Tarzana, CA · Serving Southern CaliforniaCSLB #1040337 · (888) 666-8224
Roofing in Pasadena

Roofing Companyin Pasadena, CA

Quick answer

A roofing company in Pasadena works under a City re-roof permit, because the City's permit-exempt list does not name reroofing, and roof replacement in 2026 must meet the Climate Zone 9 cool roof rule. A roofing contractor should check Arroyo Seco, north-of-210 and upper Hastings Ranch parcels for a fire zone before roof repair or replacement.

CSLB #1040337 5.0 on Houzz Free written estimate
Finished charcoal-gray shingle roof on a suburban two-story house with new gutters and a few solar panels, roofing in Old Pasadena, Pasadena
CSLB #1040337Verified at CSLB
5.0 on HouzzRated by clients
Written proposalsScope and price in writing
Licensed specialistsSubcontractors do the work

Roofing in Pasadena is rarely one rule for the whole city. The City's adopted 2021-2029 Housing Element says 85 percent of its housing stock went up before 1990, so a re-roof in Madison Heights, Lamanda Park or Orange Heights often opens up sheathing and flashing that are older than today's energy and fire codes. What sits under the old layer, and which map your parcel lands on, sets the job more than the color of the shingle.

Heat and rain both matter here. Wikipedia's Pasadena article, citing NOAA and National Weather Service 1991 to 2020 normals, gives average highs of 89.1 F in July and 91.3 F in August and 20.08 inches of rain a year, which is hard on dark shingles in summer and on tired flashing in a wet winter. MDG Builders (CSLB #1040337) is a general contractor in Tarzana: we write the scope, check the permit path and manage the schedule, and a licensed roofing subcontractor does the tear-off and installation. Our roofing guide covers materials in general, and the Pasadena overview lists every trade we manage here.

Roofing rules in Pasadena

What the Pasadena Permit Center and Fire Department publish about roofs

  • The City's list of work exempt from a building permit (written under CBC 105.2 and CRC R105.1) names sheds, non-masonry fences, small retaining walls, small decks, sidewalks and driveways, and painting and similar finish work. It does not name reroofing, and the sheet notes that a zoning permit may still be required for the exemptions.
  • The City's building permit application lists "Roof/Stucco/Siding/Window" as a permit type, and the City's fee schedule treats re-roofing as a flat-rate permit priced by size in squares, in four tiers: up to 20 squares, over 20 up to 50, over 50 up to 100, and over 100.
  • The fee schedule that lists the re-roofing tiers is labeled effective August 22, 2017 (Fiscal Year 2018). The Permit Center says current building permit fees are in the General Fee Schedule, fees 221 to 363, so ask for today's re-roof fee rather than quoting the 2017 sheet.
  • Pasadena is in California Energy Climate Zone 9, and the Building & Safety design parameters sheet (revised 12/31/2025) lists the residential design wind speed as 95 mph, Exposure C, with 110 mph allowed for the Special Wind Region.
  • Under the 2025 California Energy Code, effective January 1, 2026, a re-roof of a single-family home with a steep-slope roof in climate zones 4 and 8 to 15 (which includes Pasadena's zone 9) must use roofing with an aged solar reflectance of at least 0.20 and thermal emittance of at least 0.75, or an SRI of at least 16. This comes from the Cool Roof Rating Council's chart of the code, which tells readers to check the code itself.
  • The same CRRC chart lists ways to meet the re-roof rule without a high-reflectance product: ceiling insulation of at least R-38 or a ceiling U-factor of 0.025 or lower, a radiant barrier in the attic, in climate zone 9 a house with no ducts in the attic, or at least R-2 continuous insulation above or below the roof deck. Roof constructions weighing at least 25 pounds per square foot are exempt.
  • The City adopted the 2025 California Wildland-Urban Interface Code, Building Code, Residential Code and Energy Code, effective January 1, 2026. The Permit Center says the City may have amended them and points to Title 14, chapters 14.03 and 14.04, for modifications, and it lists optional 2022 codes for Eaton Fire rebuilds.
  • CAL FIRE's statewide FAQ, which the Pasadena Fire Department posts for its zone update, says California Building Code Chapter 7A applies to the design and construction of new buildings in High and Very High fire hazard severity zones in local responsibility areas, and that local ordinances may require ignition-resistant construction for remodels. It says to check with the local building department.
Sources for these rules
  1. cityofpasadena.net: Work Exempt from Building Electrical Mechanical and Plumbing
  2. cityofpasadena.net: Building Permit Application
  3. cityofpasadena.net: Building Permit Fees
  4. cityofpasadena.net: Design Parameters and Special Considerations 2025
  5. coolroofs.org: 2025 Energy Code Summary CRRC 2025 12 04 1
  6. cityofpasadena.net: codes and regulations
  7. cityofpasadena.net: Fire Hazard Zone FAQs ENGLISH
A wooden table with rolled blank drawings, a clipboard, roofing near Pasadena in South Pasadena
Fire zones

Does a roof in a Pasadena fire hazard zone need to be Class A?

The Fire Department says the zones generally lie in the Arroyo Seco, west and north of the 210 freeway, and in upper Hastings Ranch. Its June 2025 report says CAL FIRE's map dated March 24, 2025 would put 4,610 properties in the Very High zone, up from 3,911 under the 2008 map, with 887 parcels added and 188 removed.

We could not confirm that the City Council adopted that map, so treat it as proposed and look up your address on the Fire Department's zone page. Parcels near the line are the ones that change a quote, so check before you collect estimates.

What a zone means for a roof depends on the work. CAL FIRE's statewide FAQ, which the Fire Department posts, says Chapter 7A of the California Building Code covers new buildings in High and Very High zones in local responsibility areas, and that local ordinances may require ignition-resistant construction for remodels. It tells owners to ask the local building department. So we never tell an owner near the Arroyo Seco that a roof-only job is exempt, and we do not promise a fire class from memory; we ask the Permit Center in writing and price the ignition-resistant option until it answers.

Ask the Permit Center in writing whether a roof-only job in your zone must be ignition-resistant.

A hillside Southern California neighborhood of homes with tile and composition roofs among dry chaparral , roofing in Playhouse District, Pasadena
Rebuilds

Rebuilding a roof after the Eaton Fire in Pasadena

The Eaton Fire is part of the fire map. It destroyed 185 structures in Pasadena, mostly single-family homes and accessory structures in Upper Hastings Ranch, Victory-Rose, Dundee Heights and NATHA.

As of October 20, 2025, 35 rebuild applications had been filed and nine building permits issued, and Council had reduced or waived plan check and permit fees for eligible rebuilds in August 2025. The Permit Center lists optional 2022 codes for those rebuilds, so a family rebuilding should ask which code edition its permit follows before the roof is ordered.

A rebuild is where the other rules on this page meet: the fire zone lookup, the Zone 9 cool roof rule and a contractor who can name the permit path in writing. Ask for all three in the proposal.

Plywood roof decking covered with synthetic underlayment and drip edge, a ridge line against a clear sky, roofing near Pasadena in San Marino
Landmark districts

Can I re-roof a house in Bungalow Heaven or Banbury Oaks?

The City says it has designated six areas as historic districts, and its site carries conservation plans for Bungalow Heaven, Garfield Heights and Banbury Oaks. Bungalow Heaven's plan, adopted by the City Council on June 16, 2025, sends roofing changes visible from the public right-of-way to City staff review before a building permit, including the material and the installation pattern of shingles or tiles. Banbury Oaks treats like-for-like work more lightly: its plan, revised in 2002, exempts reroofing, including the color of composition shingles, unless the material changes.

Changing the material is where owners get caught. In Banbury Oaks, a change in roofing material or roof slope that shows from the street goes to the planning director. The City's 2002 historic district design guidelines say to keep original roof materials that are in good condition (policy 6.3), call wood and composition shingles appropriate replacements for most roofs, and say a specialty material such as tile should be replaced with a matching one whenever feasible. They add that metal roofs are in general inappropriate in these districts (guideline 6.9).

Where a Certificate of Appropriateness is required, it delays a building permit by about two months and charges no fee. Email the Design and Historic Preservation staff at dhpquestions@cityofpasadena.net with photos of the current roof from the street.

Match the existing material and pattern first, and ask before changing anything that shows from the street.

Close detail of a clay tile roof where a few broken tiles have been replaced with matching new tiles, roofing in Bungalow Heaven, Pasadena
Permit

Do I need a permit for roof replacement in Pasadena?

Plan on one. The City publishes a list of work exempt from a building permit, written under CBC 105.2 and CRC R105.1, and it names sheds, non-masonry fences, small retaining walls, small decks, sidewalks, driveways and painting. Reroofing is not on that list. The City's building permit application, meanwhile, offers Roof/Stucco/Siding/Window as a permit type, and its fee schedule treats a re-roof as a flat-rate permit priced by size in squares, in four tiers: up to 20 squares, over 20 up to 50, over 50 up to 100, and over 100.

We do not print a fee, because the schedule that shows those tiers is labeled effective August 22, 2017, and the Permit Center says current fees sit in the General Fee Schedule, fees 221 to 363. Ask for today's re-roof fee. Applications go through the Citizen Self Service portal or at the counter, which is open Monday to Thursday and alternate Fridays from 8:30 a.m. to 3:00 p.m. The Permit Center says simple projects that meet its thresholds can be reviewed over the counter in as little as 5 to 10 minutes, while complex plans take about two to four weeks.

A permit is valid for 180 days from issuance, so crew scheduling matters.

Get the permit number in writing before the tear-off day.

A composition shingle roof replacement in progress: half the roof covered with new gray architectural shi, roofing near Pasadena in Altadena
Energy code

What is the Zone 9 cool roof rule for a Pasadena roof replacement?

Pasadena sits in California Energy Climate Zone 9, according to the City's Building & Safety design parameters sheet. Under the 2025 California Energy Code, effective January 1, 2026, re-roofing a single-family house that has a steep-slope roof in climate zones 4 and 8 to 15 calls for roofing with an aged solar reflectance of at least 0.20 and a thermal emittance of at least 0.75, or a solar reflectance index (SRI) of at least 16. We read that from the Cool Roof Rating Council's chart of the code, which tells readers to check the code itself, so ask your roofer to show you the product's rating label.

A reflective product is not the only way to comply. The same chart lists the alternatives below, and it exempts roof constructions weighing at least 25 pounds per square foot, which takes in many heavy tile roofs. Your proposal should name the route in use, because a quote that names only a dark brown architectural shingle leaves the Energy Code question open.

  • Ceiling insulation of at least R-38, or a ceiling U-factor of 0.025 or lower
  • A radiant barrier in the attic
  • In climate zone 9, a house with no ducts in the attic
  • At least R-2 continuous insulation above or below the roof deck
Roofing material samples on a driveway: a gray shingle, roofing in Lamanda Park, Pasadena
Hiring

How do I hire a roofing company in Pasadena for roof repair or replacement?

MDG Builders holds general contractor license CSLB #1040337, and the roof itself is installed by a licensed subcontractor in the C-39 Roofing classification. CSLB defines C-39 as installing products and repairing surfaces that seal, waterproof and weatherproof structures, using materials such as asphaltum, felt, urethane foam, metal roofing systems, shakes, shingles, roof tile and slate. Our own classifications are B and C-61/D12, so we manage and the specialist builds.

Ask us, or any roofer, for the C-39 license number and a certificate of insurance. To pull a permit, a contractor must show a valid contractor license and a current City of Pasadena business license, and workers' compensation insurance is required. Staff check the license through CSLB, and before tear-off we confirm that the roofing subcontractor holds all three. Our guides show how to check a license on CSLB and how general contractors use subcontractors.

  • The roofer's C-39 license, Pasadena business license, workers' compensation and certificate of insurance
  • The permit type and who is pulling it
  • The cool roof route for Zone 9 and the fire zone answer for your parcel
A ladder leaning against the eave of a stucco house with a clay tile roof and a closed clipboard hanging , roofing near Pasadena in Eagle Rock
Contract

What should a roofing contract in California include?

California's home improvement contract law, Business and Professions Code 7159 as amended by SB 517 effective January 1, 2026, calls for a written, signed contract with the contract price, a project description naming significant materials, and start and completion dates. A down payment may not exceed $1,000 or 10 percent, whichever is less, progress payments must follow work actually done, and change orders go in writing. The contract also asks whether subcontractors will be used, and it gives you three business days to cancel, or five if you are a senior.

Add two roof-specific lines to it: a per-sheet price for replacing rotten decking found at tear-off, and who removes and resets solar panels, since Angi notes they often must come off and go back.

Roofers who work across the foothills meet different maps in Glendale and the City of Los Angeles, so a company's Pasadena answers should be specific rather than copied from a page for another city. A new front fence or a repaint at the same house follows other rules, covered on our Pasadena fencing page and Pasadena painting page.

A modern California house with a dark standing-seam metal roof, white stucco walls and a blue sky, roofing in Hastings Ranch, Pasadena
Recent work

Roofing photos from Pasadena and nearby neighborhoods

Six photos of roofing scenes in Pasadena and its neighbors, from shingle and tile surfaces to flashing and ridge details.

Roof eave with a new white fascia board, a seamless gutter, a drip edge and new gray shingles meeting it, roofing near Pasadena in La Cañada Flintridge
A composition shingle roof with a neat array of black solar panels, palm trees and a clear sky, roofing in Linda Vista, Pasadena
A low-slope flat roof freshly coated with a white reflective membrane, roofing near Pasadena in Sierra Madre
Cost

What a Pasadena re-roof costs, and where the number comes from

Our roofing price table is the sourced starting point: Angi's July 2026 Los Angeles data puts asphalt shingle at $4 to $12 per square foot, tile at $7 to $15 and metal at $7 to $16, with tear-off at $1,000 to $3,000 and solar panel removal and reinstallation at $500 to $1,000 on top. We could not verify a Pasadena-specific price source, so read these as Los Angeles-area figures. Decking repair, a matching tile in a landmark district or a fire zone assembly can move the total, and our California roofing cost guide explains each line.

Roofing price ranges used for Pasadena estimates (Southern California sources, before permits)
What it coversTypical range
Asphalt shingle, typical single-family roof$10,000 to $25,000
Concrete or clay tile$7 to $15 per sq ft
Metal$7 to $16 per sq ft
Remodeling Cost vs. Value 2025, Los AngelesAsphalt $36,417.
metal $62,069.
ExtrasTear-off $1,000 to $3,000.
solar detach and reset $500 to $1,000.
FAQ

Pasadena roofing questions, answered

How much does roof replacement cost in Pasadena?

Roof replacement here runs on Los Angeles-area figures, because we found no Pasadena-specific survey we can verify. Angi's July 2026 Los Angeles data gives $4 to $12 per square foot for asphalt, $7 to $15 for tile and $7 to $16 for metal, so the size of the roof drives the total more than anything else.

Is $50,000 a fair price for a new roof in Pasadena?

It is high for a typical asphalt roof and plausible only for metal, tile or a very large house. Remodeling magazine's Cost vs. Value 2025 report priced a reference asphalt replacement in Los Angeles at $36,417 and metal at $62,069, while Angi's Los Angeles average is $17,271. Ask for roof area and material in writing.

Do I need a permit to replace my roof in Pasadena?

Yes, plan on a City permit. The exempt-work list does not name reroofing, the permit application offers a Roof/Stucco/Siding/Window type, and re-roofing is a flat-rate permit priced by squares. The Permit Center confirms today's fee, and a landmark district may add a review step before the permit issues.

What is the 25 percent rule for roofing?

We could not tie a 25 percent rule to any Pasadena or California code we read, so we do not rely on it. The re-roof rule we can source is the 2026 Energy Code cool roof requirement for Climate Zone 9. Ask the Permit Center how it counts a partial re-roof before you split the job.

Should a 20-year-old roof get roof repair or a full roof replacement in Pasadena?

Age alone does not decide it; an inspection does. Look for curled or missing shingles, cracked tile, stains or daylight in the attic, and soft decking near flashing. A repair cannot fix decking that has soaked through, so ask the inspector to say plainly whether patching buys real time.

Will insurance cover a 20-year-old roof in California?

Coverage depends on your policy wording and on what caused the damage, and we cannot read your policy for you. California's Safer from Wildfires rules list a Class A roof among mitigation actions, so ask your insurer in writing what it counts before tear-off, and keep dated photos of the roof.

Does a Pasadena fire zone require a Class A roof?

Not always, and we will not guess. Chapter 7A covers new buildings in High and Very High zones, while local ordinances may require ignition-resistant construction for remodels. The zones lie around the Arroyo Seco, north and west of the 210 and in upper Hastings Ranch, and the Permit Center answers for a roof-only job.

Do I need approval to re-roof in Bungalow Heaven?

Yes, if the change shows from the street. Bungalow Heaven's 2025 plan sends visible roofing changes, including material and shingle or tile pattern, to City staff review before the building permit. Banbury Oaks exempts re-roofing unless the material changes. Email the Design and Historic Preservation staff with photos first.

What should I ask a roofing contractor in Pasadena before signing?

Ask for the C-39 license number and check it on CSLB, then a current Pasadena business license, workers' compensation and a certificate of insurance. Get the permit number, the Zone 9 cool roof route and a decking repair price in writing. The best roofer is the one whose paperwork checks out.

How long does a roof replacement take, and what are the downsides?

We do not print a day count, because roof size, tile versus shingle, weather and decking repairs change it. The contract must state start and completion dates. Common downsides are decking repairs found at tear-off, noise, solar panels that must come off and go back, and a permit or review step before work starts.

Free estimate

Send the address and a photo of your roof

Tell us the street, the roof material and any leaks you have seen. We check the fire zone, landmark district and permit path for the address before we call.

Free estimate · A real person answers · (888) 666-8224

Call (888) 666-8224