Tarzana, CA · Serving Southern CaliforniaCSLB #1040337 · (888) 666-8224
Stanton, CA

General Contractor Stanton, California: Rentals, Mobile Parks and Older Homes

Quick answer

A general contractor in Stanton, California works in a flat 3.1 square mile Orange County city where about 65 percent of homes predate 1980 and half the occupied units are rented. The City's Building Division issues permits, and local rules include Class B roofs and a 75 percent reconstruction rule. MDG Builders (CSLB #1040337) coordinates all eleven trades.

Services

Eleven trades, each checked against Stanton's code and housing

Each guide sets one trade beside the Stanton rules we could open and says what we could not. Prices are sourced regional ranges, never Stanton quotes, and no permit fee appears because we found no fee schedule.

Close detail of custom kitchen cabinetry: inset shaker doors, soft-close drawers, brass pulls, kitchen remodeling by a general contractor near Stanton in Westminster

Kitchen Remodeling in Stanton

A 75 percent reconstruction rule, Building Division plan check, 1950s and 1970s homes, rental owners and the 2025 codes the City adopted in 2025.

See Stanton kitchen remodeling →
A compact updated rental apartment bathroom with a white tub-shower combination, white subway tile, bathroom remodeling by a general contractor in Hollenbeck Park, Stanton

Bathroom Remodeling in Stanton

Stanton's 75 percent reconstruction rule, homes mostly built before 1980, lead-safe work, renter-owned buildings and Monday to Thursday permit counters.

See Stanton bathroom remodeling →
Interior of a finished ADU studio: kitchenette with white cabinets, sleeping area, adu construction by a general contractor near Stanton in Garden Grove

ADU Construction in Stanton

Stanton's Class 1 and Class 2 ADUs, size and height limits, garage conversions, sewer and deed rules, soils and the 60 day approval clock.

See Stanton ADU construction →
Survey stakes and string lines marking the footprint of a future room addition on a side yard beside, room additions by a general contractor in Stanton Civic Center, Stanton

Room Additions in Stanton

Stanton's 75 percent reconstruction rule, RL setbacks and coverage, parking that rises with bedrooms, Class B roofs and liquefaction-zone foundations.

See Stanton room additions →
Plywood roof decking covered with synthetic underlayment and drip edge, roofing by a general contractor near Stanton in Cypress

Roofing in Stanton

Class B as the minimum for every re-roof, no mapped wildfire zone, OCFA fire service, tight setbacks and a housing stock that is 65 percent pre-1980.

See Stanton roofing →
Living room with new large white vinyl windows and a sliding glass door, bright natural light, windows by a general contractor in Harry M. Dotson Park, Stanton

Windows in Stanton

Stanton's permit questions for windows, lead-safe rules for homes built before 1978, frame standards, glass labels and renter-heavy buildings.

See Stanton window replacement →
A neat stack of unlabeled wood and vinyl floor plank samples in different tones leaning against a wa, flooring by a general contractor near Stanton in La Palma

Flooring in Stanton

The 75 percent reconstruction rule, permit questions, asbestos and lead in older homes, slab moisture, rentals, mobile homes and costs for flooring in Stanton.

See Stanton flooring →
Kitchen cabinets freshly painted a deep forest green with brass hardware, white quartz counter, painting by a general contractor in Premier Park, Stanton

Painting in Stanton

A planning exemption for same-material repaints, peeling stucco and deferred maintenance, the EPA lead rule for older homes and South Coast low-VOC limits.

See Stanton painting →
A new light gray broom-finish concrete front walk with clean saw-cut joints leading to a historic Ca, concrete by a general contractor near Stanton in Los Alamitos

Concrete in Stanton

Paving caps, patio setbacks by height, liquefaction soil, grading rules, retaining walls, the fence permit conflict and pour costs in Stanton.

See Stanton concrete work →
Close-up of composite decking boards with hidden fasteners and a clean picture-frame border, decks by a general contractor in Stanton Plaza, Stanton

Decks in Stanton

Permit questions, setbacks by deck height, patio covers, fire pits, pool barriers, liquefaction soil, deck repair and wood or composite costs in Stanton.

See Stanton deck building →
Close-up of black gate hinges and a latch on a wooden fence gate, fencing by a general contractor near Stanton in Buena Park

Fencing in Stanton

Planning review and a Building Permit for every fence, 42 inch solid front fences, block wall limits and pool barriers on small Stanton lots.

See Stanton fencing →
Stanton, Orange County

What should a Stanton homeowner or landlord know before signing with a general contractor?

Stanton has restarted more than once. The land belonged to Rancho Los Alamitos and Rancho Los Coyotes, the Pacific Electric Railway ran through by 1906, and the community was called Benedict until 1911. That May a 16 square mile area incorporated as Stanton, named for assemblyman Philip Stanton, largely to block Anaheim's proposed sewage farm. Voters undid the city on July 22, 1924, which let the State build roads, and a May 15, 1956 election led to today's city, incorporated June 4, 1956 on 3.1 square miles. In the ACS 2024 five year estimates, Stanton has 13,269 housing units; 65.2 percent date from before 1980, 61.2 percent from 1950 through 1979, and only 12.6 percent from 2000 on. Just over half of occupied units (51.9 percent) are rented, about 31 percent of all units are in apartment buildings of five or more, and 14.2 percent are mobile homes spread over nine parks with 1,301 permitted spaces. The median owner value is $579,300. The City's Housing Element says the Building Official flagged the Santa Barbara neighborhood, Tina/Pacific, the northwest corner of Katella Avenue and Beach Boulevard, and Little Mansions and Clover Park as places with housing in need of substantial rehabilitation. A kitchen remodel or bathroom remodel here often begins with the age of the building and who owns it, long before cabinets or tile.

Permits here come from the City itself, which puts Stanton under Orange County habits and leaves Los Angeles County rules out of the picture. The Building Division belongs to the Community & Economic Development Department at City Hall, 7800 Katella Avenue, and accepts plans as PDFs through its Plan Check Center portal. Counters, phones and email run Monday through Thursday, with a lunch closure from noon to 1 p.m., and City Hall is shut on Fridays. Inspections run Monday through Thursday, need 48 hours notice and are booked at (714) 890-4252. Permit questions go to the Building Permit Technician at (714) 890-4286, and the Planning Division answers zoning questions at (714) 890-4232. Now the limits of our reading. The City's official code host, ecode360, answered our tools with a Cloudflare 403, which means all the code wording on these pages was copied from the GoCodebook mirror, an outside site, and each point should be confirmed with the City. We found no fee schedule, the Building Division page said online payments were paused when we read it, and we could not verify whether a contractor based outside Stanton needs a City business license. The Orange County Fire Authority is the fire agency.

Four rules shape most jobs. Class B is the floor for fire rating on a Stanton roof, whether the work is a repair, an alteration or a full replacement, and that sets the terms for every roof repair or replacement estimate. The 75 percent reconstruction rule says that renovation worth 75 percent or more of a home's habitable square footage, counting permits from the previous two years, pulls the entire building up to new-construction code, so a room addition plus a remodel can add up fast. Every new, replaced or repaired fence needs Planning review and a Building Permit under the zoning code, while the amended building code exempts fences up to 6 feet, and the City's own sources conflict, so a fence company should settle it at the counter first. Stanton's own amended exemption list is short, with just four entries: sheds, fences and block walls, retaining walls, and small prefabricated pools. For bathroom, window, painting, flooring, small-deck and re-roof jobs, the permit answer has to come from the Building Division, because we will not guess. Ground and sky matter as well. The Housing Element puts the whole city in a liquefaction hazard zone and in FEMA Flood Zone X, which touches concrete work and foundations. CAL FIRE's 2007 and 2011 state layers map no fire zone inside Stanton, though we did not check the 2025 update. The nearest NOAA 1991 to 2020 station, Fullerton Municipal Airport, records 11.86 inches of yearly rain and 39.2 days of 90 F or hotter, so sun wears on house painting, window replacement and decks. For a backyard unit, ADU construction runs under zoning section 20.400.330, and old slabs and vinyl are the starting point for flooring installation.

Under CSLB #1040337, MDG Builders is the general contractor on a Stanton job: we write the scope, prepare the drawings and documents the Plan Check Center lists, line up the licensed specialty trades and review the finished work alongside you. Any of them should be able to hand over a license number and proof of coverage when you ask. Before you commit to anyone, read what subcontractors actually do on a remodel and the license lookup steps. If your project sits near the edge of town, guides exist for Westminster, 3.0 miles south in a straight line, Garden Grove, 3.2 miles southeast, Cypress, 3.2 miles northwest, Buena Park, 4.9 miles north, Anaheim, 5.3 miles northeast and Fountain Valley, 6.9 miles south. La Palma and Los Alamitos have no guide yet, so call us about those.

Living room with new large white vinyl windows and a sliding glass door, bright natural light, windows by a general contractor in Stanton Central Park, Stanton
  • Stanton incorporated on June 4, 1956 on 3.1 square miles, after an earlier city created in 1911 was dissolved by voters in 1924.
  • ACS 2024 five year estimates count 13,269 housing units, 65.2 percent built before 1980, and 51.9 percent of occupied units are rented.
  • Any roof work, from a repair to a full replacement, must use at least a Class B fire-rated covering.
  • Permitted renovation that reaches 75 percent of habitable square footage over two years triggers new-construction code for the whole building.
  • Liquefaction hazard covers the whole city, FEMA Zone X applies, and CAL FIRE's 2007 and 2011 layers map no fire zone here.
  • Our tools met a Cloudflare 403 on ecode360, the City's official code host, so we quote code from the third-party GoCodebook mirror.
Nearby

Cities near Stanton we also build in

FAQ

Stanton permit, code and contractor questions, answered

Who issues building permits in Stanton, California?

The City of Stanton's Building Division, inside the Community & Economic Development Department at City Hall, issues them, and Los Angeles County plays no role. Plans go in as PDFs through the Plan Check Center, and permit questions go to (714) 890-4286. Counters run Monday through Thursday only, so plan around the closed Fridays.

Which building codes apply to a Stanton project?

The 2025 California codes apply, adopted by Ordinance 1164 on September 23, 2025, with local amendments in Chapters 16.04, 16.05 and 16.21 of the Municipal Code. The plumbing, existing building and green building chapters list none. Because ecode360 blocked our tools, we read a third-party GoCodebook mirror, so confirm with the City.

What is Stanton's 75 percent reconstruction rule?

It is a local amendment, CBC section 105.8 and CRC section R105.10: when reconstruction or renovation value reaches 75 percent of the building's habitable square footage, the entire building must meet new-construction code. Permits issued in the previous two years count toward the total. Ask the Building Division how it applies to your plans.

Does a fence in Stanton need a permit?

Yes, the zoning code says so: any new, replaced or repaired fence or wall needs Planning review plus a Building Permit. The amended building code separately exempts fences up to 6 feet, so the City's own sources disagree. Call the Building Division at (714) 890-4286 before assuming any fence or block wall is exempt.

What roof rating does a Stanton re-roof have to meet?

At least Class B fire-retardant. That minimum covers a repair, an alteration and a full replacement alike, so a patch and a tear-off both start there, and Class A assemblies such as tile also pass. The text comes from a code mirror, so confirm it before ordering materials.

Which Stanton home projects are exempt from a permit?

The amended exemption list has four entries: sheds, fences and block walls, retaining walls, and small prefabricated pools, and the fence entry conflicts with zoning. For bathroom, window, painting, flooring, small-deck and re-roof work we could not confirm a rule, so ask first at (714) 890-4286.

Is Stanton in a fire, flood or liquefaction zone?

Liquefaction yes, mapped fire zone no. Per the Housing Element, all of Stanton lies in a liquefaction hazard zone and in FEMA Flood Zone X. CAL FIRE's 2007 and 2011 layers show no fire zone here, but we did not check the 2025 update, so ask the Building Division about one parcel.

What do permits and prices look like for a Stanton project?

No permit fee appears here, because we found no fee schedule and the City sets amounts by council resolution. Trade page prices are sourced regional ranges, and a written MDG Builders proposal gives your real number. Whether an out of city contractor needs a Stanton business license is unverified, so check with the City.

Free estimate

Describe your Stanton house, rental or mobile home project

Include the nearest cross streets, roughly when the building was built, whether it is owner occupied or a rental, and the job you have in mind. We will line up the City permit question, any landlord, park owner or HOA approval you may need, and the trades involved.

Free estimate · A real person answers · (888) 666-8224

Call (888) 666-8224