General Contractor Camarillo, CA: Eleven Trades from Zone Clearance to Final
A general contractor in Camarillo writes the scope, files every application digitally through the City's OpenGov portal, secures the Planning zone clearance an addition or patio cover needs, and manages licensed subcontractors through final inspection. MDG Builders, CSLB #1040337, does this for eleven trades. Soil, fire zone and Leisure Village rules shape most Camarillo jobs.
Eleven trades, one general contractor for Camarillo homes
Each page below checks one kind of job against Camarillo's handouts, fee schedule and municipal code, with the sources linked. Start with the work you have in mind.

Kitchen Remodeling in Camarillo
Two City handouts on cabinet permits, island outlets and 1.8 gpm faucets, pre-1994 fixture upgrades, Leisure Village condos and 1970s tract kitchens.
See Camarillo kitchen remodeling →
Bathroom Remodeling in Camarillo
Camarillo's bath permit line, 1970s tract plumbing, the City's 2019-era handout, Ventura County air rules and Leisure Village condos.
See Camarillo bathroom remodeling →
ADU Construction in Camarillo
State law first, then the City's ADU page and its zone clearance, Chapter 19.56 sizes, expansive soils, fire zones, Old Town and Leisure Village.
See Camarillo ADU construction →
Room Additions in Camarillo
Zone clearance before the building permit, R-1 yards, expansive soils, slope studies, Standard 515 defensible space and street improvements.
See Camarillo room additions →
Roofing in Camarillo
Class B minimum, the $219 base re-roof fee, hillside and Camarillo Springs fire zones, tile design rules and expansive-soil downspouts.
See Camarillo roofing →
Windows in Camarillo
The City permit for window change-outs, the Window Energy Form, base fees, lot-line walls, fire zones, airport noise and Old Town.
See Camarillo window replacement →
Flooring in Camarillo
Expansive soil under slabs, tract homes from the 1960s and 1970s, creek flood rules, garage floor coatings and what Camarillo exempts from permits.
See Camarillo flooring →
Painting in Camarillo
No permit for paint itself, lead-safe rules for the 44.7 percent of homes built before 1980, Ventura County VOC limits and stucco prep.
See Camarillo painting →
Concrete in Camarillo
Soil expansion tests, the 30 inch flatwork line, driveway and curb rules, a 3 foot wall limit, creek drainage and concrete costs in Camarillo.
See Camarillo concrete work →
Decks in Camarillo
Standard 515 Zone 0 fire rules, patio cover permits, slope and creek reviews, pool barriers, deck repair and deck costs in Camarillo.
See Camarillo deck building →
Fencing in Camarillo
The 3 foot front yard cap, 6 foot side and rear limit, block wall footings, pool barriers and noncombustible fence rules near hillside homes.
See Camarillo fencing →What decides how a Camarillo project gets permitted and built?
Camarillo is a young city on old ranch land. Rancho Calleguas was granted in 1837 and later passed to the Camarillo family, a small townsite grew up around 1910 near St. Mary Magdalen Church, and the valley stayed agricultural until the Ventura Freeway arrived in the mid-1950s. Veterans from the nearby bases bought many early tract homes, the City incorporated in 1964, and Leisure Village opened in 1973. Census Bureau ACS 2024 one-year estimates count 27,476 housing units, with the 1970s the largest building decade at 6,668 units and only about 2 percent from before 1950. That age profile is why the kitchen remodeling, bathroom remodeling and flooring pages focus on 1970s tract construction, pre-1994 fixtures and slab floors.
Permits come from the City's Building & Safety Division at 601 Carmen Drive, staffed under contract by Charles Abbott Associates, and since July 1, 2025 every application is filed digitally in OpenGov, with no paper plans accepted. Section 19.48.010 adds a Planning zone clearance before the building permit for any addition, and the City's permit handout extends that to patio covers, pools and solar, which is how the room additions and deck builder guides open. Published fees are base amounts: most items carry a 17.89 percent General Plan surcharge and an 11.34 percent technology surcharge on top.
The ground matters as much as the paperwork. Section 16.04.075 requires a soil expansion index test for each building site, and the Safety Element records expansive-soil damage in Camarillo Heights, on the west side and along Santa Rosa Road, which drives footing and drainage choices on the concrete and ADU construction pages. The hills on the north and east edges and Camarillo Springs sit in High and Very High fire zones, where Ventura County Fire's Standard 515 bans wood mulch and artificial grass in the first 5 feet and calls for noncombustible fencing near the wall, a point the fence company and roof replacement pages follow closely.
Housing type changes the job too. About 20.7 percent of units are in buildings of five or more, 1,254 are mobile homes and Leisure Village alone holds 2,136 attached senior units, so an HOA or park often approves work before the City does. The house painting and window replacement guides cover lead-safe work and the window permit. MDG Builders acts as the general contractor on each job: we write the scope, file and track the permit, book inspections and coordinate licensed plumbers, electricians, framers, roofers and finishers, who can show license numbers on request.

- Since July 1, 2025 Camarillo accepts permit applications only through its digital OpenGov portal.
- Section 19.48.010 requires a Planning zone clearance before the building permit for any addition.
- Most Camarillo building fees carry a 17.89 percent General Plan surcharge and an 11.34 percent technology surcharge.
- Each building site needs a soil expansion index test under Section 16.04.075.
- Ventura County Fire's Standard 515 treats the first 5 feet around a building as Zone 0 in fire hazard areas.
- Construction noise near homes is barred from 7 PM to 7 AM and all day on Sundays and listed holidays.
Cities near Camarillo we also build in
Hiring a general contractor in Camarillo: common questions
Where do I apply for a building permit in Camarillo?
Apply online through the City's OpenGov portal, which has been the only way to file since July 1, 2025 and also handles payment, tracking and inspection requests. Building & Safety is at City Hall, 601 Carmen Drive, and answers questions at 805-388-5395 on weekdays from 8 AM to 5 PM.
What is a zone clearance in Camarillo, and when do I need one?
A zone clearance is a Planning check that the project fits the zoning before Building issues a permit. Section 19.48.010 requires one for any addition, and the City's handout adds patio covers, gazebos, pools, solar and small sheds. The fee schedule lists a residential zone clearance at $135 before surcharges.
Why does Camarillo require a soil test for building sites?
Parts of Camarillo sit on expansive clay that swells when wet and shrinks when dry. Section 16.04.075 requires an expansion index test for each building site, and where the index exceeds 50, roof water must drain to pervious ground instead of the street, which shapes footings and gutters.
Is my Camarillo home in a fire hazard zone?
Possibly, if it is in the northern or eastern hills or Camarillo Springs. The September 2025 Safety Element places those areas in CAL FIRE's Moderate, High and Very High zones, where wildland-urban interface building rules and Ventura County Fire's defensible-space standard apply. Check your parcel before choosing materials.
Does Camarillo use the 2022 or the 2025 building codes?
Section 16.04.010 adopts the most current edition of the California codes, as amended by Ordinance 2034 of November 12, 2025, so the 2025 editions apply. Some City handouts still cite 2019 or 2022 editions, so we confirm the edition and any local amendment before drawing plans.
What happens if work starts without a permit in Camarillo?
The City opens a special investigation, and Section 16.04.045 sets an investigation fee equal to the permit fee, charged in addition to it and not in place of any penalty. You may also need to open finished walls so the inspector can see the work.
What hours can construction run in Camarillo?
Section 10.34.120(E) bars construction noise above the City's standards in or next to residential zones from 7 PM to 7 AM and all day on Sundays and listed holidays such as Memorial Day and Thanksgiving, so most crews work weekdays and Saturdays.
Who does the work if I hire MDG Builders in Camarillo?
MDG Builders, CSLB #1040337, is the general contractor: we write the scope, file the permit, schedule inspections and answer for the result. Licensed subcontractors in each trade, such as plumbing, electrical, roofing and tile, do the hands-on work, and each can show a license number on request.
Tell us about your Camarillo project
Send the address and a few lines on the work. Before we call, we check the lot's zoning, fire zone, soil history and any HOA or park rules, since those decide the permit path for a Camarillo job.