Tarzana, CA · Serving Southern CaliforniaCSLB #1040337 · (888) 666-8224
Kitchen Remodeling in Beverly Hills

Kitchen Remodelingin Beverly Hills, CA

Quick answer

Kitchen remodeling in Beverly Hills needs a licensed contractor for any project valued at $1,000 or more, and the Permit Center lists kitchen remodels among its Building & Safety counter jobs. We could not read the City's permit exemption list, so ask before treating any kitchen job as permit-free. Condos and rentals add HOA and tenant paperwork.

CSLB #1040337 5.0 on Houzz Free written estimate
Finished bright kitchen in a California home: white shaker cabinets, quartz island with waterfall edge, kitchen remodeling in Beverly Hills City Hall, Beverly Hills
CSLB #1040337Verified at CSLB
5.0 on HouzzRated by clients
Written proposalsScope and price in writing
Licensed specialistsSubcontractors do the work

Beverly Hills is a city of apartments and condos as much as estates. The Census Bureau's 2020 to 2024 estimates count 16,552 housing units, only about 37 percent of them single-family detached homes, with 52 percent in buildings of five or more units and 59 percent of occupied units rented at a median gross rent of $2,830. The median year built is 1958, and 4,715 units date from 1939 or earlier. Median home value is reported only as $2,000,001, a Census top code, so the true number is higher. A kitchen here is as likely to sit in a 1920s courtyard building as in a house.

MDG Builders (CSLB #1040337) runs a remodel as the general contractor: we draw the plan, carry the paperwork to the City and keep the calendar, while licensed electricians, plumbers, cabinet installers and stone fabricators work in the room. Costs and the build sequence are on our kitchen remodeling page, the Beverly Hills overview lists every trade, and nearby cities route kitchens differently, as the guides for West Hollywood and Santa Monica show.

Kitchen Remodeling rules in Beverly Hills

What the Beverly Hills Permit Center and building code say about kitchens

Where kitchen remodeling permits come from in Beverly Hills: City of Beverly Hills Community Development Department, Building & Safety (Permit Center).

  • The City's Permit Center guide lists kitchen and bathroom remodels, interior minor remodels of single-family homes with no structural work, plumbing repair and electrical panel upgrades under 400 amps as Building & Safety walk-in or appointment items, and says larger projects start with a pre-application consultation to discuss valuation, submittal requirements and documents before electronic plan review (July 2023 edition).
  • Owner-builder permits in Beverly Hills cover owner-occupied single-family homes and only interior work in owner-occupied condos, and a licensed contractor is required for any job valued at $1,000 or more, so most remodel jobs here run through a licensed contractor.
Sources for these rules
  1. beverlyhills.org: Permit Center Plan Review and Permitting Guide PDF
  2. beverlyhills.org: Development Services
A wooden table with rolled blank drawings, a clipboard, kitchen remodeling near Beverly Hills in Holmby Hills
Permits

Do I need a permit for a kitchen remodel in Beverly Hills?

Plan on one. Municipal Code 9-1-107 requires a permit from the building official before regulated work starts, and the City's Permit Center guide lists kitchen and bathroom remodels among the jobs handled at the Building & Safety walk-in or appointment counter, with larger projects starting at a pre-application consultation about valuation and submittals. We could not read the exemption list in 9-1-107(B), so we call no kitchen job permit-free, not even cabinets and counters. The guide we read is the July 2023 edition, because the current PDF is an image with no readable text.

A licensed contractor is required for any project valued at $1,000 or more, and owner-builder permits cover owner-occupied single-family homes and, for interior work only, owner-occupied condos. General contractors also pay a business tax registration fee of 0.2125 percent of project valuation when the permit issues, which the City says covers their subcontractors. Plan review and permit fees depend on valuation and are worked out at an appointment, so we print none.

A building permit is valid for 365 days from issue, and the expiration moves out 180 days after each successful inspection.

A kitchen gutted to the studs: new wall framing, rough plumbing lines and electrical boxes visible, kitchen remodeling in Beverly Gardens Park, Beverly Hills
Paperwork

What does the Beverly Hills Permit Center want with a kitchen application?

The July 2023 guide lists the documents for a Building & Safety application: the Plan Review and Permit Application, three sets of plans, a contractor authorization letter, an HOA authorization letter signed by the HOA president where an HOA exists, a Means and Method Plan where it applies, structural calculations, Title 24 energy documents and a Sound Transmission Class (STC) rating. It does not say which kitchen jobs trigger the STC rating, so ask the counter, especially for a condo.

The City's FAQ says the 2025 California Building, Residential, Green Building, Existing Building, Mechanical, Electrical, Plumbing, Energy, Fire and Wildland-Urban Interface codes took effect on January 1, 2026 with City amendments, so plans drawn to older editions need updating. An approved plan check application stays valid for 545 days from fee payment, and status questions go to the assigned plan checker or CDPlanReview@beverlyhills.org. Inspections for private-property permits are booked up to ten days ahead through the CitySmart portal, with a few next-day slots released at 9 AM each weekday.

Close detail of custom kitchen cabinetry: inset shaker doors, soft-close drawers, brass pulls, kitchen remodeling near Beverly Hills in Beverly Grove
Condos and rentals

How do I remodel a kitchen in a Beverly Hills condo or rental?

Start with who has to say yes. Renters occupy 59 percent of occupied units and 52 percent of all units are in buildings of five or more units, so many kitchen jobs here sit in someone else's building or under an association. A tenant-occupied property needs a Means and Method Plan when construction could affect a unit's habitability for more than one day, and it goes to the Rent Stabilization Ordinance Division before the permit issues. Owner-builder permits for condos cover interior work only.

Sound is a separate question. The STC rating appears on the City's document list, but the guide does not say which jobs trigger it, so ask the counter and ask the HOA for its own rules on flooring, noise and elevator use. The City allows construction Monday through Friday, 8 AM to 6 PM, and not on holidays, and a building manager may set shorter hours.

Get the HOA letter and the tenant plan answered before the cabinets are ordered.

A small bright rental apartment kitchen freshly updated with white shaker cabinets, kitchen remodeling in Rodeo Drive, Beverly Hills
Older kitchens

What hides in a pre-1950 Beverly Hills kitchen?

Wiring, pipes and paint from several decades. The Census counts 4,715 units from 1939 or earlier, 1,561 from the 1940s and 2,529 from the 1950s, with 79 percent of all units built before 1980. The city's first house went up in 1907 and Greystone in 1928, so some kitchens are older than the codes that now govern them. We found no Beverly Hills survey of kitchen wiring or pipes, so we give no share, only the counts.

Lead is the federal item to plan for. EPA's lead-safe rule covers paid work that disturbs paint in homes built before 1978, which can include demolition and wall openings, so ask for the firm's certification before the walls open. Put these questions on paper too:

  • Who pays, and how much, if the panel cannot carry the new kitchen?
  • Are gas and water shutoffs replaced or reused?
  • What happens to the schedule if the open wall shows rot or mold?
A 1950s California kitchen during demolition with a wall opened to bare studs showing old cloth-covered w, kitchen remodeling near Beverly Hills in Century City
Walls and additions

Can I move a wall or enlarge a kitchen on a Central Area or Hillside lot?

Moving a wall inside is a framing question, and growing the house is a review question. The City's Design Review page sends Central Area additions and facade remodels that show from the street to one of two tracks. Track 1 is staff review, open when a California-licensed architect designed the project in a pure architectural style under the Single-Family Style Guide, and Track 2 goes to the Commission. Neither Trousdale Estates nor the Hillside Area has Design Review.

The July 2023 guide puts Hillside Area additions and remodels of single-family homes in its Complex and Large electronic review group, while additions and remodels on a level pad fall in the intermediate group. A kitchen that stays inside the walls is a different job, so ask which group yours is in. In the Hillside Area, combined cut and fill is limited to 1,000 cubic yards plus one-tenth of the site area over five years (10-3-2521), and the volume counts foundation work, which matters if a bump-out needs footings.

A 1950s California ranch house kitchen opened to the dining room after a wall was removed, kitchen remodeling in Trousdale Estates, Beverly Hills
Job site and energy

What else governs a kitchen remodel in Beverly Hills: work hours, dumpsters and Title 24?

Crews may work Monday through Friday, 8 AM to 6 PM, and not on holidays, per the City's FAQ, and workers may not enter the site before 8 AM. Municipal Code 5-1-205 also bars permit-required work all day Sunday and, inside or within 500 feet of a residential zone, on Saturdays, unless the building official issues an after-hours permit. A dumpster, crane or barricade in the public right-of-way needs a Public Right-of-Way Use permit, while loading on private property needs none.

The energy paperwork follows the 2025 code. The Energy Commission's residential summary asks for local exhaust in kitchens, field checks of range hood airflow and sound, wall dimmers on kitchen lighting except lighting built into the hood, and separate controls for under-cabinet lights. We did not read which items reach an alteration instead of new construction, so ask the plan checker before you buy the hood or the lighting.

Settle the hood and lighting choices before plan check, not after it.

Range wall of a kitchen: stainless gas range, plaster range hood, zellige tile backsplash, kitchen remodeling near Beverly Hills in West Hollywood
Cost

How much does a kitchen renovation cost in Beverly Hills, and who should I hire?

We found no Beverly Hills kitchen survey, so we use Los Angeles figures. Remodeling magazine's Cost vs. Value 2025 report for Los Angeles prices a minor midrange kitchen at $29,765, a major midrange kitchen at $86,214 and a major upscale kitchen at $171,369. Thumbtack's Los Angeles page, updated July 13, 2026, puts typical jobs at $12,471 to $40,909 including small ones, and the Houzz 2026 study of 10,176 homeowners nationwide reports a $24,000 median. Our working tiers are about $25,000 to $45,000 for a same-layout refresh, $45,000 to $90,000 for a full remodel with new cabinets, counters and appliances, and $90,000 to $170,000 or more for upscale work or a new layout. These are Los Angeles tiers, not a Beverly Hills average.

A kitchen draws on several CSLB classes: cabinet and finish carpentry (C-6), plumbing (C-36), electrical (C-10), tile (C-54) and drywall (C-9). Our kitchen remodel cost guide explains why the surveys disagree, and the Los Angeles kitchen permit guide shows the sequence in a neighboring jurisdiction. Look up each trade's number with our contractor license guide, and ask each one for a certificate of insurance before work starts.

Kitchen island with three counter stools and pendant lights, kitchen remodeling in Greystone Mansion, Beverly Hills
Recent work

Kitchen photos from Beverly Hills and nearby communities

Seven kitchen scenes tied to Beverly Hills homes and condos and to nearby places such as Holmby Hills, Century City and West Hollywood, from opened walls and framing to finished cabinets and counters.

Range wall of a kitchen: stainless gas range, plaster range hood, zellige tile backsplash, kitchen remodeling near Beverly Hills in West Hollywood
Kitchen island with three counter stools and pendant lights, kitchen remodeling in Greystone Mansion, Beverly Hills
A historic California Craftsman bungalow kitchen with original wood windows, kitchen remodeling near Beverly Hills in Westwood
Cost

Where these Beverly Hills kitchen figures come from

Each tier's sources and dates are in the table on our kitchen remodeling price page. A kitchen often comes with other work, and the Beverly Hills rules for it are on the roofing page, the fencing page and the painting page. For cities that route kitchens differently, read the guides for Los Angeles and Culver City.

Kitchen Remodeling price ranges used for Beverly Hills estimates (Southern California sources, before permits)
What it coversTypical range
Refresh in the same layout: new counters, sink, lighting, hardware, paint and limited cabinet work$25,000 to $45,000
Full remodel in the same layout: new cabinets, counters, appliances, flooring and lighting$45,000 to $90,000
Upscale remodel or layout change: custom cabinets, premium appliances, a moved wall, relocated plumbing or gas$90,000 to $170,000 and up
FAQ

Beverly Hills kitchen remodeling questions, answered

Do I need a permit for a kitchen renovation in Beverly Hills?

Plan on yes. The Permit Center guide lists kitchen and bathroom remodels among its Building & Safety counter jobs, and we could not read the code's exemption list in Municipal Code 9-1-107(B). A licensed contractor is required for any project valued at $1,000 or more. Describe the scope to the counter and get the answer in writing.

Do I need building permits for changing kitchen cabinets and countertops?

We cannot confirm that you do not. The City's exemption list sat on a host that blocked our tools, so we call no kitchen job permit-free. Moving plumbing, gas or electrical lines is not finish work in any case. Ask the Permit Center about your exact scope before the cabinets are ordered.

Does adding a sink and stove to a room require a permit?

Expect yes. The Permit Center guide lists plumbing repair and electrical panel upgrades under 400 amps as counter items, and new plumbing, gas and electrical lines are permit work in practice. A new kitchen in a room that was not one is also a zoning question, so tell the counter what the room will become.

How much is a kitchen remodel permit in Beverly Hills?

We could not find a figure. The City says plan review and permit fees depend on project valuation and need an appointment to work out. General contractors also pay a business tax registration of 0.2125 percent of valuation when the permit issues. Ask for the fee on your scope before you sign a proposal.

What is a realistic budget for a kitchen remodel in Beverly Hills?

Think in three Los Angeles tiers: about $25,000 to $45,000 for a same-layout refresh, $45,000 to $90,000 for a full remodel, and $90,000 to $170,000 or more for upscale work or a new layout. We found no Beverly Hills survey, so a written proposal is the real price.

Can you remodel a kitchen for under $30,000?

Sometimes, with the same layout and modest finishes. Cost vs. Value 2025 lists a Los Angeles minor midrange kitchen at $29,765, while Thumbtack's Los Angeles range starts near $12,471 but counts small jobs as well. An aging panel, a moved wall or lead-safe work can push a job past $30,000.

How long will a kitchen remodel take in Beverly Hills?

We print no single number, because it depends on the permit path and the scope. Inspections are booked up to ten days ahead, a permit is valid for 365 days and the City's plan review depends on project size. Ask the proposal for dates tied to permit, rough-in inspection and cabinet lead time.

Will Title 24 apply to my kitchen project?

In part, most likely. The City lists Title 24 energy documents among its application documents, and the state's 2025 residential measures, in force since January 1, 2026, cover kitchen exhaust, range hood airflow and sound checks and lighting controls. We did not read which items apply to an alteration, so ask the plan checker.

Do you have to pay a remodeling contractor upfront?

Only a small deposit. California caps a down payment at $1,000 or 10 percent of the contract price, whichever is less, and progress payments must follow work actually done. A contractor asking for more is a reason to pause. Written change orders and a lien release after each payment are part of the same rule.

Free estimate

Describe your Beverly Hills kitchen

Tell us whether the kitchen is in a house, condo or rental, which walls, gas lines or sinks might move and how old the building is. The first visit is built around the permit and tenant questions.

Free estimate · A real person answers · (888) 666-8224

Call (888) 666-8224