a protected tree's zone, and that zone reaches at least 15 feet from the trunk. Coast live and Engelmann oaks, other oaks, and western sycamores qualify once their trunks pass the size cutoffs in the City's tree chapter. Hand tools are expected inside the zone, and pruning needs an arborist's written recommendation first.

When does a remodel count as a rebuild in Arcadia?

Once the work removes over half of the foundation or floor assembly and over half of the exterior walls, per Municipal Code Section 8130.5. The whole house must then meet current zoning and building standards, and new-structure charges apply, school charges included on the entire floor area. Draw the demolition around that threshold from day one.

Which ADU rules does Arcadia follow?

Start with the ADU ordinance (Development Code Section 9102.01.080, amended through Ordinance 2401), which approves units without a hearing. The City also keeps an older Single Family standards PDF whose ADU section conflicts with it. Planning can say which one the counter applies, and state law governs wherever either falls short.

How tall can a front yard fence be in Arcadia?

In an R-1 front setback it appears to be about 3 feet, in open-work design, but the Development Code table prints badly, so confirm the figure for your zone with Planning at (626) 574-5423. Side and rear fences may reach 6 feet, and chain link, bamboo and spear tops are banned. New fences also go through design review.

Free estimate

Planning work on an Arcadia house?

Give us the street, the year the house was built and the job you have in mind. We look at the association, tree and fire-area questions for that lot first, then lay out which approvals come in what order.

Free estimate · A real person answers · (888) 666-8224

Call (888) 666-8224