General Contractor Compton, CA: Postwar Homes, Presale Reports and Eleven Trades
A general contractor in Compton plans around four local rules: a presale inspection before any residential sale, the Uniform Paint Ordinance on 13 named streets, a 3 1/2 foot open front fence limit and the R-A large lot zone. Half the homes date from 1940 to 1959. MDG Builders, CSLB #1040337, manages eleven trades here.
Eleven trades we manage for Compton homes
Each page below takes one trade and applies Compton's municipal code, forms and housing stock to it, with the official sources linked. Pick the job closest to yours.

Kitchen Remodeling in Compton
Where Compton's permit line falls for cabinets and pipes, the presale report, 1950s walls and the plan check sheet rules.
See Compton kitchen remodeling →
Bathroom Remodeling in Compton
The presale inspection, 1940s and 1950s plumbing, the Chapter 15 exemption list and Monday to Saturday work hours for Compton bathrooms.
See Compton bathroom remodeling →
ADU Construction in Compton
Ordinance 2341 sizes and setbacks, the 60 day review, garage conversions, R-A lots and the recorded covenant for Compton ADUs and JADUs.
See Compton ADU construction →
Room Additions in Compton
Design review, yard setbacks, Title 24 plan forms, liquefaction and presale inspections for Compton room additions.
See Compton room additions →
Roofing in Compton
Three City re-roof inspections, the Class B minimum, no roofing over unpermitted rooms and what Compton's exemption list leaves out.
See Compton roofing →
Windows in Compton
The permit gap in Compton's exemption list, energy labels for Climate Zone 8, lead-safe rules and glass questions for 1940s and 1950s homes.
See Compton window replacement →
Flooring in Compton
The presale building records report, floors in 1940s and 1950s bungalows, asbestos and lead checks, slab moisture, permit gaps and rental rules.
See Compton flooring →
Painting in Compton
The Uniform Paint Ordinance on 13 named streets, the code versus form fee conflict, lead-safe rules and stucco prep for Compton houses.
See Compton painting →
Concrete in Compton
Driveway width and thickness, curb and apron permits, block and retaining walls, liquefaction and flood maps, old 1950s slabs and costs by the foot.
See Compton concrete work →
Decks in Compton
An exemption list that never names decks, six-foot yard projections, deck repair on 1950s houses, ledger and footing details and wood versus composite costs.
See Compton deck building →
Fencing in Compton
The 3 1/2 foot front yard limit, solid rear yard fences, design review on busy streets and the 25 percent replacement trigger.
See Compton fencing →Why do Compton's presale report and paint streets matter before you hire a contractor?
Compton's age shows up in every estimate. A party of 30 families led by Griffith Dickenson Compton settled the northeast corner of Rancho San Pedro in 1867, the town took its name in 1869, and it incorporated on May 11, 1888 as the eighth city in Los Angeles County. The earthquake of March 10, 1933 toppled schools and damaged the main business district, and the postwar years filled in most of what stands today: the City's 2021 to 2029 Housing Element says half of all homes went up between 1940 and 1959. Census Bureau 2024 estimates count about 23,647 housing units, with 61.1 percent built before 1960, 77.8 percent before 1980, 69.7 percent single-family detached and 44.6 percent of households renting. The Housing Element names roofs, foundations and plumbing as the usual major work on housing over 30 years old, so a roof repair or replacement, new windows, a bathroom remodel or a kitchen remodel here begins with a look at what sits behind the finish. Households also run large, averaging 4.17 people against 2.96 across the county, which explains why converted garages and added rooms are common.
Those conversions matter at sale. Under Municipal Code Sections 14-2.3 and 14-2.4, every residential sale or exchange needs the City's Report of Residential Building Records, and Form B-004 lists a $129 inspection for a single-family home, a report valid for six months and an inspection of every room, closet, garage and shed. A buyer can accept violations AS-IS with a notarized release, or the seller can correct them, which may mean permits to legalize an unpermitted room addition or garage conversion. Permits themselves run through the Building and Safety Department and its Citizen Serve portal, which Form B-016 limits to a contractor or broker holding an active City business license issued by the Business License Department. An issued permit becomes invalid if work has not started within 365 days or stops for 180, and a plan check submittal lapses if the permit is not issued within 180 days of approval. Work noise is allowed only from 7:00 a.m. to 7:00 p.m. Monday through Saturday under Section 7-12.22, so schedules here have no Sunday.
What the City has not published matters too. We found no building permit fee schedule for Compton, only a Planning fee schedule that lists $770 for Architectural Review Board design review of additions, patio covers and garages, so none of our pages prints a permit amount; the written proposal carries whatever the counter quotes. Chapter 15 adopts the 2019 California codes by reference, while the City's residential plan check form lists 2022 editions and its ADU form, revised in January 2026, cites 2025, so we ask which edition governs before plans are drawn. The Chapter 15 exemption list names painting, tiling, carpeting, cabinets, counter tops, wood fences under six feet, masonry fences under five feet, retaining walls to four feet and driveways to 30 inches above grade, but it is silent on roofing, window replacement and decks. We do not call those jobs exempt, and we do not call them permitted; we describe each to the counter before ordering materials. Exemptions never authorize work that breaks another code.
Compton's overlays are administrative, not historic: the City lists five landmarks and we found no historic district program. Design review before the Architectural Review Board instead follows 13 named thoroughfares, among them Alameda Street, Compton Boulevard and Long Beach Boulevard, where fences, yard improvements, additions and exterior house painting fall under the Uniform Paint Ordinance. Elsewhere the zoning code sets a fence limit of 3 1/2 feet, open in the front yard and solid across residential rear yards, and requires at least four inches of Portland cement concrete on every residential driveway, which sends any concrete company to the Street Superintendent for work in the right-of-way. Uncovered porches and landings may project six feet into a front or rear yard, a point that shapes every deck, and the R-A zone around Richland Farms allows an ADU up to 1,200 square feet on a conforming lot, so flooring for a converted garage is a different job from an old slab bungalow. Under the ground, the Housing Element places the Newport-Inglewood Fault Zone in the southwest corner between Central Avenue and Avalon Boulevard, and 30 of 42 sample points we checked fell in the State's liquefaction layer, so verify each parcel. NOAA's Hawthorne station, about 6.4 miles away, records 11.77 inches of rain a year, about 81 percent of it from December through March. MDG Builders is the general contractor of record: we scope the job, prepare the permit package, schedule licensed specialty subcontractors and walk the finished work with you, and their license numbers and certificates of insurance are yours to request. Neighboring work often crosses boundaries, so see our hubs for Downey, Long Beach and Los Angeles, and read how general contractors use subcontractors before you sign.

- Compton incorporated on May 11, 1888 as the eighth city in Los Angeles County.
- About half of Compton's homes were built from 1940 to 1959, per the Housing Element.
- The presale inspection under Form B-004 costs $129 for a single-family home and stays valid for six months.
- The Uniform Paint Ordinance covers exterior paint on 13 named thoroughfares.
- A Compton permit is invalid if work stays stopped for 180 days after it starts.
- Construction noise is limited to 7:00 a.m. through 7:00 p.m. Monday through Saturday.
Cities near Compton we also build in
Hiring a general contractor for a Compton home: questions we hear
Does a Compton remodel need a licensed contractor?
Almost always. California treats work above $1,000 in labor and materials combined as licensed-contractor work, and that allowance disappears once any building permit is required. Compton also asks contractors for a state license card and a City business license when they apply for permits, so a licensed general contractor is the practical route.
How do I get a building permit in Compton?
Apply through Building and Safety, (310) 605-5509, using the Citizen Serve portal. Only a contractor or broker with an active City business license can apply online, and owner-builders sign in person with a deed and photo ID. The department lists Monday through Thursday hours, 7:00 a.m. to 6:00 p.m., with none shown for Friday.
How much does a building permit cost in Compton?
We could not find a Compton building permit fee schedule, so we cannot give you a number. The City's Planning fee schedule is public and lists $770 for design review of residential additions, patio covers and garages, and $104 for administrative approval of items such as fencing. Ask the counter for building fees.
Which building code edition does Compton use?
That depends on the document, and we confirm it job by job. Chapter 15, adopted in October 2021, adopts the 2019 California codes by reference. The City's residential plan check form lists 2022 editions, and its ADU form, revised in January 2026, cites the 2025 codes, so ask plan check which governs your permit.
Which Compton projects skip a building permit?
Finish work such as painting, tiling, carpeting, cabinets and counter tops, per Chapter 15, plus wood fences under six feet, masonry fences under five feet and retaining walls up to four feet. The list never mentions roofing, window replacement or decks, and exemptions never excuse a code violation, so confirm those with the department.
What is Compton's presale inspection and who pays for it?
It is the Report of Residential Building Records that the City requires before a home is sold or exchanged. Form B-004 lists $129 for a single-family home, valid six months. The City checks every room, closet, garage and shed, and a buyer can sign a notarized AS-IS release instead of the seller correcting violations.
Do I need approval to repaint my Compton house?
Only on the 13 streets the Uniform Paint Ordinance names, such as Alameda Street, Central Avenue and Willowbrook Avenue. There the color and materials schedule goes to the Architectural Review Board before painting. The code waives the fee for homes of two units or less, but the Planning form lists $559, so call (310) 605-5532.
Can I build an ADU on a Compton lot?
Yes, in every residential zone. Under Ordinance 2341, a detached new ADU can reach 800 square feet and 16 feet high with four-foot side and rear setbacks on the by-right track, needing only a building permit and no hearing, and the City must act within 60 days of a complete application. Garage conversions need no setback.
Tell us about your Compton address
Send the street address and a few lines about the job. Before we call, we check whether the lot sits on a paint ordinance street, in the R-A zone or in a mapped liquefaction area, then explain which City reviews your scope may meet.