General Contractor in Westminster, CA
A general contractor in Westminster works inside a flat, older tract city where the City's own code sets Class B roofing on every roof repair, caps front-yard paving and fence heights, and limits how far a nonconforming house can grow. MDG Builders, CSLB #1040337, manages all eleven trades here and confirms each rule with the Building Division.
Eleven Westminster trade guides, each tied to the City's own code text
Choose the job you are planning. Every guide marks what the code text says and what we could not confirm, and its prices are regional ranges, not Westminster quotes or permit fees.

Kitchen Remodeling in Westminster
One kitchen per house, no second-floor kitchen or wet bar, a permit path to confirm, aluminum wiring checks and 1960s and 1970s houses.
See Westminster kitchen remodeling →
Bathroom Remodeling in Westminster
Westminster's tile exemption, slab plumbing rules, 1960s and 1970s bathrooms, rentals and the permit that restarts when a contractor changes.
See Westminster bathroom remodeling →
ADU Construction in Westminster
Westminster's 60-day and 30-day ADU clocks, 4 foot setbacks, garage conversions, SB 9 units, impact fees and HCD's 2023 letter.
See Westminster ADU construction →
Room Additions in Westminster
Westminster's 20 percent cap on nonconforming houses, R1 setbacks, 20 by 20 foot garage rule, sprinkler triggers and no upstairs kitchen.
See Westminster room additions →
Roofing in Westminster
Class B on every repair and partial re-roof, a re-roof permit to confirm, a fire zone status to check and 1960s and 1970s tract roofs.
See Westminster roofing →
Windows in Westminster
Lead-safe rules for 1960s and 1970s homes, a permit question the City's list leaves open, glass labels, fire review and install day.
See Westminster window replacement →
Flooring in Westminster
Termite and subfloor checks, slab moisture and buried pipes, asbestos in pre-1980 homes, the permit exemption, rentals, garages and costs for flooring in Westminster.
See Westminster flooring →
Painting in Westminster
A painting permit rule from the City's own list, lead-safe work for older tract homes, stucco prep and color matching on ADUs and additions.
See Westminster painting →
Concrete in Westminster
Driveway and walkway caps by lot width, front yard hardscape limits, the permit exemptions, retaining walls, footings, heat and rain and pour costs in Westminster.
See Westminster concrete work →
Decks in Westminster
The 15 foot platform setback, the 30 inch permit line, patio covers, termites in old frames, ledgers and footings, guards, pools, fire pits and deck costs in Westminster.
See Westminster deck building →
Fencing in Westminster
A 4 foot masonry permit line that skips wood, a 3 foot front cap, a freeway height line to question and banned chain link and corrugated metal up front.
See Westminster fencing →Which Westminster rules change a re-roof, a fence, a patio or an ADU on a 1960s lot?
Westminster began as a church project. Rev. Lemuel Webber founded it in 1870 as a Presbyterian temperance colony, and for decades the land grew dairy feed, walnuts, strawberries, celery and lima beans, later sugar beets, and even goldfish. Growth stalled through the Depression, the 1933 earthquake and a bad flood in 1938. The city incorporated in 1957 with 10,755 residents under the name Tri City, a plan to join Westminster, Barber City and Midway City. Midway City stayed out, Barber City came in, and voters restored the Westminster name five months later. Housing followed the late boom. Census Bureau estimates for 2024 put 29.6 percent of homes in the 1960s and 24.5 percent in the 1970s, about 74.5 percent before 1980 and exactly half before 1970. Those counts carry wide margins of error, so read them as a pattern, not a precise tally. The pattern is plain enough: your house is probably 50 to 65 years old, on a small lot, and 45.8 percent of occupied homes are rented. That age points toward lead-safe repainting and window replacement, old plumbing and wiring behind a kitchen remodel or bathroom remodel, and original flooring over adhesives nobody has tested.
What sets Westminster apart is the City's own code, read from the GoCodebook mirror because the City site and every official code host answered our tools with a 403 error. Confirm each point with the City before you sign anything. The local roof amendment calls for at least Class B covering on any repair, alteration or partial replacement, so even a patch needs a rated material, and our roofing page explains why. Whether a straight tear-off and replacement needs a permit is unconfirmed, and so is fire zone status for any Westminster parcel, so look up yours on CAL FIRE's viewer. A fence tops out at 3 feet inside the front setback and 6 feet along R1 side and rear lines. The permit exemption list mentions a 4 foot height for masonry walls or fences, yet its wording leaves open whether wood is included. Driveways and walkways may cover only 50 to 75 percent of a front yard, depending on lot width, which governs any concrete job. An attached patio cover must stay 10 feet from the rear lot line and 5 feet from a side line, and big detached structures face their own caps, which frames deck and patio plans.
Growing the house has its own limits. A legal nonconforming single-family home can expand only 20 percent cumulatively, so a room addition must meet today's setbacks even if the old house does not. A house gets one kitchen unless an ADU adds a second, and the code bars a kitchen or wet bar upstairs. The ADU section on the mirror, 17.400.135, approves projects ministerially in 60 days, or 30 on a pre-approved plan, and it sets 1,200 square feet for a detached unit. We did not read its subsection N, and the State HCD wrote the City in March 2023 about an earlier ordinance, so confirm which version governs before you design an ADU. Repainting an old house is a lead question first, and our painting guide covers the EPA rule.
Permits run through the City's Building Division, and we state no City hours, phone numbers or fees, because we could not read them. The mirror shows the 2025 California codes adopted by Ordinances 2626 and 2629, a Zoning Clearance step ahead of building plan check, and Orange County Fire Authority as the fire reviewer. One rule surprises owners: a permit expires on a change of contractor if the work is unfinished, and a new one is needed to complete it. MDG Builders is a licensed general contractor, CSLB #1040337. Our role is to write the scope, shepherd the plans and permits and sequence the crews. Licensed specialty subcontractors build the work, and any of them will owe you a license number and a certificate of insurance on request. Our posts on how general contractors use subcontractors and checking a contractor license cover the details. Neighbors with their own pages are Garden Grove, Huntington Beach and Santa Ana. Fountain Valley, Seal Beach and Stanton have no page yet, so call us about work there.

- Westminster incorporated in 1957 as Tri City and took back its original name by a vote five months later.
- The Census estimates put about 74.5 percent of Westminster homes before 1980, with wide margins of error on every count.
- The City's roof amendment requires at least Class B covering on any repair, alteration or partial replacement.
- Front-yard driveways and walkways are capped at 50 to 75 percent of the yard, depending on lot width.
- A nonconforming single-family house can be enlarged by only 20 percent, counted cumulatively.
- Our code readings come from the GoCodebook mirror, since the City site and code hosts returned 403 errors.
Cities near Westminster we also build in
Westminster permit, code and contractor questions, answered
Who issues building permits in Westminster?
Westminster issues and inspects its own permits through the Community Development Department's Building Division, and Orange County Fire Authority handles fire review. We could not read the City site, so we print no hours, phone numbers or fees. Check them with the City before you plan a visit or a budget.
Which building codes does Westminster use?
The 2025 California codes. The code mirror shows the Building and Residential Codes adopted by Ordinance 2629 on November 12, 2025, and the Energy Code, with no local amendments, by Ordinance 2626. Westminster adds local rules for roofs, sprinklers, pool enclosures and grading. Confirm the current text with the City, because the mirror is not the official host.
Does a small roof repair in Westminster have to use Class B roofing?
Yes, according to the City's amendment as we read it. It requires at least Class B covering on any alteration, repair or replacement of an existing roof, so a small patch is covered too. Whether a straight replacement needs its own permit is unconfirmed, so put that question to the Building Division.
How tall can a fence or wall be in Westminster?
Three feet inside the front setback and 6 feet along R1 side and rear lines, going by the City's fence table. The permit exemption list mentions a 4 foot height for masonry walls or fences, yet it leaves open whether wood qualifies. Ask the Planning Division before ordering materials.
Is Westminster in a fire hazard severity zone?
We could not confirm that any Westminster parcel is in a CAL FIRE zone. The 2011 local-responsibility layer showed none near the city, but we did not read the 2025 maps. Check your parcel on CAL FIRE's viewer, because a mapped parcel follows different state roof rules than the City's own Class B amendment.
How big can an ADU be in Westminster?
The code mirror gives 1,200 square feet for a detached ADU, with at least 850 square feet allowed for a studio or one bedroom, and 60-day ministerial review. We did not read subsection N, and the State HCD questioned an earlier version in 2023, so confirm the governing text with Planning before you design.
Does an older Westminster house change how the work is done?
Yes. Census estimates put about 74.5 percent of homes before 1980, with a wide margin of error. For housing built before 1978, EPA's lead-safe rule requires a certified firm and safe work practices whenever paint is disturbed, and window replacement is always covered. Old piping and wiring also surface during kitchen and bath remodels.
Are the prices on the Westminster trade pages quotes from MDG Builders?
No. They are regional ranges from named sources, not Westminster quotes, and they leave out permit fees because we could not read the City's schedule. Only MDG Builders' written proposal carries a real price, and it follows a site visit and a check of the rules on your block.
Tell MDG Builders about your Westminster project
Give us the cross streets, the work you want done and roughly when the house was built. We start with the roof, front-yard and setback questions, check what the City says on each, and explain what the Building Division is likely to review before you commit.