General Contractor in Fountain Valley, CA
A general contractor in Fountain Valley builds on wet, soft ground in 1960s and 1970s tract houses, with the City's own permit counter, its own Fire Department and a Class B roof floor. Any residential addition can trigger a soils report. MDG Builders, CSLB #1040337, manages all eleven trades here.
Eleven trades, each read against Fountain Valley's own handouts and soil policy
Every trade guide checks one kind of job against the City pages, forms and Census counts that opened for us, and flags whatever stayed unreadable. Prices there are regional ranges from named sources. They are not Fountain Valley quotes, and no City fee amount is printed.

Kitchen Remodeling in Fountain Valley
A cabinet permit conflict between two City documents, the kitchen handout's hood and faucet rules, wall removal and a foundation policy for bump-outs.
See Fountain Valley kitchen remodeling →
Bathroom Remodeling in Fountain Valley
Fountain Valley's bathroom handout, 10-day plan review for wall changes, tract-era pipes and tile, shallow groundwater and construction site rules.
See Fountain Valley bathroom remodeling →
ADU Construction in Fountain Valley
Fountain Valley's ADU handout, the state's December 2024 letter on its ordinance, a 16 versus 18 foot height conflict and a foundation policy built for high groundwater.
See Fountain Valley ADU construction →
Room Additions in Fountain Valley
Fountain Valley's soils report rule, 60 percent lot coverage, the 70 percent second-story cap, a Floodplain overlay and the two-car garage requirement.
See Fountain Valley room additions →
Roofing in Fountain Valley
Class B roofing on every repair, expedited re-roof permits, weight tickets for the tear-off and no Very High fire zone in the City's own assessment.
See Fountain Valley roofing →
Windows in Fountain Valley
Fountain Valley's expedited window permit and worksheet, lead-safe rules for tract homes, egress and opening control devices, and tempered glass near doors and tubs.
See Fountain Valley window replacement →
Flooring in Fountain Valley
Slab moisture over shallow groundwater, asbestos checks in tract homes, the permit question, remodel floor rules and costs for flooring in Fountain Valley.
See Fountain Valley flooring →
Painting in Fountain Valley
No permit for paint, an EPA lead rule that reaches most homes here, stucco prep and the South Coast low-VOC limit for Fountain Valley houses.
See Fountain Valley painting →
Concrete in Fountain Valley
Groundwater under 10 feet, the City's slab policy and soils reports, paving permits, block walls, washout rules and pour costs in Fountain Valley.
See Fountain Valley concrete work →
Decks in Fountain Valley
The 30 inch permit line, footings in wet soil, City Standard patio covers, fire review, deck repair and wood versus composite cost in Fountain Valley.
See Fountain Valley deck building →
Fencing in Fountain Valley
A 3 foot front yard cap, 6 foot side and rear fences, a 3 foot block wall permit line and footings set in groundwater under 10 feet.
See Fountain Valley fencing →What do a drained swamp, tract-era plumbing and a soils report policy mean for a Fountain Valley remodel, roof or ADU?
Fountain Valley is a city that had to be drained before it could be built. The City's 2045 General Plan says the district was a swamp known as Gospel Swamps from the 1880s to the early 1900s, that settlers dug canals to drain it for crops, and that artesian wells gave the city its name. After World War II developers subdivided the croplands. Voters incorporated the city in 1957, by 91 of 160 ballots, and a master plan had to exist before any tract was allowed. The first tract broke ground in 1962, and the population reached nearly 32,000 by 1970 and just over 55,000 by 1980. The older settlement of Talbert grew near Talbert Avenue and Bushard Street, where the Pacific Electric line opened in 1909 according to Wikipedia, and Heritage Park keeps a historic Talbert real estate office west of the library. The Census Bureau's ACS 2024 5-year estimates, the release Census Reporter returned for a city this size, count 19,227 housing units. Of these, 42.5 percent went up in the 1970s and 34.9 percent in the 1960s, 82.3 percent predate 1980 and only 5.0 percent predate 1960. Detached houses are 67.8 percent of units, 35.2 percent of occupied homes are rented, 16.1 percent of units sit in buildings of five or more apartments and the median owner-occupied value is $1,072,300. In practice a typical job opens walls that are close to or past 50 years old. A kitchen remodel or bathroom remodel meets plumbing and wiring of that vintage. House painting and window replacement fall under EPA's lead-safe rule in most homes here, and since the table cannot separate 1978 from 1979 we say before 1980. Flooring installation on a slab from those decades deserves a moisture and old-adhesive question before demolition starts.
The ground matters more here than any map overlay. The City's May 2023 Vulnerability Assessment says groundwater sits less than ten feet below the surface, calls the whole city susceptible to liquefaction except an isolated area along Newland Street, and puts the highest potential beside the Santa Ana River and south of the I-405. The Zoning Code's Seismic Hazard overlay, section 21.14.050, lets the building official demand special design and a site-specific soils report case by case. Section 18.12.080 adds that the Building Official may require a geologic or geotechnical report for any new residential construction or addition after a site visit, and the City's foundation policy, effective January 1, 2023, asks for a geotechnical report on residential projects unless a listed exception applies. One exception is an alternate slab method for a one story addition or detached structure up to 1,200 square feet outside a liquefaction area, or up to 500 square feet inside one. So treat a room addition, an ADU, a new concrete slab or driveway and the footings of a deck as soil questions before design questions. Surface water is the second question. The same assessment says most of the city is FEMA Flood Zone X, protected by levee from 100-year risk, while the northwest is Zone A, with flooding most likely near Sandalwood Street, Walnut Street and Heil Avenue. The Floodplain overlay counts repairs or improvements within five years that cost 50 percent or more of a structure's market value as a substantial improvement, and the City's flood brochure, revised in 2013, says any addition or remodel needs a building permit because parts of the city lie in a floodplain. The FEMA map panels and the General Plan's liquefaction figure are images we could not read, so no parcel is named here. Ask the Building Division what applies to yours.
Fire, roof and fence rules are milder, with a few sharp edges. Fountain Valley has its own Fire Department, and OCFA's member-city page does not list the city, so fire review comes from City staff. The 2023 assessment says no Very High Fire Hazard Severity Zone exists in the city or beside it, that the city is not in a wildland-urban interface and that the nearest High and Very High zones are in the San Joaquin Hills and Loma Ridge. That document predates CAL FIRE's 2025 update and we did not open the 2025 map, so we do not claim the city is clear of every tier. The City's own amendment, section 18.12.110, sets Class B as the minimum covering whenever an existing roof is altered, repaired or replaced, which reaches every roof repair. A fence is capped at 3 feet in the required front yard and 6 feet on the sides and rear, with 8 feet allowed beside an arterial road, and a fence over 6 feet or a block wall over 3 feet needs a permit. Two City documents disagree, and we say so. The exempt list names cabinets as finish work, yet the 2019 kitchen handout asks for a permit when cabinets are replaced or moved, so phone the counter before treating a swap as permit free. The ADU handout gives a height of 18 feet on its summary page and 16 feet for a detached new unit on its detail pages, and HCD wrote to the City on December 6, 2024 that Ordinance 1603 did not comply with state ADU law. We found no record of what changed afterward and could not open Zoning Code 21.08.040 or 21.08.055, so ask Planning at 714-593-4425 for the standards in force today.
Permits come from the City itself. The Building Division sits inside Community Development, and its Building Division page lists a counter at 10200 Slater Avenue that opens Monday to Thursday from 7 a.m. to 6 p.m. and stays closed on Friday, with a phone line at 714-593-4429. Applications and PDF plans go through the online Permit Center, which needs a portal account, and the City offers expedited types such as window and door replacement and residential re-roof. The 2022 California codes apply with local amendments under Ordinance 1593, but the City says its handouts are under review and several still cite the 2013 or 2016 codes, so each handout is a question for the counter. Starting before the permit costs double the permit fee, and a renovation worth 75 percent or more of a building, counting two years of permits, can pull the whole building up to current code. Before a permit issues the owner signs a Construction Site Best Management Practices Agreement, which allows work from 7 a.m. to 8 p.m. on weekdays and 9 a.m. to 8 p.m. on Saturday, never on Sunday or holidays, and the counter may also ask for a waste management plan, saved weight tickets and a Construction Bin from Republic Services. The official Municipal Code host, ecode360 and Qcode, blocked our tools, so every code section quoted here comes from the third-party GoCodebook mirror, which says it is not official. Confirm the wording with the City. MDG Builders holds general contractor license CSLB #1040337. We write the scope, assemble the plans and permit packet and keep the calendar moving, while licensed specialty subcontractors do the field work, and you can ask each of them for a license number and certificate of insurance before they start. Our guides on how general contractors use subcontractors and checking a contractor license explain the model. Neighbors with guides of their own are Huntington Beach, Garden Grove, Westminster, Costa Mesa and Santa Ana.

- Fountain Valley incorporated in 1957, and the Census counts 77.3 percent of its homes as built in the 1960s and 1970s.
- The City says groundwater is under ten feet and that every part of town except an isolated Newland Street area is susceptible to liquefaction.
- The Building Official can require a geotechnical report on any residential addition, and a City foundation policy asks for one on residential projects unless an exception applies.
- A Floodplain overlay treats improvements costing 50 percent of a structure's value within five years as a substantial improvement.
- A roof repair needs Class B or better, fences stop at 3 feet in the front yard and 6 feet beside and behind the house, and the City runs its own Fire Department instead of OCFA.
- We could not open the official Municipal Code, the FEMA and liquefaction maps or CAL FIRE's 2025 map, so those items stay unconfirmed.
Cities near Fountain Valley we also build in
Fountain Valley permit, soil and contractor questions, answered
Where do I get a building permit in Fountain Valley?
The City issues its own permits through the Building Division of Community Development, with applications filed in the online Permit Center at fountainvalley.cts.city. The counter at 10200 Slater Avenue is open Monday to Thursday from 7 a.m. to 6 p.m. and closed Friday. Call 714-593-4429 to learn what your job requires before you file.
Is Fountain Valley in a wildfire zone?
The City's 2023 Vulnerability Assessment reports no Very High Fire Hazard Severity Zone and no wildland-urban interface in or beside the city. We did not open CAL FIRE's 2025 map, so we cannot confirm the city is clear of every tier. Ask the Building Division about your parcel, and note that the City has its own Fire Department, not OCFA.
Do I need a soils report for a room addition in Fountain Valley?
Possibly, because the Building Official may require a geologic or geotechnical report for any residential addition. The City's foundation policy also asks for a geotechnical report on residential projects unless a listed exception applies, such as an alternate slab method for small one story work. Ask the counter which route fits your lot before paying for drawings.
Is my Fountain Valley home in a flood zone?
Most likely it is in Zone X, though the northwestern part of the city is Zone A, a 1 percent annual chance area. The City's assessment names the Sandalwood Street, Walnut Street and Heil Avenue area as most prone. We could not read the FEMA map images, so check your parcel with the Building Division, along with the Floodplain overlay.
Can I replace kitchen cabinets in Fountain Valley without a permit?
Do not assume so, because two City documents conflict. The exempt list names cabinets and counter tops as finish work, while the 2019 kitchen handout requires a permit when cabinets are replaced or relocated and exempts only countertop replacement or refacing. Call the Building Division at 714-593-4429 before you start.
How tall can a fence be in Fountain Valley?
Three feet in the required front yard and six feet in side and rear yards, according to the City's single family standards sheet and Zoning Code 21.18.070 on the GoCodebook mirror. Eight feet can apply beside an arterial road. A fence over six feet or a block wall over three feet needs a building permit.
How tall can an ADU be in Fountain Valley?
The City's own handout gives two answers: 18 feet on its summary page and 16 feet for a detached new unit on its detail pages. HCD's December 2024 letter also faulted the City's ADU ordinance, and we could not learn what changed afterward. Ask Planning at 714-593-4425 for the current height limit.
Are the prices on your Fountain Valley pages quotes from MDG Builders?
No, they are regional ranges drawn from named published sources, and we print no City fee amounts. A real price comes from a written proposal after MDG Builders sees the property and confirms what the City requires. MDG holds CSLB #1040337 and hires licensed specialty subcontractors for the field work.
Tell MDG Builders about your Fountain Valley project
Share the cross streets or area, the work you are weighing and roughly when the house was built. We begin with the soil, flood and permit questions for your lot, then walk you through what the Fountain Valley counter is likely to ask for.