Tarzana, CA · Serving Southern CaliforniaCSLB #1040337 · (888) 666-8224
Roofing in Long Beach

Roof Repairin Long Beach, CA

Quick answer

Roof repair in Long Beach needs no building permit for a coating or for roofing up to 100 square feet in 12 months, though two City pages disagree on that figure. Roof replacement can use an Express Permit outside historic districts and the Coastal Zone. Inside one of 18 districts, a Certificate of Appropriateness comes first, with no review fee.

CSLB #1040337 5.0 on Houzz Free written estimate
A modern California house with a dark standing-seam metal roof, white stucco walls and a blue sky, roofing in Downtown Long Beach, Long Beach
CSLB #1040337Verified at CSLB
5.0 on HouzzRated by clients
Written proposalsScope and price in writing
Licensed specialistsSubcontractors do the work

A Long Beach roof works through a mild year with one hard season. NOAA's 1991 to 2020 normals for the Daugherty Field station, about 2.5 miles from the city's center point, record 12.02 inches of rain a year, and roughly 81 percent of it falls from December through March. Summers stay cooler than inland, with an average August high of 83.2 degrees F and about 23 days a year at or above 90. That leaves a few storms that find every weak flashing and a long dry stretch when a roof can be opened safely.

Most of the roofs here sit on old buildings. The City's Housing Element says 71 percent of Long Beach housing is over 50 years old, against 61 percent across Los Angeles County, and the Census Bureau's ACS 2024 estimates put 51.0 percent of the city's 181,216 housing units before 1960. About 58.9 percent of households rent, so many roof decisions belong to landlords. On a roof job, MDG Builders (CSLB #1040337) writes the scope, deals with the Permit Center and any historic review, and keeps the calendar, while a licensed C-39 roofing subcontractor does the tear-off and installation. Our roofing page has the sourced price table, and the same questions get different answers in Los Angeles, Glendale and Pasadena.

Roofing rules in Long Beach

What Long Beach's Permit Center and Planning Bureau say about roofs

Where roofing permits come from in Long Beach: City of Long Beach Community Development Department.

  • The City's Do I Need A Permit page lists hot or cold roof paint as exempt from a building permit and lists roofing up to 100 square feet on an existing building in any 12-month period as exempt. The City's older permit FAQ lists roofing up to 500 square feet in 12 months as exempt, so the two City pages disagree and the Permit Center should confirm which applies.
  • The City's permit FAQ (item 3, parts d and e) says application of hot or cold paint or other roof coating is exempt from a building permit, and says application of roofing not in excess of 500 square feet on an existing building within any 12 month period is exempt. It also lists re-roofing as a simple project that licensed contractors may handle through an Internet Permitting Request.
  • Express Permit items B9 and B10 cover a re-roof with asphalt or fiberglass composition shingles over solid sheathing or at most one existing layer of composition shingles on solid sheathing with shingle weight of 6 psf or less, and a built-up roof of Class A or B material over solid sheathing or one existing layer, issued without plan review outside Coastal Zones and Historic Districts.
  • The City's asphalt shingle bulletin (IB-014, revised 12-06-2023, still citing the 2019 code sections) requires solid sheathing, allows shingles only on slopes of 2 in 12 or steeper, requires double underlayment from 2 in 12 up to 4 in 12, and calls for drip edge at eaves and rakes. A re-roof must remove all existing layers where the roof is water soaked, is slate, clay, cement or asbestos-cement tile, or already has two or more roof coverings.
  • Re-roofing a landmark or a property in a historic district requires City historic review for compatible colors and materials, and the City states there is no fee for historic review of re-roofing. A Re-Roofing COA application packet is posted.
Sources for these rules
  1. longbeach.gov: do i need a permit
  2. longbeach.gov: permits
  3. longbeach.gov: ib 058
  4. longbeach.gov: ib 014
  5. longbeach.gov: certificate
A wooden table with rolled blank drawings, a clipboard, roofing near Long Beach in Signal Hill
Historic districts

Can you re-roof a house in Belmont Heights, Bluff Park or another Long Beach historic district?

Long Beach lists 18 designated historic districts: Belmont Heights, Bluff Heights, Bluff Park, Brenner Place, California Heights, Carroll Park, Drake Park/Willmore City, Eliot Lane, Grant Neighborhood, Hellman Street Craftsman, Linden Avenue, Lowena Drive, Minerva Place, Rose Park, Rose Park South, Sunrise Boulevard, Wilton Street and the Wrigley Area.

On a landmark or inside any of those districts, the City's preservation page requires a Certificate of Appropriateness for exterior changes, re-roofing included, even when no building permit is needed. The review looks for compatible colors and materials, the City charges no fee for it, and a Re-Roofing application packet is posted. Interior work and ordinary maintenance with no exterior change need no historic review, so ask whether a like-for-like patch counts as maintenance before assuming it does.

The Express Permit Service cannot be used on a historic landmark or in a district, which puts the Certificate and a regular permit ahead of any shortcut. The Historic Preservation office answers at (562) 570-6194. We have not seen the City's district maps, so we cannot say which blocks fall inside the lines.

Switching from shingle to tile or the reverse is the change most likely to draw questions, so raise it with Historic Preservation before the quote is signed.

Barrel clay tile roof on a Spanish-style California house with white stucco walls and an arched entry, roofing in Belmont Shore, Long Beach
Permit path

Does Long Beach roof repair or roof replacement need a building permit?

The City's Do I Need A Permit page lists hot or cold roof coating as exempt and roofing up to 100 square feet on an existing building in any 12-month period as exempt. The older permit FAQ says 500 square feet. The two City pages disagree, and we could not open Municipal Code Chapter 18.04 to see which one controls, so call the Permit Center at 562.570.PMIT (7648) before treating a repair as exempt.

Past the exemption, Information Bulletin IB-058 describes the Express Permit Service, which issues a permit with no plan review for a re-roof with composition shingles over solid sheathing or over one existing layer of shingles weighing 6 pounds per square foot or less, and for a built-up roof of Class A or B material. The City also lists re-roofing as a simple project that licensed contractors can request online. The Express items do not apply in a Coastal Zone or historic district.

A permit stays valid for two years from issuance and lapses after 180 days if work never starts or stops for 180 consecutive days. Plan review, when a job needs it, costs 85 percent of the building permit fee, not less than $154, under the schedule that took effect October 1, 2026. We could not confirm whether roofing in the Coastal Zone needs a coastal permit, so ask.

A composition shingle roof replacement in progress: half the roof covered with new gray architectural shi, roofing near Long Beach in Wilmington
Under the shingles

What must a Long Beach re-roof include under the shingles?

The City's asphalt shingle bulletin, IB-014, revised December 6, 2023, sets the rules below the surface. It requires solid sheathing, allows shingles only on slopes of 2 in 12 or steeper and calls for double underlayment from 2 in 12 up to 4 in 12, with drip edge at eaves and rakes.

It also says when the old roof must come off entirely: where the roof is water soaked, is slate, clay, cement or asbestos-cement tile, or already carries two or more roof coverings. A roof that has leaked for years often turns into a full tear-off whatever the first quote assumed. The bulletin still cites 2019 code sections, and the City says the 2025 California Building Standards Code applies from January 1, 2026, so treat the bulletin as current City guidance and not as the code text.

A useful proposal lists:

  • How many layers are on the roof now, and whether the deck is solid sheathing
  • The underlayment type, doubled if the slope is under 4 in 12
  • Drip edge at the eaves and rakes
  • Flashing at valleys, walls, vents and pipe boots, each priced on its own line
Plywood roof decking covered with synthetic underlayment and drip edge, a ridge line against a clear sky, roofing in Naples, Long Beach
Wind and rain

How do Long Beach wind and winter rain change a roof job near the water?

The City's wind bulletin, IB-021, says Long Beach has no special wind regions and sets a basic wind speed of 95 mph. Most sites use Exposure B. Sites near the shoreline use Exposure D, defined as south of Ocean Boulevard with exceptions and east of 54th Place on both sides of Ocean Boulevard. Ask the roofer which category your address falls under, because exposure is the starting point for how a roof edge is fastened.

Rain decides the calendar. December through March brings 9.71 of the 12.02 yearly inches, so a roof opened in July faces little weather risk, while one opened in February needs tarps staged before the first nail comes out.

Roofing is loud, and the City's construction noise rule in IB-027 bars work before 7:00 a.m. or after 7:00 p.m. on weekdays, before 9:00 a.m. or after 6:00 p.m. on Saturdays, and on Sundays unless the Health Department issues a Sunday work permit. A violation is a misdemeanor with a fine of up to $500.

Roof eave with a new white fascia board, a seamless gutter, a drip edge and new gray shingles meeting it, roofing near Long Beach in Seal Beach
Old roofs

How old is the roof on a Long Beach house, and does it need repair or replacement?

The building boom is easy to date. Long Beach counted 55,593 people in 1920 and 142,032 in 1930, after oil came in during 1921, and 344,168 by 1960 as the Douglas Aircraft plant and the Navy shipyard, open from 1943 to 1997, filled the postwar suburbs. The ACS 2024 tables show 18.8 percent of today's units date from 1939 or earlier, 15.3 percent from the 1940s and 16.9 percent from the 1950s.

Few of those roofs are likely to be original. A 1925 house in California Heights or a 1950s tract house in a neighborhood the Bixby land companies laid out has probably been re-roofed at least once, and some have been covered several times, which is how a layer count of two or more happens. We found no sourced roof lifespan for Long Beach, so ask the inspector to photograph flashing, edge underlayment and any soft decking instead of quoting an age.

About 39.6 percent of units sit in buildings of five or more, so many roofs belong to owners who never see the attic. For a multiunit building, get the roof area and whether it is sloped or flat before comparing quotes, because the shingle bulletin covers only sloped asphalt shingle roofs.

Finished charcoal-gray shingle roof on a suburban two-story house with new gutters and a few solar panels, roofing in Belmont Heights, Long Beach
Cost

What does roof replacement cost in Long Beach, California?

We found no Long Beach price survey, so this page prints no Long Beach price. Los Angeles has two sourced references that measure different things. Angi's Los Angeles page, updated July 31, 2026, surveys what customers paid and shows a typical $10,256 to $24,963, an average of $17,271 and $8.60 per square foot. By material it gives asphalt at $4 to $12 per square foot, tile at $7 to $15 and metal at $7 to $16.

Remodeling magazine's 2025 Cost vs. Value report prices one fixed reference roof at $36,417 in asphalt and $62,069 in metal for Los Angeles, and it does not publish the roof's size, which is why it sits well above Angi's average. Angi adds tear-off at $1,000 to $3,000 and taking solar panels off and putting them back at $500 to $1,000.

Long Beach adds scope that neither source prices. Ask each bidder to show these as separate lines:

  • Extra layers that must come off under the City's existing-layer rule
  • Double underlayment on low slopes
  • Historic district materials, if the house is in one
  • Rotted decking, at an agreed price per sheet
Roofing material samples on a driveway: a gray shingle, roofing near Long Beach in Carson
Hiring

How do you choose a roofing company in Long Beach?

Roofing is CSLB class C-39, which covers installing roofing products and repairing surfaces that seal and waterproof a structure. Look up the number before you compare prices, using our guide to checking a contractor's license. The unlicensed limit is $1,000 since January 1, 2025, and it does not apply when a permit is needed, which a re-roof outside the exemptions will be.

Then read the contract. Business and Professions Code section 7159, as amended effective January 1, 2026, calls for a signed written contract before work, limits the down payment to $1,000 or 10 percent, whichever is less, ties progress payments to finished work and allows three business days to cancel, five for seniors. Our piece on how general contractors use subcontractors shows who answers for what, and the roofer's license number and certificate of insurance are fair requests on any job.

A ladder leaning against the eave of a stucco house with a clay tile roof and a closed clipboard hanging , roofing in Bixby Knolls, Long Beach
Recent work

Roof photos from Long Beach and nearby communities

Six roof scenes tied to Long Beach neighborhoods such as Belmont Heights and Bixby Knolls and to nearby communities like Signal Hill and Lakewood, showing tile, shingle and flashing work in coastal light.

Close detail of a clay tile roof where a few broken tiles have been replaced with matching new tiles, roofing near Long Beach in Los Alamitos
A composition shingle roof with a neat array of black solar panels, palm trees and a clear sky, roofing in California Heights, Long Beach
A low-slope flat roof freshly coated with a white reflective membrane, roofing near Long Beach in Lakewood
Cost

Where the Long Beach roof numbers come from

Every dollar figure above comes from Los Angeles sources, and the table on our roofing price page names each one with its date. Our roof cost guide for California walks through the gap between the Angi and Cost vs. Value figures. A new roof often comes with fence or paint work, and the Long Beach rules for those are on the fencing page and the painting page. The rest of our work in town is on the Long Beach overview.

Roofing price ranges used for Long Beach estimates (Southern California sources, before permits)
What it coversTypical range
Asphalt shingle, typical single-family roof$10,000 to $25,000
Concrete or clay tile$7 to $15 per sq ft
Metal$7 to $16 per sq ft
Remodeling Cost vs. Value 2025, Los AngelesAsphalt $36,417.
metal $62,069.
ExtrasTear-off $1,000 to $3,000.
solar detach and reset $500 to $1,000.
FAQ

Long Beach roofing questions, answered

Do I need a permit for roof repair or roof replacement in Long Beach?

Usually yes for replacement and no for small repairs. The City lists roof coating and roofing up to 100 square feet in 12 months as exempt, but its older FAQ says 500, so confirm with the Permit Center. A full re-roof can use an Express Permit outside historic districts and the Coastal Zone.

How much should a 2000 sq ft roof cost?

Price it by roof area, not house size, and expect a wide spread. Angi's July 2026 Los Angeles data gives $4 to $12 per square foot for asphalt, $7 to $15 for tile and $7 to $16 for metal. Long Beach has no published survey, so a measured, written proposal is the real number.

What is the 25% rule for roofing?

We found no California or Long Beach code section by that name, and the contractor sites that quote it rarely cite one. The rules we can document are the City's existing-layer limit, which forces a full tear-off at two or more coverings, and its exemption of roofing up to 100 square feet.

Can I change my roof material in a Long Beach historic district?

Only with approval. A Certificate of Appropriateness is required for exterior changes in any of the 18 districts, and the City reviews re-roofing for compatible colors and materials without charging a fee. Changing the covering type is the likeliest to raise questions, so apply before ordering anything.

What is the most expensive part of replacing a roof?

Usually the covering you pick. The Cost vs. Value 2025 reference roof for Los Angeles costs $36,417 in asphalt and $62,069 in metal. Tear-off at $1,000 to $3,000 and rotted decking found afterward come next, and Long Beach adds double underlayment on low slopes.

What is the cheapest month for roofing?

We found no sourced price pattern by month, so we will not name one. Weather does favor some months: NOAA's normals put 9.71 of Long Beach's 12.02 yearly inches of rain in December through March, so summer and early fall are easier to protect and schedule.

Can you stay in your house while the roof is being replaced?

Usually yes, since the work happens above the ceilings, but plan for noise. Long Beach bars construction before 7:00 a.m. on weekdays and before 9:00 a.m. on Saturdays. Ask the crew about debris, where the dumpster goes and whether anything in the attic needs to be moved first.

How much does a roofing permit cost in Long Beach?

The City publishes no flat roofing fee that we could read. Fees are valuation based, and plan review, when needed, is 85 percent of the building permit fee, not less than $154. Express Permits skip plan review, and historic review of re-roofing carries no fee.

Should a 20 year old roof be repaired or replaced?

Condition matters more than age. Ask a roofer to photograph the flashing, edge underlayment and decking, and to say whether repair will hold through a winter. We found no sourced lifespan for Long Beach roofs. If water has soaked the roof or two coverings are stacked, the City requires a full tear-off.

How do I choose a roofing contractor in Long Beach?

Begin at the CSLB lookup, where a C-39 roofing license shows its status, bond and workers' compensation record. Next ask for the written contract Business and Professions Code 7159 requires and for proof of insurance. Then ask who files the permit, or the historic Certificate if the house is in a district.

Free estimate

Describe your Long Beach roof

Tell us the address and what you have noticed from the ceiling or the gutters. We check historic district and shoreline exposure before we call back.

Free estimate · A real person answers · (888) 666-8224

Call (888) 666-8224