Concrete Companyin Pasadena, CA
A concrete company in Pasadena works around three local rules: front setbacks may be paved only up to 30 percent with Zoning Administrator approval, the owner pays to repair the sidewalk in front of the house, and retaining walls over 4 feet or on steep slopes need engineering. Plain driveway and walk work is often exempt from a building permit.

Concrete has shaped Pasadena streets since the city's first boom. The City's own guidelines say Pasadena incorporated as a Charter City in 1886, that concrete sidewalks were popular and lined many streets, and that a few early concrete address curb markers from the 1900s to the 1920s survive in the Orange Heights district. The adopted Housing Element says 85 percent of the housing stock was built before 1990, so many driveways, walks and slabs have decades of wear on them.
MDG Builders (CSLB #1040337) is a general contractor in Tarzana. We scope the job, handle the permit questions and manage the schedule, and a licensed concrete subcontractor forms, pours and finishes the work. Our concrete guide explains slabs, finishes and pricing in general, and the Pasadena overview lists the other trades we manage here.
What Pasadena's Permit Center, Public Works and design guidelines say about concrete
Where concrete permits come from in Pasadena: City of Pasadena Planning & Community Development Department, Permit Center.

How much of a Pasadena front yard can be paved for a driveway or patio?
Less than most owners hope. As quoted in an applicant's slide in a January 12, 2026 City Council agenda packet, Zoning Code 17.40.160.F.3 says no part of a front or corner side setback in a residential zone may be paved unless the Zoning Administrator approves it, and not more than 30 percent of that area may be paved. The slide's example: 1,036 square feet of paving on a 2,759 square foot front yard is 37.5 percent, over the line, while 609 on 2,166 is 28.1 percent. We read the code through that slide, not Municode, so ask Zoning at zoningquestions@cityofpasadena.net about your lot.
The Permit Center lists a zoning permit for driveways and other paving in residential zones, inspected by a code compliance officer and charged at a flat fee for single-family homes. Widening a driveway or adding a front patio therefore starts at zoning, even where the building permit exemption applies.
In landmark districts the guidelines go further. They call front yard parking paving inappropriate in most cases and suggest two paved strips with turf between, a Hollywood drive, in place of a wide slab.

Who pays to fix a cracked sidewalk in Pasadena, and does the City help?
The property owner does. Public Works says sidewalk repairs are the primary responsibility of the owner, and under Municipal Code Chapter 12.04 the owner makes permanent repairs to damaged frontage sidewalk, including damage from street trees. The City's reimbursement program pays 50 percent of the cost, up to $8 per square foot and $1,000 per property frontage, if you apply before the permit is issued, work under a Public Works permit and hire a contractor registered with the Department of Industrial Relations.
Two cautions. Only the City may work on City trees, and unauthorized pruning draws citations under Chapter 8.52, but during a repair you can ask the Citizen Service Center for a City arborist to advise which exposed roots may be pruned, per the Urban Forestry FAQ. And the application form states two deadlines for the reimbursement request, six months from approval and three months from permit issuance, so ask Public Works at (626) 744-4195 which governs. A temporary patch can be requested at (626) 744-7311.
- Was Form 1 of the reimbursement program filed before the permit?
- Is the contractor registered with the Department of Industrial Relations?
- Will a City arborist look at the exposed roots before they are cut?

Do you need a building permit for a driveway, patio or walkway in Pasadena?
Often not for a slab on grade. Item 6 on the City's exempt-work sheet covers sidewalks and driveways not more than 30 inches above adjacent grade, with a slope not exceeding 1:2 (8.33 percent), not adjacent to a slope steeper than 3:1, not over a basement or story below and not part of an accessible route. A patio slab is not named, and the sheet warns that a zoning permit may be required for exemptions, so we ask the counter about anything that is not a plain driveway or walk.
Work in the public right-of-way, such as sidewalk repair, goes through Public Works instead. The Permit Center says a contractor presents a contractor license and a current Pasadena business license, and that permits last 180 days from issuance. Call (626) 744-4200 before ordering concrete for anything on a slope.
Rebuilds after the Eaton Fire start with foundations. The City says 185 structures burned in Pasadena, mostly in Upper Hastings Ranch, Victory-Rose, Dundee Heights and NATHA, and that Council reduced or waived plan check and permit fees for eligible rebuilds. Footings and slabs for those lots follow the approved plans, not the exemption list.
A ready-mix delivery cannot be returned, so confirm the permit path before the truck is booked. Ask for the answer by email so it can go in the project file.

Retaining walls and footings on a Pasadena hillside lot
The exempt sheet covers retaining walls not over 4 feet high, measured from the bottom of the footing to the top of the wall, unless they carry a surcharge. Taller walls, or walls holding a driveway or a slope, are permit work, and the Permit Center says fence and retaining wall permits take one week of review.
A soils investigation report is required under the City's Design Parameters sheet (revised December 31, 2025) for hillside construction such as decks, retaining walls and pools, and for projects in mapped fault hazard or liquefaction areas. A wall designed to the Category 5 soil properties in CBC Table 1806.2 is exempt from that, but a wall carrying vehicle surcharge or supporting a slope steeper than 1:3 needs a report. Chapter 14.05 of the Municipal Code is the Hillside Grading Ordinance for excavation and earthwork.
Licensing splits the work. CSLB's C-8 classification covers forming, pouring and finishing concrete, C-29 covers concrete block walls, and the C-13 fencing class excludes masonry walls. We assign a poured wall to a C-8 firm and a block wall to a C-29 firm, and ask for the license number before the quote.
On a slope, ask who orders the soils report and whether drainage behind the wall is in the price.

How do Pasadena's historic guidelines affect old sidewalks, curbs and stone walls?
The City's Design Guidelines for Historic Districts, dated April 2002, say detached sidewalks separated from the street by a parkway are traditional in many neighborhoods. They list concrete curbs, gutters and sidewalks, Arroyo stone and often scored concrete retaining walls among Orange Heights streetscape features, and they describe stone retaining walls on streets where houses sit above the road on steeper slopes.
Guideline 10.1 says to replace only the portions of a sidewalk or driveway that are deteriorated beyond repair, matching color, texture, size and finish. Guideline 10.2 asks a new sidewalk to align with existing ones and to match their scoring or brushing pattern. That means the contractor copies the neighbors' joint spacing and surface instead of pouring a plain slab. Bungalow Heaven lists flat concrete work, including driveways and walkways, as not subject to review for contributing houses, but ask before breaking out any section that holds an early stamp or marker.
- Will the new squares match the neighbors' scoring and surface?
- Which sections are being replaced and which repaired?
- Is the lot inside a landmark district with its own plan?

What does concrete work cost for a Pasadena patio, driveway or walk?
We found no Pasadena price study with a stated method, so these are Los Angeles figures. Angi's Los Angeles pages from 2026 and HomeGuide overlap on plain patios, walkways and slabs at roughly $8 to $14 per square foot installed on a flat site with a 4 inch broom finish. Decorative finishes such as stained, stamped or exposed aggregate run $15 to $30, and driveway replacement $9 to $20 including demolition of the old slab. We rate plain flatwork medium in confidence and driveways low.
Small jobs run above per-foot averages because of minimum charges. The Bureau of Labor Statistics put the mean cement mason wage in the Los Angeles-Long Beach-Anaheim area at $33.67 an hour in May 2025. We print no per-foot price for retaining walls, since Angi's Los Angeles average of $7,140 sits inside a typical range of $2,674 to $11,842 that depends on height, drainage and engineering.
A sidewalk repair has its own math. The City's $8 per square foot reimbursement cap sits below the $8 to $14 flatwork range, and the $1,000 ceiling per frontage is reached quickly on a long frontage, so budget for the owner's share to be more than half on larger jobs. Ask for the sidewalk, any driveway apron and the tree-root work to be priced as separate lines.

Concrete photos from Pasadena and nearby neighborhoods
Six photos of concrete work around Pasadena and its neighbors, from walks and driveways to forms, rebar and block walls. Tap a photo to enlarge it.



What concrete costs around Pasadena
Prices here are the Los Angeles ranges on our concrete page, not a Pasadena quote. Demolition and haul-off, rebar, a soils report on a hillside, tree-root work and the sidewalk permit are separate lines in a proposal. Check any bidder first with our license check guide. Related pages: concrete work in Los Angeles, fence installation in Pasadena, painting in Pasadena and the Glendale overview.
| What it covers | Typical range |
|---|---|
| Patio, walkway or slab, broom finish, 300 sq ft or more | $8 to $14 per square foot |
| Decorative: stained, stamped or exposed aggregate | $15 to $30 per square foot |
| Driveway replacement, with demolition of the old slab | $9 to $20 per square foot |
| 20 by 20 foot plain patio (400 sq ft) | About $3,200 to $5,600 |
| 20 by 20 foot decorative patio (400 sq ft) | About $6,000 to $12,000 |
| Small jobs under 300 sq ft | Usually above the per-foot range |
| Retaining walls | Set by the written proposal |
Pasadena concrete questions, answered
Can I pour a concrete patio without a permit in Pasadena?
Possibly. A plain patio slab is not named on the City's exempt-work sheet, which covers sidewalks and driveways under 30 inches above grade, and the sheet warns zoning approval may still be needed. A patio in the front setback also counts toward the 30 percent paving cap. Ask the Permit Center before you order concrete.
Can I expand my driveway without a permit in Pasadena?
Not without checking zoning first. The Permit Center lists a zoning permit for driveways and other paving in residential zones, and the code quoted in a 2026 City Council packet caps front setback paving at 30 percent with Zoning Administrator approval. A building permit may not be needed, but zoning approval can be.
Who pays to fix a cracked sidewalk in Pasadena?
The adjoining property owner pays, including for damage from street trees, under Municipal Code Chapter 12.04. The City reimburses 50 percent of the cost, up to $8 per square foot and $1,000 per frontage, if you apply before the permit and use a Department of Industrial Relations registered contractor. A temporary patch is available at (626) 744-7311.
What is the maximum height of a retaining wall without a permit in Pasadena?
Four feet, measured from the bottom of the footing to the top of the wall, and only if it carries no surcharge. The City's exempt-work sheet sets that line. A wall supporting a driveway, vehicles or a slope steeper than 1:3 may also need a soils report, and retaining wall permits take about one week to review.
How much does a concrete driveway cost in Pasadena?
We found no Pasadena study, so use Los Angeles figures: about $9 to $20 per square foot for driveway replacement including demolition of the old slab, a low-confidence range from Angi's 2026 pages. Slope, access, thickness and finish move it. A written proposal after a site visit sets the real price.
How much should a 20x20 concrete patio cost in Pasadena?
Multiplying the Los Angeles flatwork range of $8 to $14 per square foot by 400 square feet gives about $3,200 to $5,600 for a plain patio, and $6,000 to $12,000 at the $15 to $30 decorative range. That is arithmetic on sourced ranges, not a quote, and small jobs often carry minimum charges.
Is 4 inches of concrete thick enough for a driveway?
Four inches is a common residential choice, but we found no code citation that fixes it, so treat it as practice rather than rule. Vehicle loads, soil and reinforcement can call for more. Ask the concrete subcontractor for the thickness, base and rebar in writing, and expect a soils question on slopes.
Who is allowed to do concrete work in Pasadena, and what license do they need?
California requires a contractor license for concrete work of $1,000 or more, or any job needing a permit, under Business and Professions Code 7048. The specialty class is C-8 for concrete and C-29 for block walls. A contractor pulling a permit also needs a current Pasadena business license, and you can check the CSLB number online.
Do you replace cracked or sunken concrete in Pasadena?
Yes, through a licensed concrete subcontractor that we manage. The first step is finding why it moved, whether roots, drainage or a poor base, since new concrete on the same cause cracks again. For the public sidewalk in front of the house, the City reimbursement program may cover half the cost.
What concrete finish suits a driveway in a Pasadena historic district?
Exposed aggregate is one of the materials the City's guidelines call appropriate, with decomposed granite, gravel and chip and seal, while plain asphalt and large paved areas are discouraged. They also prefer surfaces that do not send runoff to the street. Hollywood drive strips with turf between are another option.
Send the address and a photo of the area
Tell us the street, the size of the area, the slope and whether the slab, wall or sidewalk is new or a repair. We check zoning and Public Works before we call.