General Contractor in Newport Beach, CA
A general contractor in Newport Beach starts with the lot, because bay, bluff, mesa and canyon addresses face different reviews. The City runs its own permit counter, a coastal development permit can reach even a fence, and a remodel worth half the building's market value can trigger whole-building code. MDG Builders, CSLB #1040337, manages all eleven trades here.
Eleven trades MDG manages around the harbor
Each page below takes one trade and applies Newport Beach's code sections, water and fire overlays and housing stock to it, with official sources linked. Pick the job closest to yours.

Kitchen Remodeling in Newport Beach
A 50 percent of market value code rule, flood zone materials, a record tide in October 2026, fixture swaps and CO alarms.
See Newport Beach kitchen remodeling →
Bathroom Remodeling in Newport Beach
Newport Beach's 50 percent of market value rule, plumbing fixture swaps, flood-zone materials and the permit clocks behind a bathroom job.
See Newport Beach bathroom remodeling →
ADU Construction in Newport Beach
Newport Beach's ADU route: coastal permit questions, plan check and deed restriction, garage conversions, Safe ADU and flood and fire overlays.
See Newport Beach ADU construction →
Room Additions in Newport Beach
Newport Beach's coastal permit test, the Cottage Preservation program, flood-zone floor heights, soils reports and sprinkler triggers.
See Newport Beach room additions →
Roofing in Newport Beach
An express online reroof permit, a Class B or C conflict to confirm, wildfire roof rules and bay-front lots in Newport Beach.
See Newport Beach roofing →
Windows in Newport Beach
Newport Beach's online window permit, lead-safe rules for older homes, fire-zone glass, egress sizes and coastal versus inland heat.
See Newport Beach window replacement →
Flooring in Newport Beach
Flood-recovery permits, the 50 percent rule, condo sound rules, old adhesives and slab moisture for flooring in Newport Beach.
See Newport Beach flooring →
Painting in Newport Beach
No permit for painting itself, lead-safe rules for older homes, Saturday limits in high density areas and low-VOC paint in Newport Beach.
See Newport Beach painting →
Concrete in Newport Beach
Coastal permits, seawall raises, the 9.00 foot slab rule, methane districts, retaining walls and pour costs for concrete work in Newport Beach.
See Newport Beach concrete work →
Decks in Newport Beach
Coastal review, cottage height limits, fire zone boards, the 200 square foot rule, deck repair and wood versus composite cost in Newport Beach.
See Newport Beach deck building →
Fencing in Newport Beach
42 inch front setback caps, 5 foot open fences on the islands, a 3.5 foot masonry permit line, pool barriers and coastal checks.
See Newport Beach fencing →What should a Newport Beach owner understand before choosing a general contractor?
Start with how the city was put together. A steamer landed at McFadden's Landing in 1870, a railway to Santa Ana followed in 1891, and by 1902 the peninsula town site belonged to William Collins and Henry Huntington, who watched the Pacific Electric Red Car arrive in 1905. Between 1902 and 1907 West Newport, East Newport, Balboa, Corona del Mar and the bay islands were subdivided, mostly for vacation cottages, and most islands other than Bay Island are fill on dredged mudflats. Residents voted Newport Beach into existence on September 1, 1906, the fifth Orange County city. Postwar tracts and the 1950s freeway pushed homes toward the mesas, and Fashion Island opened up the inland side from 1967. The result is mixed. Census Bureau 2024 estimates show a median build year of 1979, about 53.3 percent of units from before 1980 and 8.1 percent from before 1950, with 47.9 percent of occupied units rented and 29.2 percent in buildings of five or more. Median owner value is top-coded, so read it as about $2 million or more. Age and ownership shape a kitchen remodel, a bathroom remodel or new flooring more than any price list does, because old finishes can carry lead paint and a condo carries association and sound rules.
The City issues its own permits. The Building Division Permit Center sits in the Civic Center, and reroof, window and door, and coastal flood recovery permits can be filed on its Civic portal. Newport Beach adopted the 2025 California codes with local amendments under Ordinance 2025-23. The official code host returned a Cloudflare block during our research, so code text here comes from the GoCodebook mirror and every section is worth confirming with the City. Four clocks matter. An application is treated as abandoned 180 days after filing, a permit lapses if work has not started within 180 days of issue, and a one or two unit dwelling project has three years from its first permit to finish. The fourth is the one few cities have: when a remodel's permit valuation reaches 50 percent of the building's market value, the whole building must meet new-construction code, though not below $350,000 and with relief for qualifying cottages. Weekday noise hours run 7:00 a.m. to 6:30 p.m., with Saturdays 8:00 to 6:00 only outside designated high density areas.
Water comes next. Inside the Coastal Zone, development needs a coastal development permit unless it is exempt, and work on an existing single-unit house is generally exempt except near a beach, wetland, bluff edge or between the sea and the first public road. Where the coastal zone and appeal boundaries run for your street, and what the setback and floor-area limits are, we could not verify, so Planning decides that. Flood rules add a second test: substantial improvement over a ten year span reaches 50 percent of structure value, and a new structure needs a slab top of 9.00 feet NAVD 88. The City reports a record high tide of 8.4 feet in October 2026 and king tides due November 23 to 27 and December 22 to 26, and as of its November 4, 2026 notice it offers a same-day online permit for flood repairs to finishes. Those items are time sensitive, so check the City's page before relying on them. Water also touches the concrete around seawalls and slabs, the fence along a bayfront setback, the deck on a cottage and any room addition near the shoreline. For an ADU, the City's plain-text page lists 850 square feet for a studio or one bedroom, 1,000 for two bedrooms and 500 for a junior unit, but its matrix tables were garbled, and its coastal-garage replacement parking line conflicts with state law.
Fire and weather finish the picture. The State Fire Marshal's March 24, 2025 recommended map lists 4,635 acres of Newport Beach as Very High, yet we could not confirm that the City adopted it, so we name no neighborhood by fire zone; ask the City whether your parcel is covered by Chapter 7A, which brings Class A roofing, ember-resistant vents and tempered multi-pane glass. The roof rule itself is unsettled: the City's code says Class C, its table says Class B and its January 2026 reroof sheet says Class B or greater, a conflict to confirm. The same caution applies to a historic house's exterior, since we found no verified rule for painting or replacement windows on one. NOAA's Harbor station records 9.43 inches of rain a year, mostly December through March, while John Wayne Airport, 3.7 miles inland, logs 12.8 days at 90 degrees or more. MDG Builders is the general contractor of record, CSLB #1040337: we write the scope, handle plan check, schedule licensed specialty subcontractors and walk the result with you. Our subcontractor article explains the arrangement, and nearby hubs include Costa Mesa, Irvine, Huntington Beach and Santa Ana.

- Newport Beach was incorporated on September 1, 1906, as Orange County's fifth city.
- About 53.3 percent of its housing units predate 1980, by Census 2024 estimates.
- A permit expires if work has not started within 180 days of issue.
- New flood-zone buildings need a slab top of at least 9.00 feet NAVD 88.
- The State Fire Marshal's 2025 draft map lists 4,635 acres as Very High.
- Owner-occupied home value is top-coded, so about $2 million or more.
Cities near Newport Beach we also build in
Newport Beach general contractor questions, answered
Do I need a licensed contractor for a remodel in Newport Beach?
Almost always, yes. California lets someone without a license take work totaling no more than $1,000 for labor and materials, and that allowance ends when the job needs any permit or involves hiring a worker. A permitted Newport Beach remodel, reroof, fence or window project therefore calls for a licensed contractor.
Where do I get a building permit in Newport Beach?
At the Building Division Permit Center in the Civic Center, run by Community Development. Reroof, window and door, and coastal flood recovery permits can be filed on the City's Civic portal. The permit counter number is (949) 718-1888. We left fee schedules out because we could not confirm them.
Does my Newport Beach project need a coastal development permit?
It depends on the lot. Work on an existing single-unit house is generally exempt, but not near a beach, wetland or bluff edge, and not between the sea and the first public road when it adds 10 percent or more floor area or a story. We could not verify the boundaries, so ask Planning.
What is Newport Beach's 50 percent remodel rule?
It is a city amendment requiring the entire building to meet new-construction code when a remodel's permit valuation equals or exceeds 50 percent of the building's market value. It does not apply below $350,000, and qualifying cottages get relief. Flood areas have a separate ten year, 50 percent test. Confirm your valuation with the Building Division.
How long can a Newport Beach building project take before the permit expires?
A permit becomes invalid if work has not started within 180 days of issue or stops for 180 days after the last inspection, and extensions need a written request 15 days before expiry. A one or two unit dwelling project also has three years from its first permit to finish, extendable only through the Building Official.
What roof fire class does a Newport Beach house need?
Confirm it with the Building Division before ordering materials, because the City's documents disagree. Its code text says Class C, its table says Class B and its January 2026 reroof sheet says Class B or greater. Parcels under Chapter 7A wildfire rules need Class A, and we could not confirm which parcels those are.
How big can an ADU be in Newport Beach?
The City's plain-text ADU page lists up to 850 square feet for a studio or one bedroom, 1,000 for two bedrooms and 500 for a junior ADU. Its matrix tables were garbled, so we trust only that page. Its coastal-garage replacement parking line conflicts with state law, so confirm it with Planning.
Can I get a quick permit to repair flood damage in Newport Beach?
For single-family homes damaged by flooding, the City's Coastal Flood Recovery program offered a same-day online express permit for finishes and nonstructural repairs, with no plans. That was as of November 4, 2026, and king tides are expected in late November and December, so check the City's page for current terms before you start.
Describe your Newport Beach project
Tell us the neighborhood, whether the lot touches the bay, a bluff or a canyon, and the work you want. We look up the coastal, flood and fire layers first, then call to explain which reviews your scope may meet.