General Contractor in Irvine, CA
A general contractor in Irvine works through three layers: a permit from the City's own Building and Safety office, the HOA or recorded deed restrictions of the village, and Orange County Fire Authority review where the 2025 fire map applies. MDG Builders, CSLB #1040337, manages all eleven trades here.
Start with the work: eleven guides built around Irvine's villages
Each guide below takes one trade and sets out what Irvine's City offices, bulletins and village layers say about it. The prices on those pages are Los Angeles figures, not Irvine quotes, and no permit fees are listed anywhere.

Kitchen Remodeling in Irvine
IrvineReady remodel permits, condo HOA permission, a pre-1994 fixture retrofit, addition setbacks and the 2025 code for new filings.
See Irvine kitchen remodeling →
Bathroom Remodeling in Irvine
Irvine's pre-1994 fixture rule, HOA approval letters, lead-safe work in 1970s villages, and the permit clocks that frame a bathroom job.
See Irvine bathroom remodeling →
ADU Construction in Irvine
Irvine's ADU route: the state's 2025 letter on the city ordinance, the IrvineReady packet, garage conversions, village HOAs and fire zones.
See Irvine ADU construction →
Room Additions in Irvine
Irvine's typical setbacks and 35 foot height, zero lot line and Shady Canyon exceptions, soil reports, sprinklers and the HOA letter.
See Irvine room additions →
Roofing in Irvine
Class A roofing required citywide, a July 2025 fire map, PermitsDIRECT re-roof permits and village HOA layers for Irvine homes.
See Irvine roofing →
Windows in Irvine
Irvine's same-size permit exemption, lead-safe rules for early villages, HOA review, fire-zone glass and what a bigger opening triggers.
See Irvine window replacement →
Flooring in Irvine
Condo and HOA approval, the permit question, slab moisture tests, asbestos in 1970s villages, tile floors and costs for flooring in Irvine.
See Irvine flooring →
Painting in Irvine
No paint permit, HOA and CC&R color approval, village architecture themes, the EPA lead rule and South Coast low-VOC limits.
See Irvine painting →
Concrete in Irvine
Zero lot line easements, the 30 inch exemption, grading triggers, retaining walls, HOA rules and pour costs in Irvine.
See Irvine concrete work →
Decks in Irvine
The July 2025 fire zone map, OCFA plans, patio cover setbacks, village easements, HOA letters, deck repair and wood versus composite cost in Irvine.
See Irvine deck building →
Fencing in Irvine
A front setback height formula, City documents that disagree on 6 or 7 feet, banned chain link and plain block, and HOA approvals.
See Irvine fencing →How do Irvine's villages, HOAs and City permits fit together before a contractor starts?
Irvine is a planned city, and the plan still shapes every job. James Irvine had assembled about 110,000 acres of ranch land by 1878. After the University of California asked the Irvine Company for 1,000 acres in 1959, William Pereira and the company's planners drew a city of villages split by six-lane arterials, each village given its own architectural theme, from the Atlantic Coast look of Woodbridge to the Italian Riviera and Mediterranean styling of Westpark. Turtle Rock, University Park, Westpark, El Camino Real and Walnut had their first phases finished by 1970, voters incorporated the city on December 28, 1971, and the 2003 annexation of the former El Toro Marine Corps Air Station added 7.3 square miles that became the Orange County Great Park. Census Bureau ACS 2024 estimates count 121,814 housing units, about 54 percent built in 2000 or later and only about 21 percent before 1980. Renters occupy 53.1 percent of the 115,091 occupied units, single-family detached homes are 38.8 percent of the stock, and the median owner-occupied value is $1,510,300. A young stock changes the questions. A kitchen remodel or bathroom remodel here is more likely to hit a condo association than lead paint, though the 1970s villages can still trigger EPA's lead-safe rule for a repaint and the district's asbestos rule for flooring demolition.
Irvine writes its own building code and issues its own permits, so nothing here goes through a county office. The Building and Safety division of Community Development takes applications electronically through the IrvineReady portal, and a handful of routine jobs, including a residential re-roof, a water heater, an HVAC changeout, a panel upgrade and rooftop solar, can be cleared the same day through PermitsDIRECT. The City asks a contractor to show an Irvine business license, a CSLB pocket card and a workers' compensation certificate. Applications filed on or after January 1, 2026 follow the 2025 state code with Irvine's amendments in Title 5 of the Municipal Code. Fire review goes to the Orange County Fire Authority, not a Los Angeles County agency. Two caveats from our research: the City's zoning ordinance text on its code website returned an access error, so we relied on the City's own web pages and information bulletins, and some of those bulletins are scanned images whose numbers we could not read, so we print none of them. Permit lifespans are also worth confirming, because an older bulletin and the newer amendments page give different durations. Under Irvine's rule for owners who pull their own permit, the City advises holding back final payment until the inspector passes the last inspection.
Overlays come next, and they depend on the village. Every new Irvine roof must be Class A, and a partial re-roof must match unless the covering that stays is Class B or lower. The City adopted the State Fire Marshal's 2025 fire hazard map in June 2025, effective July 23, and names Orchard Hills, Woodbury, Portola Springs, Quail Hill, Turtle Rock, Laguna Altura, Los Olivos and the Irvine Spectrum among the expanded areas. Which streets sit in the High tier and which in the Very High tier we have not verified, so look up the parcel on the City's interactive map. Zero-lot-line homes in Turtle Rock and University Park limit eaves, gutters and patio covers by easement, and Shady Canyon has a 15 foot setback in its 2.1A district and a 12 foot height cap on many patio covers and decks. On fencing the City's current page allows seven feet, while its Bulletin 185 revised in 2020 says six, so ask the Planning Counter at 949-724-6308 before ordering lumber. Concrete work near a recorded easement needs that easement read first. For an ADU, the state housing department told Irvine in January 2025 that its 2018 ordinance conflicts with state law, so ask the City for its current standards. A room addition can trigger a soils report, and new windows of the same size in the same opening are exempt from a permit.
Then come the layers the City does not control. Many villages have an HOA, some condominium projects have a Master HOA and a Sub-HOA, and even streets in Northwood, El Camino Real and Lower Peters Canyon without an association can carry recorded CC&Rs on paint colors and additions. A permit never replaces that approval. We have not verified the Irvine Company's own village design guidelines, so a color, roofing material or addition should be checked against your documents first. Heat varies too: NOAA's Irvine Ranch station averages 61.6 days at or above 90 degrees F, while the John Wayne Airport station, about 5.5 miles west, runs about ten degrees cooler in August. MDG Builders is the general contractor of record, CSLB #1040337. We scope the work, handle plan check, bring in licensed specialty subcontractors and walk the result with you, and you can request each subcontractor's license number and proof of insurance. Our article on how general contractors use subcontractors shows how that works. Neighbors such as Tustin, Costa Mesa, Newport Beach and Lake Forest do not have hub pages yet, so call us about a job there.

- Irvine incorporated on December 28, 1971, after the Irvine Company began building villages in the 1960s.
- The City's fire hazard map update took effect July 23, 2025 and expanded zones in Orchard Hills and Quail Hill.
- Only about 21 percent of Irvine's housing units date from before 1980, according to ACS 2024.
- Class A roofing is required on every new Irvine roof under a City amendment.
- About 35 percent of Irvine units sit in buildings of five or more units, so HOA permission comes up often.
- Median owner-occupied home value is $1,510,300, with a margin of error of about $88,000.
Cities near Irvine we also build in
Hiring a general contractor in Irvine: common questions
Does Irvine run its own building department or does the county?
Irvine runs its own. The City's Community Development Department handles permits, plan check and inspections, and applications are filed electronically through the IrvineReady portal. Fire service and fire plan review come from the Orange County Fire Authority. For permit questions the City lists 949-724-6313, and we cannot quote fees or turnaround times.
How do I find out if my Irvine house is in a fire hazard zone?
Look up the parcel on the City's interactive fire hazard map. Irvine adopted the State Fire Marshal's 2025 map in June 2025, effective July 23, with Moderate, High and Very High tiers. We have not verified which neighborhoods fall in High versus Very High, so confirm the tier for your address before choosing roofing, glass or a deck.
What roof rating does Irvine require?
Class A for every new roof. A City amendment also requires Class A on a partial re-roof that replaces less than half the covering in a year, unless the remaining roofing is Class B or lower and the replacement may match it. A residential re-roof is a permit job and can qualify for the same-day online system.
Do I need HOA approval as well as a City permit in Irvine?
Often both. For a condominium or townhome, the City requires the HOA board's written permission for work touching common areas. For a single-family home the City treats HOA review as a courtesy, but its stamped plans say the permit does not remove your association's rules. Streets without an HOA may still have recorded CC&Rs.
How tall can my fence be in Irvine?
The City's fence page says a fence can reach seven feet after the front setback rule, while Bulletin 185, revised in 2020, says six feet. Because the two City documents disagree, ask the Planning Counter at 949-724-6308 for your lot. A fence under seven feet needs no building permit, but zoning heights and your HOA still apply.
Is a condo remodel in Irvine handled differently from a house?
Yes. City Bulletin 222 says work in or affecting a common area, such as a skylight, patio cover, solar panels or an EV charger in shared parking, needs written HOA board permission and must be done by a licensed contractor, not an owner-builder. Interior remodels also need the HOA's design approval letter with the City application.
Can an unlicensed person do small jobs on an Irvine home?
Only up to $1,000 total, and not if the job needs a building permit or the person hires any worker. Since January 1, 2025 that is California's limit. Irvine also asks the permit holder for a City business license, a CSLB pocket card and a workers' compensation certificate, so most permitted work here needs a licensed contractor.
Are the prices on your Irvine pages actual Irvine quotes?
No. The price tables on the trade pages are Los Angeles figures from the sources named there, and Irvine costs can differ. We do not post fees or fixed prices for any city. A real number comes only from a written MDG Builders proposal after we see the home, its village and its association rules.
Start an Irvine project with MDG Builders
Tell us the village or street, the kind of job and whether an HOA governs the home. We check zoning, the fire map tier and association status first, then explain which Irvine approvals your scope is likely to meet.