Tarzana, CA · Serving Southern CaliforniaCSLB #1040337 · (888) 666-8224
Costa Mesa, CA

General Contractor in Costa Mesa, CA

Quick answer

A general contractor in Costa Mesa works with a City that issues its own permits through the TESSA portal, runs its own Fire and Rescue department instead of OCFA, requires a permit for every window and exterior door, and sets a Class B roof minimum outside its fire zones. MDG Builders, CSLB #1040337, manages all eleven trades here.

Services

Eleven trades, each checked against Costa Mesa's own permit list

Every guide reads one trade against the City documents we could open and the Census housing counts. The price tables are sourced regional ranges and not Costa Mesa quotes, and no City fee amount appears anywhere, because the fee schedule was not readable to us.

A small bright rental apartment kitchen freshly updated with white shaker cabinets, kitchen remodeling by a general contractor near Costa Mesa in Fountain Valley

Kitchen Remodeling in Costa Mesa

Postwar kitchens with old wiring and pipes, TESSA permits, Insta-Permit limits, apartment and condo kitchens and R1 setbacks for bump-outs.

See Costa Mesa kitchen remodeling →
Hall bathroom with a tub-to-shower conversion: white subway tile to the ceiling, clear glass panel, bathroom remodeling by a general contractor in College Park, Costa Mesa

Bathroom Remodeling in Costa Mesa

Costa Mesa's TESSA permit tracks, postwar homes and lead-safe work, rental and condo owners, shower glass, exhaust fans and a bathroom job's real sequence.

See Costa Mesa bathroom remodeling →
The backyard of a 1920s California bungalow cleared for a new backyard unit, with wooden stakes, adu construction by a general contractor near Costa Mesa in Newport Beach

ADU Construction in Costa Mesa

Costa Mesa's 2025 ADU ordinance after HCD's letter, size and setback limits, one of each ADU type per lot, garage conversions, curb rebuilds and fees.

See Costa Mesa ADU construction →
A 1960s stucco house with a freshly built second story, new windows and a low-pitched roof, room additions by a general contractor in Fairview Park, Costa Mesa

Room Additions in Costa Mesa

Costa Mesa's R1 setbacks, the rear yard cap, second stories, bluff-top setbacks, older tract houses, the chain link rule and the TESSA permit path.

See Costa Mesa room additions →
Barrel clay tile roof on a Spanish-style California house with white stucco walls and an arched entr, roofing by a general contractor near Costa Mesa in Corona del Mar

Roofing in Costa Mesa

Class B roofs, a re-roof Insta-Permit through TESSA, a 6 pounds per square foot limit and city-run fire review for Costa Mesa homes.

See Costa Mesa roofing →
Bedroom with two white double-hung windows, linen curtains, a bed with white bedding, windows by a general contractor in South Coast Plaza, Costa Mesa

Windows in Costa Mesa

Costa Mesa's permit and Planning review for every window and door, egress and slider rules, lead-safe work, Local Register homes, glass labels and fire zones.

See Costa Mesa window replacement →
A bare plywood subfloor in an empty room being prepared: clean screws in rows, flooring by a general contractor near Costa Mesa in Huntington Beach

Flooring in Costa Mesa

Old tract floors, renters and condos, the permit question, work-hour limits, slab moisture and costs for flooring in Costa Mesa.

See Costa Mesa flooring →
Exterior of a California Craftsman bungalow freshly painted warm white with dark charcoal trim and a, painting by a general contractor in Orange Coast College, Costa Mesa

Painting in Costa Mesa

Lead-safe rules for pre-1980 homes, stucco prep, Local Register questions, South Coast paint limits and sourced prices for Costa Mesa.

See Costa Mesa painting →
Stamped concrete patio in a slate pattern with a round fire pit and outdoor chairs, concrete by a general contractor near Costa Mesa in Irvine

Concrete in Costa Mesa

The 3 foot block wall rule, driveway widths, apron permits, bluff and fill limits, work hours and pour costs in Costa Mesa.

See Costa Mesa concrete work →
A rear deck of warm cedar boards on a 1920s California bungalow, with simple railings, decks by a general contractor in Diego Sepulveda Adobe, Costa Mesa

Decks in Costa Mesa

The 200 square foot exemption, setbacks and bluffs, termites, fire zones, deck repair and wood versus composite cost in Costa Mesa.

See Costa Mesa deck building →
Horizontal slat redwood fence with a matching gate along a modern backyard with gravel and grasses, fencing by a general contractor near Costa Mesa in Santa Ana

Fencing in Costa Mesa

A 6 foot permit exemption, a 3 foot masonry line, a corner-lot rule that conflicts with itself and a chain link removal trigger at $30,000.

See Costa Mesa fencing →
From a Harper rail siding to postwar tracts

What does a postwar Costa Mesa home, apartment building or listed property need before the first permit is filed?

Costa Mesa's name is younger than its farmland. Wikipedia's history says a town called Fairview formed near Harbor Boulevard and Adams Avenue in the 1880s, and the Harper community on a Santa Ana and Newport Railway siding took the name Costa Mesa, meaning coastal tableland, on May 11, 1920. The city then grew during and after World War II as thousands trained at the Santa Ana Army Air Base, and it incorporated in 1953 as a semi-rural farming community of 16,840 people that nearly quintupled within three decades. The Census Bureau's 2024 one-year estimates show the result: 44,365 housing units, about 62 percent built before 1980, with the 1970s at 24 percent, the 1960s at 23 percent and the 1950s at 13 percent, and only about 12 percent from 2000 on. Renters occupy 62.6 percent of the 41,303 occupied units, buildings of five or more units hold 38.3 percent of all units, and detached houses are 35 percent. The median owner-occupied home value is $1,166,800, give or take about $50,600. Single decades carry wide margins of error, so treat the era shares as approximate. For a kitchen remodel or bathroom remodel, a house of that age means plumbing and wiring from the same decades, and painting or window work on anything built before 1978 falls under the federal lead-safe rule. A flooring job on an older slab is worth a question about what lies under the old covering before demolition begins.

Costa Mesa issues its own permits. The Building Safety Division, part of Economic and Development Services at City Hall, takes plans through TESSA, the City's online portal. Its Permit Types handout lists four tracks: standard plan review, accelerated review, Insta-Permits, and Express Permits that were still marked coming soon. The Insta-Permit list covers a residential re-roof, panel upgrade, EV charger, solar, water heater, re-pipe and HVAC, each issued by email once the fee is paid. Municipal Code Section 5-1 adopts the 2025 California codes with local amendments, effective January 1, 2026. Here is how we read all of this. The City site, Municode and the State Fire Marshal's map pages returned 403 errors to our tools, so City pages come from Internet Archive copies and code text from the GoCodebook mirror, and either can lag the official version. Confirm any section with the City before you rely on it. The City also runs its own Fire and Rescue Department and does not belong to the Orange County Fire Authority, so fire plan review comes from City staff. On June 3, 2025, the Council adopted Ordinance 2025-03, which designates the fire hazard severity zones identified by CAL FIRE. ABC7 quoted a state fire official as saying Costa Mesa has no Very High tier. That is a third-party statement, and we could not read the parcel-level map, so ask the Building Division and Fire and Rescue whether any tier covers your lot. Outside those zones the City sets a Class B roof minimum on new roofs and whenever more than half of a roof is replaced within a year. That is not a Class A rule, and it belongs in the first conversation about any roof repair or replacement.

Several rules here surprise people who have built in other cities. First, every window and exterior door replacement needs a building permit and Planning approval before it issues, retrofit and flanged units alike, plus HOA approval where an association exists. Second, the fence exemption depends on material: wood, steel, vinyl or iron fences up to 6 feet skip the building permit, while stucco, concrete and masonry brick fences are exempt only up to 3 feet, and zoning heights apply either way. A fence project also meets the chain link rule, which makes a street-visible chain link fence come out before final inspection once permits total $30,000 within 12 months. Third, the City's wall handout and the code text disagree on corner lots: the handout names a 36 inch threshold for three zones, the code says 3.5 feet, and Figure 13-75(a) is an image we could not read, so Planning has to settle it for your lot. Fourth, a deck skips a permit only when it is 200 square feet or less, 30 inches or less above grade, detached from the house and not serving a required exit door. Concrete work adds driveway width limits, and anything touching the curb, apron or sidewalk involves Public Works. Construction hours run 7 a.m. to 7 p.m. on weekdays and 9 a.m. to 6 p.m. on Saturdays, with Sundays and six holidays closed, which shapes tear-off and pour schedules. Whether painting, flooring or cabinets need a permit is unverified, because no City page we could open names them, so call the Building Division at (714) 754-5273 before assuming either answer.

The ADU rules are the clearest corner of the code. Section 13-35, amended by Ordinance 2025-02 in April 2025, approves ADUs without a public hearing and allows one new-construction ADU, one conversion ADU and one junior ADU on a single-family lot. It caps a detached unit at 1,200 square feet and sets 4 foot side and rear setbacks and a 27 foot or two-story height limit. HCD's letter of September 11, 2024 found the City's earlier ordinance out of line with state law, and we did not read the City's reply, so our ADU guide tells you to verify the current text. For a room addition, the R1 table sets a 20 foot front setback, 5 foot interior side setbacks, a 27 foot or two-story limit and 40 percent open space. Historic status is the exception rather than the rule: the Local Register is voluntary, the City's 1999 list names 29 properties, and a listed property needs a Certificate of Appropriateness before its exterior changes. MDG Builders, CSLB #1040337, acts as the general contractor. We write the scope, prepare plans, file the permits and sequence the job, and licensed specialty subcontractors do the field work, each of whom can show a license number and a certificate of insurance when you ask. Two of our posts cover the model: how general contractors use subcontractors and how to check a contractor license. Nearby cities with their own guides are Irvine, roughly 5 miles east, Santa Ana, roughly 6 miles north, and Huntington Beach, about 5 miles west. Newport Beach, Fountain Valley and Tustin have no hub page yet, so call us about work there.

Wide-plank natural oak floor in a bright living room with a white sofa and a large window, flooring by a general contractor in Mesa Verde, Costa Mesa
  • Costa Mesa took its name on May 11, 1920 and incorporated in 1953, according to Wikipedia's history of the city.
  • The Census counts about 62 percent of the city's 44,365 housing units as built before 1980, and 62.6 percent of occupied units are rented.
  • The City requires a permit and Planning review for every window and exterior door replacement.
  • Roofs need at least Class B coverage outside the fire zones, and the City, not OCFA, reviews fire plans.
  • Wood, steel, vinyl or iron fences up to 6 feet are exempt from a building permit, but masonry fences only up to 3 feet.
  • We read the City's pages from Internet Archive copies and its code on the GoCodebook mirror, because the City, Municode and OSFM returned 403 errors.
Nearby

Cities near Costa Mesa we also build in

FAQ

Costa Mesa permit, roof and contractor questions, answered

Who issues building permits in Costa Mesa?

The Building Safety Division of the City's Economic and Development Services Department issues them, and applicants file plans through the TESSA online portal. The City lists standard plan review, accelerated review and email-issued Insta-Permits for jobs like re-roofs and water heaters. Fee amounts were not readable to us, so ask the division for the current schedule.

Does the Orange County Fire Authority review projects in Costa Mesa?

No. Costa Mesa has its own Fire and Rescue Department, and OCFA's list of 23 member cities does not include it. The City's Fire Code names that department as the code official, so fire plan review and fire permits come from City staff. Ask them directly about sprinklers or access on a larger project.

Is my Costa Mesa house in a fire hazard severity zone?

We cannot say for any address. The City adopted Ordinance 2025-03 on June 3, 2025, and ABC7 quoted a state fire official saying the city has no Very High tier, which is a third-party statement. We could not open the parcel map, so ask the Building Division or Fire and Rescue to check your lot.

What roof class does Costa Mesa require?

At least Class B outside the fire zones, for new roofs and whenever more than half of a roof is replaced in one year. The City amends its Residential Code to allow only Class A or B coverings. Parcels inside a mapped fire zone follow the Wildland-Urban Interface Code instead, so verify your parcel before ordering material.

Do I need a permit to replace windows in Costa Mesa?

Yes. The City's window handout says every window and exterior door replacement needs a building permit, whether retrofit or new-construction flanged, and that Planning must approve before it issues. It asks for a floor plan and a window schedule, and HOA approval where one applies. The handout cites older energy numbers, so recheck them.

How tall can a fence be in Costa Mesa without a building permit?

Wood, steel, vinyl or iron fences up to 6 feet need no building permit, but stucco, concrete or masonry brick fences are exempt only to 3 feet. Zoning height limits still apply, and chain link visible from the street must be removed once permits reach $30,000 in 12 months. Confirm front-yard heights with Planning.

How big can an ADU be in Costa Mesa?

A detached ADU on a single-family lot is capped at 1,200 square feet, and an attached one at the greater of half the existing home or 1,000 square feet, per Section 13-35 as mirrored on GoCodebook. A junior ADU is limited to 500 square feet. Confirm the current text with the City, since HCD flagged the earlier ordinance.

Do painting, new flooring or cabinet swaps need a permit in Costa Mesa?

We could not confirm either way. No City page we opened lists painting, flooring or cabinets, and the City amends only three entries of the model exempt list: fences, prefabricated pools and decks. Work that moves plumbing, electrical or structure clearly does need review. Ask the Building Division at (714) 754-5273 about your exact scope.

Free estimate

Tell MDG Builders about your Costa Mesa project

Share the cross streets, roughly what decade the building dates from and whether it is a house, a duplex or part of a complex with an HOA. We start by deciding which approvals apply, then the roof class, the fence and window rules and any listed-property question, and tell you what the City is likely to look at.

Free estimate · A real person answers · (888) 666-8224

Call (888) 666-8224