Fence Companyin Cudahy, CA
A fence company in Cudahy builds to the zoning code: front and street-side fences stop at 42 inches, interior side and rear fences reach 8 feet, and chain link is banned where the street can see it. We could not confirm the permit steps for an ordinary fence, so ask Planning before ordering materials.

Cudahy's fences mark very small lots. The city spans just over one square mile and is the second most densely populated in California, according to its 2021 Housing Element draft, with residential neighborhoods covering about 394 acres. The Census Bureau's 2024 estimates count 2,788 detached houses, 713 attached ones and 1,554 units in buildings of five or more. The oldest lots were long strips, typically 50 to 100 feet wide and 600 to 800 feet deep, and Wikipedia says the one-acre size let buyers keep gardens, citrus and chickens.
That mix shapes fence work: one backyard line, a front gate under a 42 inch limit, or a masonry wall along an apartment lot. On a fence job, MDG Builders (CSLB #1040337) measures the lot, asks Planning which review applies and schedules the crews, while licensed subcontractors build, a C-13 fencing contractor for wood, vinyl and metal and a masonry contractor for block. Our fencing page holds the sourced prices, the Cudahy overview covers the other trades, and the neighbors set their own limits, as the guides for Bell Gardens and Huntington Park show.
What Cudahy's zoning code says about fences and walls
Where fencing permits come from in Cudahy: City of Cudahy Community Development Department, Building Division and Planning Division.
- Under 20.16.120 in every Cudahy residential zone, a decorative fence, masonry wall or hedge in the front yard, or in a side or rear yard abutting a street, may not exceed 42 inches, wrought iron fences may reach 48 inches, and pilasters must be at least eight feet apart. In interior side and rear yards fences, walls and hedges may not exceed 96 inches (eight feet).
- Cudahy's 20.16.120 bans chain link (including wire or steel mesh) in the front yard and in side or rear yards abutting a street, defines a decorative fence as one with 80 percent visibility through it when viewed from the center of the adjacent street, and prohibits barbed or razor wire, broken glass or other sharp material, and corrugated metal or plastic. The section does not apply to fences required for public safety, environmental mitigation or by state or federal law.
- A barrier up to 96 inches tall within five feet of a street or highway needs the director's approval (20.16.120(D)); the section's text does not state a permit requirement for ordinary fences within the height limits, while the development review table in 20.84.180 lists fences and walls with height thresholds, so ask Planning which review a given fence needs.
- Near street intersections, no Cudahy fence or wall may exceed 36 inches above street grade inside the clear cross-visibility triangle, whose two sides are each 15 feet along the curb lines (20.56.090).
- Cudahy requires fences and walls to be maintained free of graffiti and not sagging, broken or rotted (20.56.030(C)). On a lot with six or more dwelling units, 20.16.040(G)(2) requires a masonry wall at least six feet tall along the entire length of the side and rear property lines.
- The state list of permit-exempt work (Residential Code R105.2, 2025 edition, as excerpted by the City of Albany) exempts fences not over 7 feet high and retaining walls not over 4 feet measured from the bottom of the footing to the top of the wall unless they support a surcharge. Zoning review in Cudahy still applies.
- Under California Civil Code 841, adjoining owners are presumed to share equally in the reasonable cost of building, maintaining or replacing a fence that divides their properties unless they agreed otherwise in writing. An owner who plans such costs must give each affected neighbor at least 30 days' prior written notice stating the presumption, the problem, the proposed fix, estimated costs, cost-sharing proposal and timeline.
- CSLB defines the C-13 Fencing classification as constructing, erecting, altering or repairing all types of fences, corrals, runs, railings and gates, and it excludes masonry walls.

How tall can a fence be in a Cudahy front, side or back yard?
Section 20.16.120 sets the limits for every residential zone, and they depend on where the fence stands, not on the zone:
Pilasters on a wall must be at least eight feet apart, and hedges follow the same heights as fences. A barrier up to 96 inches tall within five feet of a street needs the Director's approval under 20.16.120(D). The code text comes from the GoCodebook mirror because the City's municipal code host refused our tools, so confirm the numbers with Planning.
Pools follow their own law. California Health and Safety Code 115922 requires at least two of seven drowning-prevention features when a permit is issued for a new or remodeled pool, and the enclosure must meet section 115923, which we did not read. The zoning section above does not apply to fences required by state law.
- Front yard, and a side or rear yard that abuts a street: 42 inches for a decorative fence, masonry wall or hedge
- Wrought iron in those yards: 48 inches
- Interior side and rear yards: 96 inches, which is eight feet
Check which yard is which before you measure: on a corner lot, one side yard counts as a street yard.

Do I need a permit to build a fence in Cudahy?
Start with zoning, and ask about the building side. Section 20.84.240 bars any building permit or business license until a zoning clearance is issued, and the development review table in 20.84.180 lists fences and walls with height thresholds among the project types it sorts into review levels. The posted table is flattened, so we cannot say which column an ordinary 6 foot backyard fence lands in, and the text of 20.16.120 states no permit requirement for fences within the limits.
The building code is a separate question. The state's model list exempts fences not over 7 feet and retaining walls not over 4 feet, measured from the bottom of the footing, unless they hold a surcharge. An exemption never overrides zoning, and we did not read Cudahy's County-amended text. The City's permit page refused our tools, so we link it without quoting it.
Ask Planning three things and keep the answers in writing: does this fence need a review permit, is a zoning clearance enough, and does the 96 inch approval apply to a barrier near the street?

Is chain link allowed in a Cudahy front yard, and what counts as decorative?
No, chain link is banned. Section 20.16.120 prohibits chain link, including wire or steel mesh, in the front yard and in side or rear yards abutting a street. It also prohibits barbed or razor wire, broken glass and other sharp material, and corrugated metal or plastic.
A fence in those yards must be decorative, which the code defines as 80 percent visible through it when viewed from the center of the adjacent street. That points to wrought iron or tubular steel with open pickets, not a solid wood panel. The section does not apply to fences required for public safety, environmental mitigation or state or federal law.
Gates and paving matter too. Hardscape, including a driveway or walkway, may cover no more than 40 percent of the front setback under 20.56.110(C)(1), and the code asks for decorative concrete paving along any driveway longer than 20 feet. Plan the gate, the walk and the fence line together so they fit one front yard.

What do corner lots and apartment lots in Cudahy have to follow?
Corner lots add a sight line. Under 20.56.090, no fence or wall may exceed 36 inches above street grade inside the clear cross-visibility triangle, whose two sides are each 15 feet long along the curb lines. A 6 foot fence that is fine in a back yard may have to stop short of the corner or step down.
Apartment lots add a wall. On a lot with six or more dwelling units, 20.16.040(G)(2) requires a masonry wall at least six feet tall along the entire length of the side and rear property lines. With 1,554 of the city's 5,925 units in buildings of five or more, and 85.8 percent of occupied homes rented, many fences here belong to a landlord or an owners' association, which must register with the city every year under Chapter 15.28.
Upkeep is regulated. Section 20.56.030(C) requires fences and walls to be kept free of graffiti and not sagging, broken or rotted, so a repair is sometimes a code matter. At sale, the City's real property report records whether any structure is nonconforming or illegal, so a wall built without the right clearance can show up there. Mobile homes are about 7 percent of Cudahy's units, 439 by the Census count, and we found no park-level fence rules, so ask the City and the park's management before planning a fence inside one.

What goes in the ground: footings, termites and sandy soil in Cudahy?
The 2021 Housing Element draft says Cudahy lies in an area subject to liquefaction hazards, and that many parts of the Los Angeles Basin have sandy soils that liquefy. It writes about buildings, not fences, and we found no Cudahy rule on post depth. Even so, a tall solid fence and a block wall both depend on their footings, so ask the fence company how deep the posts go, what holds them and where water drains from the base.
Wood meets another problem at ground level. The University of California's integrated pest management program says drywood termites are most prevalent in southern California and infest decks and fences, and it advises termite-resistant wood or concrete footers where wood meets soil. Ask the proposal to say what material touches the ground.
The same draft says no known earthquake faults cross the city and that a levee wall protects it from the Los Angeles River, so the ground question here is soil, not slope.

How much does fence installation cost in Cudahy, and who pays for a shared fence?
No Cudahy price survey turned up, so we use Los Angeles sources. Angi's August 4, 2026 page for the city shows $15 to $60 per linear foot, with $2,100 to $2,350 for 100 feet, and HomeGuide, Thumbtack and Fixr give overlapping ranges. A federal wage survey puts the area's fence erector at a mean $28.00 an hour in May 2025. From those we plan about $25 to $55 per foot installed for a 6 foot wood or vinyl privacy fence and $35 to $85 for aluminum or ornamental iron. We print no block wall price, because we found no independent source for one that we trust.
For a boundary fence, California Civil Code 841 presumes that adjoining owners share the reasonable cost equally unless they agreed otherwise in writing, and an owner planning such costs must give each neighbor at least 30 days' written notice. CSLB's C-13 class excludes masonry walls, so block belongs to a masonry contractor; our license checking guide shows the lookup, and how general contractors use subcontractors explains who answers for what.
Old fence removal runs $3 to $5 a foot and gates $150 to $2,000 on Angi's national page, updated October 13, 2026, so ask for each as its own line. We found no Cudahy fee table, so the permit cost is a question for the City.

Fence photos from Cudahy and nearby communities
Six fencing scenes tied to Cudahy blocks and to nearby places such as Bell, South Gate, Bell Gardens and Huntington Park, from open iron fronts to solid backyard runs and block walls.



Where these Cudahy fence figures come from
Each fence price and its source is in the table on our fencing price page. A fence often goes up with other work, and the Cudahy rules for it are on the roofing page, the painting page and the kitchen remodeling page. For nearby cities with different limits, read the fencing guides for Bell and South Gate.
| What it covers | Typical range |
|---|---|
| Wood or vinyl privacy fence, 6 feet | $25 to $55 per linear foot |
| Chain-link | $12 to $30 per linear foot |
| Aluminum or ornamental iron | $35 to $85 per linear foot |
| Typical 100-foot backyard run | $2,500 to $5,500 total |
| Block walls, horizontal slat fences, gates and openers, hillside lots | Set by the written proposal |
Cudahy fence questions, answered
How much does 200 ft of fencing cost?
About $5,000 to $11,000 for 200 feet of 6 foot wood or vinyl privacy fence, which is our $25 to $55 per foot Los Angeles range doubled. Angi's Los Angeles page shows $2,100 to $2,350 for 100 feet, so a low case is nearer $4,200 to $4,700. Gates, old fence removal and slopes change the number, and a written proposal is the real price.
Do I need a permit to build a fence in Cudahy?
Ask Planning, because the posted code leaves it open. Zoning clearance is required before any building permit under 20.84.240, and the review table in 20.84.180 lists fences and walls with height thresholds, but the text of 20.16.120 states no permit rule. The state's model list exempts fences not over 7 feet, and zoning still applies.
What are the new fence rules in California in 2026?
We could not verify a statewide fence rule change that we can cite, so we will not name one. What governs a Cudahy fence is local: the 42 inch front limit, the 8 foot side and rear limit, the chain link ban and the review steps in the zoning code. Confirm any 2026 change with Planning.
Can I put up a 7ft fence?
In an interior side or rear yard, yes, because Cudahy allows up to 96 inches, which is 8 feet. In the front yard, or a side or rear yard that abuts a street, the limit is 42 inches, or 48 for wrought iron. The state's building exemption for fences up to 7 feet does not override these zoning heights.
Does your neighbor have to pay for half the fence in California?
Often in part, but not automatically. Civil Code 841 presumes adjoining owners share equally the reasonable cost of a fence that divides their properties, and an owner who plans to build must give written notice at least 30 days ahead. Because the presumption can be overcome, agree on the split with your neighbor in writing.
What if I don't get a permit to build a fence?
The City can treat it as a violation. Cudahy's building code makes violating the adopted code or a permit a misdemeanor, with a fine of up to $1,000, up to six months in jail or both, and each day a separate offense. We did not find the zoning penalty, so ask Planning. An unapproved wall can also surface in the pre-sale report.
What is the cheapest fence to install?
Chain link is usually cheapest, but Cudahy bans it in front yards and in yards that abut a street. Angi's national page, updated October 13, 2026, shows $10 to $45 per foot for wood, $15 to $40 for vinyl and $8 to $40 for chain link, so the ranges overlap. In a Cudahy front yard, plan on open iron.
What is the best time to install a fence?
A dry month is the practical answer, because rain complicates digging and concrete work. NOAA's downtown Los Angeles normals show 11.64 of the 14.25 yearly inches falling from December through March, with July and August nearly dry. We found no sourced price pattern by season.
How much do fencing contractors cost?
A federal survey puts the Los Angeles area's fence erector at a mean $28.00 an hour for May 2025, but that is a wage, not a billing rate. Contractors usually quote per linear foot instead, about $25 to $55 for a 6 foot wood or vinyl fence in our synthesis of Angi, HomeGuide, Thumbtack and Fixr.
Can I put a chain link fence in my Cudahy backyard?
In an interior side or rear yard, the posted code's chain link ban does not reach it, because the ban covers the front yard and side or rear yards abutting a street. On a corner lot, one side yard counts as a street yard and the ban applies. Confirm the yard type with Planning before ordering.
Get a fence plan for your Cudahy lot
Give us the street, the yard the fence will stand in and whether the lot is a corner. Before we call back, we check the height limits, the chain link ban and the review steps.