Tarzana, CA · Serving Southern CaliforniaCSLB #1040337 · (888) 666-8224
Fencing in San Jacinto

Fence Companyin San Jacinto, CA

Quick answer

A fence company in San Jacinto builds to 4 feet in front yards and 6 feet elsewhere, and the City's building code exempts fences up to 6 feet that follow the zoning rules. Wood is barred where a fence is visible from the street, and block walls are designed for 100 mph wind, while the handout still prints 85.

CSLB #1040337 5.0 on Houzz Free written estimate
Horizontal slat redwood fence with a matching gate along a modern backyard with gravel and grasses, fencing in Estudillo Mansion, San Jacinto
CSLB #1040337Verified at CSLB
5.0 on HouzzRated by clients
Written proposalsScope and price in writing
Licensed specialistsSubcontractors do the work

San Jacinto fences mostly mark lots from the 2000s boom and from the older valley grid. Census Bureau ACS 2020 to 2024 five-year estimates count 15,420 housing units, 11,597 of them single-family detached homes at 75.2 percent, with 5,847 built in the 2000s and 3,634 before 1980, and the General Plan says the town was founded in 1870 and incorporated on April 9, 1888. The Development Code writes the tract era into its wall rules: residential subdivisions must provide solid decorative masonry walls along the tract perimeter, street side yards and corner-lot returns.

For fence installation, MDG Builders (CSLB #1040337) measures the lot, checks the height table and permit steps with the City and coordinates the crews, while a licensed C-13 subcontractor builds wood, vinyl and metal fences and a masonry subcontractor builds block. The fencing page holds our sourced prices, the San Jacinto overview covers our other trades here, and the fence guides for Hemet and Moreno Valley show how two neighbors set their limits. The City's Building & Safety Division issues permits. Because the Municipal Code host blocked our requests, code text here comes from GoCodebook's third-party mirror, dated October 4, 2026, and each section needs confirming with the City.

Fencing rules in San Jacinto

What San Jacinto's Development Code, building code amendments and wall handouts say about fences

  • Heights (Development Code 17.315.020, Table 3-4, Ord. 24-13): in front yard setback areas fences and walls may be 4 feet, open or solid (the RE and RR zones may add 2 feet of open fencing on top for 6 feet overall); interior side, street side and rear yards allow 6 feet (8 feet in industrial zones); a fence in a required street side setback may not come closer than 20 feet to the front lot line; and side yard return fences must be set back at least 5 feet from the front of the structure (read in GoCodebook's verbatim copy of the San Jacinto Municipal Code, a third-party mirror with text as of 2026-10-04, because the City's Code Publishing site returned a Cloudflare block page, HTTP 403, to plain curl). The City's posted December 2022 Development Code PDF carries the same heights.
  • Measuring height (17.315.040): height is measured from the highest finished grade abutting the fence, and grade may not be raised to allow a taller fence; on sloping ground or on a retaining wall a solid fence of 6 feet may be allowed measured from the up-slope property as long as the total, including the retaining wall, does not exceed 10 feet measured from the down-slope property (read in GoCodebook's verbatim copy of the San Jacinto Municipal Code, a third-party mirror with text as of 2026-10-04, because the City's Code Publishing site returned a Cloudflare block page, HTTP 403, to plain curl).
  • Permit: the City's amended CBC 105.2 exempts fences and walls on single-family lots up to 6 feet measured from adjacent grade if they comply with Title 17, but retaining walls over 18 inches, and any fence on a retaining wall over 18 inches, need a building permit (Municipal Code 15.04.020 B); the City's block wall standard handout adds 'check with the Building Department to verify if a building permit is required' and lists footing, rebar/pre-grout and final inspections when one is required (read in GoCodebook's verbatim copy of the San Jacinto Municipal Code, a third-party mirror with text as of 2026-10-04, because the City's Code Publishing site returned a Cloudflare block page, HTTP 403, to plain curl).
  • Block wall wind speed conflict: Municipal Code 15.04.020 F (Ord. 25-08) adds CBC 1616.3.3, which requires block walls to be designed for a basic wind speed of 100 miles per hour 'due to documented local wind conditions and historic regional wind events', while the City's undated free-standing block wall handout still prints design parameters of 85 mph, Exposure C, Seismic Design Category E, Site Class D, 1,500 psf allowable soil bearing and 2,500 psi foundation concrete under the Western Riverside County Code Uniformity Program. Use the 100 mph code text and have the Division confirm which standard sheet it accepts (read in GoCodebook's verbatim copy of the San Jacinto Municipal Code, a third-party mirror with text as of 2026-10-04, because the City's Code Publishing site returned a Cloudflare block page, HTTP 403, to plain curl).
  • Wall handout: the City's retaining wall standard handout notes its design is not for surcharge loads from vehicles or other structures, requires drainage (gravel and perforated pipe or open head joints in the first course) and says fence heights are regulated by zoning; the free-standing wall version does not allow grade differences over 6 inches on opposing sides and is not a retaining wall.
  • Materials in residential zones (17.315.070): fences visible from the street on the street side and side yard returns must be solid decorative material (brick, concrete, masonry, stucco) or, for side returns, vinyl or wrought iron, with wood prohibited except as a decorative element with wrought iron; front yard fences must be block, wrought iron, block and iron combinations, picket or split rail kept in 'new' condition, and walls need decorative capping; fences not visible from the street may be wood; slatted or tarp-covered chain link is prohibited except temporary construction screening, and chain link is allowed only where it is the existing predominant material and the Director approves; barbed or razor wire and electrified fencing along property lines are prohibited (read in GoCodebook's verbatim copy of the San Jacinto Municipal Code, a third-party mirror with text as of 2026-10-04, because the City's Code Publishing site returned a Cloudflare block page, HTTP 403, to plain curl).
  • Wood fence specification (17.315.070 A): pressure-treated Douglas fir or equivalent, vertical boards at least 1 inch by 6 inches, two coats of exterior paint or oil-base stain in a neutral color matching the stucco or structure, 2.5-inch tubular steel posts (3 inches beside a gate post) at 8 feet on center in 18 by 10 inch concrete footings, top and bottom rails on both sides, a 2 by 6 inch cap and galvanized hardware (read in GoCodebook's verbatim copy of the San Jacinto Municipal Code, a third-party mirror with text as of 2026-10-04, because the City's Code Publishing site returned a Cloudflare block page, HTTP 403, to plain curl).
  • Decorative masonry (17.315.070): split face block, brick or stucco-finished CMU; precision block is generally not decorative unless it is no more than about 25 percent of a split-face design, and slump stone is generally not decorative; walls separating different land uses or zones must be decorative masonry only, and residential subdivisions must provide solid decorative masonry walls along the tract perimeter, street side yards and corner-lot returns (read in GoCodebook's verbatim copy of the San Jacinto Municipal Code, a third-party mirror with text as of 2026-10-04, because the City's Code Publishing site returned a Cloudflare block page, HTTP 403, to plain curl).
Sources for these rules
  1. gocodebook.com: chapter 17.315 fences walls and hedges
  2. gocodebook.com: chapter 15.04 construction codes
  3. sanjacintoca.gov: Wall%20City%20Standards%20Fillable%20PDF
A wooden table with rolled blank site plans, a clipboard, fencing near San Jacinto in Hemet Valley Mall
Permit line

Does a fence need a building permit in San Jacinto, and what comes first at Planning?

Often not, if the fence behaves. The City's amendment to the building code's permit list exempts fences and walls accessory to a home on a single-family lot up to 6 feet, measured from adjacent grade, provided they comply with Title 17, the zoning code. Retaining walls over 18 inches need a permit, and so does any fence set on a retaining wall over 18 inches. The City's block wall handout still says to check with the Building Department, and it lists footing, rebar or pre-grout and final inspections when a permit is required.

Zoning is the other gate. A zoning clearance from the Planning Director comes before the City issues a construction permit for building or altering a structure, so a fence that needs a permit passes through Planning first, and the City's plot plan checklist asks for fence and wall heights and types. Owner-builders may pull permits for single-family homes and their accessory structures, while a contractor needs a state license and a San Jacinto business license. We read the exemption on a mirror, so confirm it at (951) 487-7330.

Ask for the permit number, or a written statement that none is needed, before the first post hole.

Fence posts set in concrete footings and braced, a string line stretched along them, fresh soil, fencing in San Jacinto City Museum, San Jacinto
Heights

How tall can a fence be in a San Jacinto front yard, side yard, corner lot or back yard?

In the front yard setback, 4 feet, open or solid. Table 3-4 of the Development Code allows 4 feet there, lets the RE and RR zones add 2 feet of open fencing on top for 6 feet overall, and allows 6 feet in interior side, street side and rear yards (8 feet in industrial zones). A fence in a required street side setback may not come within 20 feet of the front lot line, and a fence on a side yard return must sit at least 5 feet behind the front of the structure.

Height is measured from the highest finished grade touching the fence, and the code bars raising grade to gain height. We read no exception for a 7 foot fence, which would also pass the building code's 6 foot exemption line. A request for anything taller is a conversation with Planning before panels are ordered, not something a fence company can grant.

Ask Planning to mark your front setback line before any panels are ordered.

A tall cedar board-on-board privacy fence along a suburban backyard with raised planter beds and fresh st, fencing near San Jacinto in Hemet
Materials

Which fence materials are banned where a San Jacinto fence faces the street?

Wood is the surprise. A fence visible from the street on the street side or a side yard return must be solid decorative material (brick, concrete, masonry or stucco), or vinyl or wrought iron on a side return, and wood is prohibited there except as a decorative element with wrought iron. Front yard fences may be block, wrought iron, a mix of the two, or picket or split rail kept in new condition, and walls need decorative capping. Slatted or tarp-covered chain link is prohibited, chain link survives only where it is the existing predominant material and the Director approves, and barbed wire, razor wire and electrified fencing along property lines are banned.

Where a fence cannot be seen from the street, wood is allowed, and the standard is specific: pressure-treated Douglas fir or equivalent boards at least 1 by 6 inches, two coats of exterior paint or oil-base stain in a neutral color matching the home, 2.5 inch tubular steel posts at 8 feet on center in 18 by 10 inch concrete footings, rails top and bottom on both sides, a 2 by 6 inch cap and galvanized hardware.

Ask for the material list on the proposal, matched against the rule for each fence run.

A white wooden picket fence with a matching gate along the front yard of a California bungalow, fencing in Druding Park, San Jacinto
Block walls

Why does a San Jacinto block wall carry two wind speeds, and who builds it?

The City's own documents disagree. Municipal Code 15.04.020 F, added by Ordinance 25-08, requires block walls to be designed for a basic wind speed of 100 miles per hour because of documented local wind conditions and historic regional wind events, while the City's undated free-standing block wall handout still prints 85 mph, Exposure C, Seismic Design Category E, Site Class D, 1,500 psf soil bearing and 2,500 psi footing concrete. We use the 100 mph code figure, and the Division should confirm which standard sheet it accepts before footings are dug.

That handout covers a free-standing wall and allows no more than 6 inches of grade difference across it, so it is not a retaining wall. Block is masonry, and CSLB's C-13 fencing class excludes masonry walls, so a masonry subcontractor in class C-29 builds it. The code defines decorative masonry as split face block, brick or stucco-finished block, accepts precision block only as a small share of a split face design and generally rejects slump stone. We found no independent Inland Empire block wall price, so we print none.

Stucco-covered block wall with a smooth cap and a wooden pedestrian gate, a street tree and a sidewalk, fencing near San Jacinto in Hemet-Ryan Airport
Slopes

What changes on a slope: retaining walls, stepped embankments and the hillside chapter?

Slopes shift every number. A solid fence of 6 feet may be measured from the upslope property when the total, including any retaining wall, stays within 10 feet measured from the downslope property. In a front setback, an embankment over 48 inches must be stepped so that no exposed wall exceeds 48 inches, with at least 36 inches between steps, and a retaining wall up to 48 inches may stand there only if it covers no more than 5 percent of the setback.

The hillside chapter, 15.28, applies where the median slope exceeds 15 percent on half the site, sends the plan to the Planning Commission and limits retaining walls to 6 feet, or 36 inches in front yards. The City's retaining wall handout says its design is not for surcharge from vehicles or other structures and asks for drainage, either gravel with perforated pipe or open head joints in the first course. The General Plan also lists liquefaction, landslides and erosion among the city's hazards, so ask the engineer what the soil under the footing needs.

Have the engineer put the drainage detail on the plan before the wall is built.

A stepped wood fence following a sloped hillside lot, each panel level and the posts plumb, fencing in San Jacinto High School, San Jacinto
Lines and neighbors

What stops a San Jacinto fence at the line: neighbors, the street, pools and HOAs?

Neighbors come first. Civil Code section 841 presumes that adjoining owners share the reasonable cost of a boundary fence equally and expects an owner who plans to spend money to give each neighbor 30 days' written notice, though the presumption can be rebutted. The City will not referee: its Code Enforcement page says it does not enforce CC&Rs or handle neighbor disputes, so an HOA's fence rules are between you and the association. Put the agreement in writing, and hire a surveyor when the line is unclear.

Call 811 before digging, as the Engineering page says. A dig in a public street or alley needs an excavation permit from the superintendent of public works under 12.08.020. Pools are a separate rule: 17.315.060 C requires a pool, hot tub or spa, or the whole property it sits on, to be walled or fenced to prevent uncontrolled access under the California Building Code, and Planning varies fence height or type only through a wall and fence plan on estate lots over 10,000 square feet, hillsides or environmentally sensitive areas.

Mail the 30 day notice before the fence company orders materials.

Wooden survey stakes with orange flagging tape and a string line marking a property line along a backyard, fencing near San Jacinto in West Valley High School
Cost

How much does fence installation cost in San Jacinto, and who builds it?

We found no San Jacinto price survey, so the numbers come from Los Angeles and national guides, and a Riverside County proposal can differ. Angi's Los Angeles page, dated August 4, 2026, shows $15 to $60 per linear foot and $2,100 to $2,350 for 100 feet, HomeGuide's February 3, 2026 page lists $20 to $60 and Thumbtack's July 1, 2026 page lists $23 to $57. Blending them with Fixr, we plan $25 to $55 per linear foot for a 6 foot wood or vinyl privacy fence, $35 to $85 for aluminum or ornamental iron and $12 to $30 for chain link, or $2,500 to $5,500 for a 100 foot back yard. Under the street-facing rules above, wood and chain link are mostly back yard choices here.

Angi's national guide, updated October 13, 2026, lists $150 to $2,000 for a gate and $3 to $5 a foot to haul away an old fence. Wood also raises a termite question: the University of California's pest management guide says drywood termites are most prevalent in southern California and infest fences and decks, and it suggests termite-resistant wood or concrete footers where wood meets soil. Check the contractor with our license guide, and see how general contractors use subcontractors for who answers for what.

Fence material samples leaning against a stucco wall: a cedar picket, fencing in Mt. San Jacinto College, San Jacinto
Recent work

Fence photos from San Jacinto and nearby communities

Fencing scenes tied to San Jacinto places such as Druding Park, Downtown San Jacinto, Esplanade and the Trails, and to nearby communities such as Hemet, Valle Vista, Winchester and Lakeview, from open iron gates to block walls and solid back yard runs.

White vinyl privacy fence section in a suburban backyard with a lawn and a lemon tree, fencing near San Jacinto in Western Science Center
Black wrought iron fence and driveway gate in front of a stucco house with palms, fencing in City Hall, Building & Safety, San Jacinto
Close-up of black gate hinges and a latch on a wooden fence gate, fencing near San Jacinto in Hemet High School
Cost

Where these San Jacinto fence figures come from

Every fence price and its source sit in the table on the fencing page. Fence work often rides along with other exterior jobs, and the San Jacinto guides for them are the roofing page, the painting page and the kitchen remodeling page. To see how cities with different permit lines set their limits, compare the fence guides for Perris and Temecula.

Fencing price ranges used for San Jacinto estimates (Southern California sources, before permits)
What it coversTypical range
Wood or vinyl privacy fence, 6 feet$25 to $55 per linear foot
Chain-link$12 to $30 per linear foot
Aluminum or ornamental iron$35 to $85 per linear foot
Typical 100-foot backyard run$2,500 to $5,500 total
Block walls, horizontal slat fences, gates and openers, hillside lotsSet by the written proposal
FAQ

San Jacinto fence questions, answered

How much does fence installation cost for 100 feet in San Jacinto?

About $2,500 to $5,500 for 100 feet of 6 foot wood or vinyl privacy fence once several guides are blended, while Angi's Los Angeles page alone shows $2,100 to $2,350. Gates, old fence removal, slopes and block sections all move the number, so treat the range as a starting point until a site visit produces a written proposal.

Do I need a permit to build a fence in San Jacinto?

Not always. The City's amended building code exempts fences and walls up to 6 feet on single-family lots when they comply with the zoning code, but retaining walls over 18 inches, and any fence on one, need a permit. The block wall handout says to check with the Building Department. Call (951) 487-7330 and confirm before you build.

Can I put up a 7ft fence?

Probably not. The Development Code caps interior side, street side and rear yard fences at 6 feet, 8 feet only in industrial zones, and we read no exception for 7 feet. A taller fence would also be past the 6 foot building code exemption. Ask Planning before signing, because an exception is not something a fence company can grant.

How tall can my front fence be in San Jacinto?

Four feet, open or solid, in the front yard setback. The RE and RR zones may add 2 feet of open fencing on top for 6 feet overall. A street side fence may not come within 20 feet of the front lot line, and a side yard return must sit at least 5 feet behind the front of the structure. Confirm your zone with Planning.

Can I put a privacy fence up in my front yard?

Not a tall one. Front yard fences stop at 4 feet and must be block, wrought iron, a combination, picket or split rail in new condition, with decorative capping on walls. Slatted chain link is banned, and wood is prohibited where a fence is visible from the street on the street side or a side return.

Do you need a permit to build a block wall in California?

In San Jacinto, a free-standing block wall on a single-family lot is exempt up to 6 feet if it follows Title 17, but the City's handout says to check with the Building Department, and walls are designed for 100 mph wind under the code. A masonry contractor, not a C-13 fence contractor, builds it. Confirm the exemption and the standard sheet.

What is the maximum height of a retaining wall without a permit in California?

In San Jacinto the line is 18 inches: retaining walls over 18 inches, and any fence on a retaining wall over 18 inches, need a building permit. Hillside lots limit retaining walls to 6 feet, or 36 inches in front yards, and front setback walls above 48 inches must be stepped. Ask the Division before any slope work.

Does your neighbor have to pay for half the fence in California?

Often, but only as a presumption. Under Civil Code section 841, owners on each side of a boundary fence are presumed to split its reasonable cost equally, and the owner who plans to spend money should give each neighbor 30 days' written notice. A neighbor can rebut the presumption, so agree on the terms in writing first.

Is it cheaper to install a wood or vinyl fence?

Usually wood, though the ranges overlap: Angi's national guide, updated October 13, 2026, puts wood at $10 to $45 per foot and vinyl at $15 to $40. In San Jacinto, wood is barred where a fence is visible from the street and vinyl is allowed only on side returns there, so the street side often decides the material.

Is chain link allowed in San Jacinto?

Only in narrow cases. Slatted or tarp-covered chain link is prohibited, and plain chain link is allowed only where it is the existing predominant material and the Planning Director approves. It is mostly a rear yard choice, where we plan about $12 to $30 per linear foot from Los Angeles guides.

Free estimate

Get a fence plan for your San Jacinto lot

Send your street or neighborhood, whether the fence runs along the front, a side, a corner or the back, the height you want and whether a block wall or a slope is involved. We check the height table, the street-facing material rules and the wall handouts before we call back.

Free estimate · A real person answers · (888) 666-8224

Call (888) 666-8224