Tarzana, CA · Serving Southern CaliforniaCSLB #1040337 · (888) 666-8224
Windows in Beverly Hills

Window Replacementin Beverly Hills, CA

Quick answer

Window replacement in Beverly Hills is handled at the Building & Safety counter when it is like for like, but the City says vinyl windows are not approved at the staff level, so plan on fiberglass, aluminum clad, wood or steel. Central Area homes may also need Design Review if the work shows from the street. Confirm before you order.

CSLB #1040337 5.0 on Houzz Free written estimate
Living room with new large white vinyl windows and a sliding glass door, bright natural light, windows in Beverly Hills City Hall, Beverly Hills
CSLB #1040337Verified at CSLB
5.0 on HouzzRated by clients
Written proposalsScope and price in writing
Licensed specialistsSubcontractors do the work

Beverly Hills has been building houses since 1907, and the Census Bureau's 2024 five-year estimates show the result: 28.5 percent of its 16,552 homes date from 1939 or earlier, 79.0 percent predate 1980 and the median build year is 1958. Many of those homes still hold their first windows, and many of the windows face a street where the City reviews what changes. Rain is light at 17.73 inches a year at NOAA's UCLA station, the nearest normals station, but the same station averages 10.4 days a year above 90 F, so heat gain is a bigger question than rain.

This page covers the frame rule at the counter, what the permit application asks for, Design Review, historic homes, lead-safe work, fire zone glass and the install schedule. The City's code host blocked our tools, so we rely on the City's own Design Review pages and FAQs. Confirm each point with Building & Safety at the Permit Center. Prices and the phase list are on our windows page.

Windows rules in Beverly Hills

Beverly Hills Building & Safety and Planning rules that apply to window work

  • For single-family homes the City says window replacement needs Design Review only in the Central Area and only if the work affects an elevation visible from the street, while multifamily and commercial buildings need Architectural Review if any elevation is visible from a public right-of-way, including an alley.
  • Beverly Hills window permits can usually be approved at the public counter for a like-for-like material swap or a higher-quality material such as fiberglass, aluminum clad, wood or steel, and the City states that vinyl windows are not approved at the staff level. The application needs owner authorization, the manufacturer's spec sheet, installation details showing recess depth, an elevation drawing or photo, and egress details for bedroom windows.
  • The Permit Center guide lists 'Window Change Out (no change in size, non-structural)' as a Building & Safety walk-in item, and EPA's lead-safe rule always covers window replacement on pre-1978 housing regardless of how much paint is disturbed.
  • The Fire Department's home hardening page recommends dual-pane windows with one tempered pane and limiting the size and number of windows facing large vegetated areas.
Sources for these rules
  1. beverlyhills.org
  2. beverlyhills.org: Design Review
  3. beverlyhills.org: Permit Center Plan Review and Permitting Guide PDF
  4. beverlyhills.org: Home Hardening
A wooden table with a clipboard, a tape measure, windows near Beverly Hills in Holmby Hills
Frame rule

Replacement windows in Beverly Hills: which frames are approved at the counter, and why not vinyl?

The City says window permits can usually be approved at the public counter for a like-for-like material swap or for a higher-quality material such as fiberglass, aluminum clad, wood or steel, and it states that vinyl windows are not approved at the staff level. The summary we have gives no reason and does not say whether a vinyl request can go to a higher review, so ask the planner before you design around it.

The rule changes the budget. Most price guides for Los Angeles lead with vinyl, which the counter will not clear here. ConsumerAffairs' Los Angeles page, updated September 2026 and without a stated cost method, shows wood at $950 to $2,100 per window installed and fiberglass at $1,100 to $2,400. Remodeling magazine's 2025 Cost vs. Value report for Los Angeles lists wood at $27,913 against $23,783 for vinyl. A quote that assumes vinyl on a Beverly Hills house is the first thing to question.

Exterior of a white stucco house with black-framed windows, a wooden front door, succulents in the yard, windows in Beverly Gardens Park, Beverly Hills
Permit

Do you need a permit to replace windows in Beverly Hills, and what does the counter ask for?

Expect one. The Permit Center guide lists a window change-out with no change in size and no structural work as a Building & Safety walk-in item, and Municipal Code 9-1-107 requires a permit before regulated work starts. A counter listing says where a job is handled, not that it is exempt, and we could not read the exemption list in 9-1-107(B).

The application needs owner authorization, the manufacturer's spec sheet, installation details that show the recess depth, an elevation drawing or a photo, and egress details for bedroom windows. A licensed contractor is required for any project valued at $1,000 or more. Enlarging an opening, adding a window or moving a header is different from a change-out, and the City's guide does not say that it would go to the counter, so ask whether plans are needed.

Close-up of a new window frame set in a stucco wall opening with flashing tape sealed around the nailing , windows near Beverly Hills in Beverly Grove
Design Review

Window replacement and Design Review: street-visible work in the Central Area, houses and apartments

For single-family homes, the City says window replacement needs Design Review only in the Central Area and only if the work affects an elevation visible from the street. Trousdale Estates and the Hillside Area are not subject to Design Review. The three areas are Article 24, 25 and 26 of the Zoning Code, so confirm yours on the Zoning Map before you assume which applies.

Apartment and commercial buildings play by other rules. The City says multifamily and commercial buildings need Architectural Review if any elevation is visible from a public right-of-way, and that includes an alley. With about 52 percent of Beverly Hills units in buildings of five or more, an alley-facing window swap in a condo building can surprise an owner who expected a counter permit. An HOA letter signed by the HOA president is part of the application where an HOA exists.

Wide multi-panel sliding glass door open onto a patio with outdoor chairs, interior light wood floor, windows in Rodeo Drive, Beverly Hills
Historic homes

Old wood windows on a historic or master-architect house in Beverly Hills

The City's Design Review page warns that windows may be character-contributing on a building by a master architect or on a City historic survey, and that historic review may be required before permits issue. As of 2025, 45 properties sat on the Beverly Hills Register of Historic Properties, a program that began with the city's 2012 historic preservation ordinance, according to Wikipedia. Ask Planning whether the house is listed or surveyed before you order a single window.

Greystone Mansion and the Beverly Wilshire both opened in 1928 and Pickfair dates to 1921, a reminder that the older streets hold work from architects with names. The practical question for a homeowner is simple: can the existing wood sashes be repaired, or does the City want the new frames to match the old profile, depth and muntins. The spec sheet and recess-depth details the application asks for are how that comparison gets made.

The front of a historic California Craftsman bungalow with original restored wood double-hung windows, windows near Beverly Hills in Century City
Lead-safe rules

Lead-safe window replacement in a Beverly Hills home built before 1978

Window replacement is always covered by EPA's lead-safe rule in housing built before 1978, regardless of how much paint is disturbed, according to EPA's Renovation, Repair and Painting program. Anyone paid to do the work, sole proprietors included, must be certified and follow lead-safe practices. With 79.0 percent of Beverly Hills homes built before 1980 and a median build year of 1958, most window jobs here fall under it.

The exemption that lets small paint repairs skip the rule, 6 square feet or less per room indoors or 20 square feet or less outside, does not apply to window replacement. A firm that calls your job too small for certification is quoting the wrong rule, and the certificate is easy to ask for.

  • Is the firm EPA-certified for lead-safe work, and can it show the certificate?
  • How are old sashes removed, contained and hauled away?
  • What does the proposal say about cleanup and verification before the job closes?
Bedroom with two white double-hung windows, linen curtains, a bed with white bedding, soft morning light, windows in Trousdale Estates, Beverly Hills
Fire zone

Fire zone windows in Beverly Hills: dual-pane glass, tempered panes and frame choices

The Very High Fire Hazard Severity Zone covers the area north of Sunset Boulevard and a few blocks south of it, according to the City's FAQ, and a Courier report says CAL FIRE's March 2025 maps add about 260 acres. The Beverly Hills Fire Department's home hardening page, guidance and not a permit rule, recommends dual-pane windows with one tempered pane and fewer or smaller windows facing large vegetated areas.

The 2025 California codes, including the Wildland-Urban Interface Code, took effect in Beverly Hills on January 1, 2026 with City amendments. We did not read the section that sets window glazing, and whether a window-only replacement triggers it is not stated, so ask the Permit Center for your parcel. Metal frames and tempered glass cost more, and Angi's Los Angeles page puts tempered glass at $200 to $700 per window.

A hillside Los Angeles house with new dual-pane tempered glass windows in black frames, windows near Beverly Hills in West Hollywood
Schedule

Energy labels, tax credit status, lead times and install day for Beverly Hills windows

The Permit Center guide lists Title 24 energy documents among the papers for a Building & Safety application. Los Angeles requires NFRC-labeled dual glazing on replacements under Title 24, Part 6, section 150.2(b), according to LADBS, and city handouts disagree on U-factor and solar heat gain numbers, so we print none and ask for the label that fits your climate zone. The federal 25C home improvement credit is not allowed for property placed in service after December 31, 2025, according to the IRS.

Plan 4 to 8 weeks for the factory, then 1 to 3 days of installation for a 10 to 15 window house and 1 to 3 days of stucco and trim repair, as MDG planning ranges. Beverly Hills allows construction Monday through Friday, 8 AM to 6 PM, and not on holidays. As MDG Builders, CSLB #1040337, we measure, price, handle the permit and schedule the work, while licensed subcontractors install the glass. Ask each firm for a license number and certificate of insurance.

New windows in protective wrap leaning against the garage wall of a stucco house, ready for installation, windows in Greystone Mansion, Beverly Hills
Recent work

Window photos from Beverly Hills and nearby homes

Window scenes tied to Beverly Hills and the neighborhoods around it, from frames and glass to flashing and finished openings. Tap a photo to enlarge it.

A hillside Los Angeles house with new dual-pane tempered glass windows in black frames, windows near Beverly Hills in West Hollywood
New windows in protective wrap leaning against the garage wall of a stucco house, ready for installation, windows in Greystone Mansion, Beverly Hills
Macro detail of the corner of a double-pane insulated glass unit showing the spacer and two glass layers, windows near Beverly Hills in Westwood
Cost

What windows costs around Beverly Hills

The windows page values vinyl replacement at about $550 to $1,150 per window installed and a whole house of 10 to 15 windows at about $14,000 to $28,000, with wood and fiberglass costing more, and because the Beverly Hills counter bars vinyl, the wood and fiberglass rows are the closer guide here. Three Los Angeles sources bracket those figures. Remodeling magazine's 2025 Cost vs. Value job costs are $23,783 for vinyl and $27,913 for wood, recouping roughly 83.2 and 81.9 percent at resale. Angi's July 2026 average is $19,356, and ConsumerAffairs publishes no cost method. None is a Beverly Hills quote, and the Census reports Beverly Hills' median home value only as $2,000,001, so read the resale percentages as regional guides. The license check guide explains how to verify the firm. Nearby cities set their own rules, so compare window replacement in West Hollywood, Culver City, Santa Monica and Los Angeles. Windows in a new room go on our Beverly Hills room addition page, a bath window on the Beverly Hills bathroom page, a backyard unit on the Beverly Hills ADU page, and the Beverly Hills area page lists every trade we cover in the city.

Windows price ranges used for Beverly Hills estimates (Southern California sources, before permits)
What it coversTypical range
Vinyl window, installed, each$550 to $1,150
Wood or fiberglass window, installed, each$950 to $2,400
Whole house, 10 to 15 windows$14,000 to $28,000
Glass options, per windowDouble-pane $500 to $2,000.
low-E $300 to $1,100.
tempered $200 to $700.
Remodeling Cost vs. Value 2025, Los AngelesVinyl $23,783.
wood $27,913.
New or enlarged egress opening$3,200 to $6,500
FAQ

Beverly Hills window replacement questions, answered

Do I need a permit to replace windows in Beverly Hills?

Yes, plan on one. The Permit Center lists a window change-out with no size change and no structural work as a Building & Safety counter item, and the application needs the spec sheet, installation details and an elevation or photo. Central Area homes may also need Design Review if the work is visible from the street.

Which is better, fiberglass or vinyl windows, in Beverly Hills?

For approvals, fiberglass, because the City says vinyl windows are not approved at the staff level while fiberglass, aluminum clad, wood and steel can usually clear the counter. Fiberglass costs more, about $1,100 to $2,400 per window installed in ConsumerAffairs' Los Angeles figures, so compare quotes on the same frame material.

How much do replacement windows usually cost?

Wood runs about $950 to $2,100 and fiberglass about $1,100 to $2,400 per window installed, and a whole house of 10 to 15 windows runs roughly $14,000 to $28,000, according to ConsumerAffairs' Los Angeles page. Angi's July 2026 average is $19,356. None is a Beverly Hills quote, and a written proposal sets the real price.

How long does it take for new windows to be installed?

Installation takes 1 to 3 days for a typical 10 to 15 window house, but the factory takes 4 to 8 weeks first, and the permit and any Design Review come before the order. Stucco and trim repair adds another 1 to 3 days. These are MDG planning ranges, and the manufacturer's quoted date goes into the proposal.

Are double pane windows required in California?

Effectively yes for replacements. Los Angeles requires NFRC-labeled dual glazing under Title 24, Part 6, section 150.2(b), according to LADBS, and Beverly Hills asks for Title 24 documents with its applications. We did not read the adopted values, so ask which U-factor and solar heat gain label your climate zone needs.

Is replacing home windows worth it?

On resale, mostly yes. Remodeling magazine's 2025 report for Los Angeles shows about 83.2 percent of a vinyl job and 81.9 percent of a wood job recouped, and wood is the closer match for Beverly Hills. We print no energy-savings figure because we found no sourced one, and the federal 25C credit ended after 2025.

Do I need special fire-resistant windows in Beverly Hills?

Possibly, if the home is in the Very High Fire Hazard Severity Zone north of Sunset Boulevard and a few blocks south. The Fire Department recommends dual-pane windows with one tempered pane, but its page is guidance, not a code citation. Ask the Permit Center whether a window-only replacement on your parcel triggers a glazing rule.

What size egress window is required in a bedroom?

We could not read the code's egress dimensions, so we print none. What we know is that Beverly Hills asks for egress details on bedroom windows in the permit application. A new or larger opening is not a like-for-like swap and needs framing and a header, so confirm the opening size with the Permit Center first.

Do replacement windows need to be lead-safe in Beverly Hills?

Yes in any home built before 1978, because EPA's rule always covers window replacement there, however little paint is disturbed. The contractor must be EPA-certified and use lead-safe practices. About 79 percent of Beverly Hills homes were built before 1980, so ask for the certificate before you sign.

Free estimate

Tell us about your Beverly Hills windows

Tell us how many windows, which part of town the house is in, the year it was built and whether the front faces the street or an alley, and the first conversation will begin with what the City is likely to review.

Free estimate · A real person answers · (888) 666-8224

Call (888) 666-8224