Tarzana, CA · Serving Southern CaliforniaCSLB #1040337 · (888) 666-8224
Bathroom Remodeling in Camarillo

Bathroom Remodelingin Camarillo, CA

Quick answer

Bathroom remodeling in Camarillo needs a City permit whenever a shower, tub or lavatory is removed, replaced or relocated, or the circuits and exhaust fan change. Countertop replacement and re-facing cabinets do not. About 44.7 percent of homes predate 1980, so ask about lead, old fixtures and what hides behind the tile.

CSLB #1040337 5.0 on Houzz Free written estimate
Primary bathroom: freestanding white tub, bathroom remodeling in Camarillo Old Town, Camarillo
CSLB #1040337Verified at CSLB
5.0 on HouzzRated by clients
Written proposalsScope and price in writing
Licensed specialistsSubcontractors do the work

Camarillo grew late and fast. The Rancho Calleguas grant dates to 1837, the original townsite was laid out around 1910 near St. Mary Magdalen Church, and the Ventura Freeway of the mid-1950s opened the valley to buyers, many of them veterans from nearby bases. Wikipedia dates incorporation to October 22, 1964. The Census Bureau's 2024 one-year estimates count 27,476 homes, and the 1970s were the biggest building decade, so a large share of the bathrooms here began life in the 1960s through the 1980s.

This page follows the order a bath job runs: the age of the house, the City's permit line, the handout's specifications, water-saving fixture rules, condos and senior communities, lead and asbestos, then fees and work hours. The City's own pages and PDFs read normally, but we read the Municipal Code on GoCodebook, a third-party mirror that is not the official code, so confirm every rule with Building & Safety at 805-388-5395 before you order materials. Price tiers and phases are on our bathroom remodeling page.

Bathroom Remodeling rules in Camarillo

City of Camarillo rules that apply to bathroom work

Where bathroom remodeling permits come from in Camarillo: City of Camarillo Community Development Department, Building & Safety Division.

  • Per the City's Bathroom Remodel handout, a permit is required when a remodel removes, replaces or relocates showers, tubs or lavatories or alters the electrical and exhaust fan, but not for countertop replacement or re-facing existing cabinets; a tub-to-shower conversion is also on the permit list.
  • The Bathroom handout (2019 codes) lists a 20-amp bathroom circuit, a GFCI outlet within 36 inches of the sink, no electrical fixtures within 3 feet horizontally and 8 feet above the tub rim except wet-rated ones, an exhaust fan with a back-draft damper and humidity control (50 cfm intermittent or 20 cfm continuous) terminating 3 feet from openings and property lines, a minimum 1,024 square inch shower area (30-inch circle), an out-swinging shower door, and tempered glazing in hazardous locations.
  • The pre-1994 plumbing retrofit rule applies here too (Civil Code 1101.4): the Bathroom handout lists toilets over 1.6 gallons per flush, showerheads, and bathroom faucets over 2.5 gpm as non-compliant fixtures that must be upgraded when a permit is pulled.
  • Camarillo's plumbing amendment requires toilets in new R occupancies to be dual flush at 1.28 gallons or a single flush of 1 gallon (Section 16.04.256).
  • CSLB defines the C-54 Ceramic and Mosaic Tile classification as preparing surfaces and installing glazed wall, ceramic, mosaic, quarry, paver and stone tile, including for bathtubs, showers and horizontal surfaces inside buildings.
Sources for these rules
  1. cms7files.revize.com: Residential%20Bathroom%20Remodel
  2. gocodebook.com: chapter 16.04 uniform building codes adopted by reference 1
  3. cslb.ca.gov: Licensing Classifications Detail
A wooden table with rolled blank drawings, a clipboard, bathroom remodeling near Camarillo in Somis
Housing age

How old is the plumbing behind a Camarillo bathroom?

The 1970s built 6,668 of Camarillo's homes, or 24.3 percent, and the 1960s added 4,170, according to the 2024 one-year Census estimates. About 44.7 percent of homes went up before 1980, only 2.0 percent before 1950 and 24.7 percent since 2000. Roughly 70 percent date from the 1960s through the 1990s. That is the footprint of a town that stayed small until the freeway and then filled in quickly, and the estimates carry wide margins of error.

A bath from that era has usually been touched once and patched since. Look for a tub that was never replaced, a vanity top from a later update and an exhaust duct that may end in the attic instead of outdoors. The median owner-occupied home is valued at $871,300 in the same file, which is too much house to discover rot after the new tile is down. Agree on a unit price for subfloor or drain repair before demolition begins.

  • Will someone probe the subfloor beside the toilet once the old floor is up?
  • Which line of the proposal pays for new framing or drain pipe if the wall surprises us?
  • Does the plan show where the fan duct ends outdoors?
A 1930s Los Angeles bathroom opened to the studs with a cast-iron tub, bathroom remodeling in Camarillo City Hall area, Camarillo
Permit line

Do you need a permit to remodel a bathroom in Camarillo?

Yes, once the work touches fixtures or circuits. The City's Bathroom Remodel handout says a permit is required when a remodel removes, replaces or relocates showers, tubs or lavatories, or alters the electrical and the exhaust fan. The general permit handout also names tub-to-shower conversions, re-piping, plumbing fixture replacement and water heater replacement. Countertop replacement and re-facing existing cabinets do not need one, and the general handout adds tiling and painting to its no-permit list.

Two cautions apply. The general handout lists cabinets as exempt, yet the bath handout lists lavatories, so a vanity swap that moves the sink or its plumbing is a question for the counter. And skipping the permit costs more: Section 16.04.045 of the Municipal Code, as read on the GoCodebook mirror, makes the investigation fee equal to the permit fee, charged on top of it. Describe the exact scope to Building & Safety before you buy a vanity or a valve.

Hall bathroom with a tub-to-shower conversion: white subway tile to the ceiling, clear glass panel, bathroom remodeling near Camarillo in Dos Vientos Community Park
Handout specs

What does the City's bathroom handout require for fans, outlets and showers?

The handout calls for a 20-amp bathroom circuit, a GFCI outlet within 36 inches of the sink, and no electrical fixtures within 3 feet sideways and 8 feet above the tub rim unless they are wet-rated. The exhaust fan needs a back-draft damper and humidity control, at 50 cfm intermittent or 20 cfm continuous, and must end 3 feet from openings and property lines. A shower needs at least 1,024 square inches of floor, which is a 30 inch circle, with a door that swings out and tempered glazing in hazardous locations.

Here is the catch. The handout was written to the 2019 codes, while Section 16.04.010 adopts the most current edition as amended by Ordinance 2034 of November 12, 2025. That is a conflict the City's pages do not settle, so ask which edition your plans are checked against. Either way, a shower stays dry because of a pan sloped to the drain and a flood test before tile goes on, so ask for dated photos of the test.

A bathroom shower pan being waterproofed: red waterproofing membrane painted over cement board on the wal, bathroom remodeling in Camarillo Ranch House, Camarillo
Water-saving fixtures

Bathroom renovation in a house built before 1994: which fixtures must change?

Civil Code Section 1101.4, quoted in the City's handouts, requires a building constructed before January 1, 1994 with non-compliant plumbing fixtures to be upgraded whenever a building permit is issued for remodeling, even if the fixtures sit outside the project scope. The bath handout names toilets over 1.6 gallons per flush, showerheads that do not comply and bathroom faucets over 2.5 gpm. Because the 1960s and 1970s built so much of Camarillo, a permit for one vanity can reach other fixtures in the house.

The City's plumbing amendment, Section 16.04.256, lists lavatory faucets at 1.5 gpm and kitchen faucets at 1.8 gpm, and writes its toilet line, dual flush at 1.28 gallons or single flush at 1 gallon, for new residential occupancies. The handout and the amendment give different faucet limits, so ask the counter which numbers a remodel must meet. Put new fixtures in the budget on permit day instead of when the inspector asks.

Floating oak vanity with a stone top, undermount sink, round mirror and two wall sconces, bathroom remodeling near Camarillo in CSU Channel Islands
Condos and parks

Remodeling a bathroom in a Camarillo condo, Leisure Village unit or mobile home

Renters occupy 8,656 of Camarillo's 26,025 occupied homes, or 33.3 percent, and 20.7 percent of all homes sit in buildings of five or more units. Another 4.6 percent, about 1,254 homes, are mobile homes. The City's 2022 Housing Element counts 2,136 attached senior units in Leisure Village, which opened in 1973 according to Wikipedia, 259 more at The Springs and four mobile home parks of 135 to 261 spaces each.

In those places the City permit is only half of the approval. We did not read the association or park rules for any of them, so we do not say what they require. Plan on written approval before anything is ordered, dates for water shut-offs that neighbors can see, and a clear answer about who owns the drain stack. A tenant cannot authorize a permit, and the City's older FAQ, written before the online system, says the owner or a licensed contractor applies for it.

A compact updated rental apartment bathroom with a white tub-shower combination, white subway tile, bathroom remodeling in Camarillo Heights, Camarillo
Lead and air rules

Lead, asbestos and paint limits for a Camarillo bath, set by Ventura County

Paid work that disturbs paint in a home built before 1978 falls under EPA's Renovation, Repair and Painting rule, and the Housing Element warns that those homes may carry lead-based paint. It reports that about 52 percent of owner-occupied and 45 percent of rental units were built before 1980, using a 2018 survey. Ask to see the EPA firm certificate of whoever will disturb the paint.

Asbestos is a separate and local question. The Ventura County Air Pollution Control District, not the South Coast district, enforces Rule 62.7 for residential renovation, and its questionnaire on the City's handouts page says renovation projects need an asbestos survey and asks whether 100 square feet or more of asbestos-containing material will come out. We did not research which products in Camarillo homes tend to contain it, so ask who tests flooring, mastic and wall materials before demolition. The paint that goes back is capped too: Rule 74.2 allows 50 grams of VOC per liter in nonflat coatings since July 1, 2021 and 100 in primers and sealers.

A hallway floor protected with ram board and plastic sheeting outside a bathroom door, bathroom remodeling near Camarillo in Herzog Wine Cellars
Fees and hours

What does a bathroom permit cost in Camarillo, and when can crews work?

The 2026 Master Fee Schedule starts non-structural residential remodels at a $511 base permit fee for the 100 square foot valuation tier and structural ones at $635, with plan check charged separately and valuation set at 50 percent of the International Code Council table. A water heater swap is $231 flat and a service panel upgrade is $292. Since July 1, 2025 an 11.34 percent technology surcharge applies, and a 17.89 percent General Plan surcharge applies to most items except nonstructural residential alterations, so a base fee is not the amount paid.

Filing is digital: the City takes no paper plans, and the OpenGov portal handles payment, tracking and inspection requests. Inspections are booked at 805-388-5383 for a morning or an afternoon window. Section 10.34.120(E) bars construction noise next to a residential zone from 7 PM to 7 AM and all day on Sundays and listed holidays, and a permit lapses if work does not start within 12 months or stops for 180 days.

Small powder room with a patterned cement tile floor, pedestal sink, bathroom remodeling in Las Posas Estates, Camarillo
Recent work

Bathroom photos from Camarillo and nearby homes

Bathroom scenes tied to Camarillo and the Ventura County communities around it, from opened walls and waterproofing to finished tile and fixtures. Tap a photo to enlarge it.

A hallway floor protected with ram board and plastic sheeting outside a bathroom door, bathroom remodeling near Camarillo in Herzog Wine Cellars
Small powder room with a patterned cement tile floor, pedestal sink, bathroom remodeling in Las Posas Estates, Camarillo
Walk-in shower with a recessed tile niche, small mosaic floor tile, bathroom remodeling near Camarillo in Newbury Park
Cost

What bathroom remodeling costs around Camarillo

Our bathroom remodeling page prices a 35 square foot bath in four tiers: roughly $9,000 to $18,000 for a refresh, $25,000 to $40,000 for a midrange remodel in the same layout, $50,000 to $85,000 and up for a primary bath, and $60,000 to $120,000 to add a bath that did not exist. Two outside sources anchor them: Remodeling magazine's 2025 Cost vs. Value study of Los Angeles lists $27,143 for a midrange bath and $85,055 for an upscale one, while Sweeten's Los Angeles cost guide opens its full bath range at $25,000 without moving walls. Neither is a Camarillo bid, we found no Camarillo price survey that states a method, and Ventura County costs may differ. City fees appear above as base figures before surcharges, and a written proposal carries them as their own line. MDG Builders, CSLB #1040337, acts as the general contractor that scopes the work, files it through the City's portal and runs the schedule, while licensed plumbers, tile setters and electricians do the field work, and any of them can show a license number and a certificate of insurance. Our bathroom cost guide shows what moves a bath between tiers, and the license check guide shows how to look up a contractor on the CSLB site. For how neighboring cities handle bath work, see Oxnard, Thousand Oaks, Moorpark and Los Angeles. A bath for a backyard unit belongs on the Camarillo ADU page, a bath that adds floor area on the Camarillo room addition page, a new bath window on the Camarillo window page, and the Camarillo area page lists every trade we cover in the city.

Bathroom Remodeling price ranges used for Camarillo estimates (Southern California sources, before permits)
What it coversTypical range
Refresh in the same layout: new vanity, toilet, fixtures, lighting, paint, limited tile$9,000 to $18,000
Mid-range full remodel in the same layout: new shower or tub, tile, vanity, fixtures, lighting and fan$25,000 to $40,000
Upscale or primary bath: stone, custom glass, freestanding tub, double vanity, heated floor$50,000 to $85,000 and up
Adding a new bathroom$60,000 to $120,000
FAQ

Camarillo bathroom remodel questions, answered

Do I need a permit for a bathroom remodel in Camarillo?

Yes, whenever a shower, tub or lavatory is removed, replaced or relocated, or the electrical and exhaust fan change. The City's bath handout exempts only countertop replacement and re-facing existing cabinets, and tile and paint sit on the no-permit list, so a purely cosmetic refresh may need none. Confirm your exact scope with Building & Safety at 805-388-5395.

How much is a permit to remodel a bathroom in Camarillo?

The 2026 fee schedule lists a $511 base permit fee for a non-structural residential remodel in the 100 square foot valuation tier and $635 for a structural one, with plan check separate. Those are base figures: an 11.34 percent technology surcharge applies, and a 17.89 percent General Plan surcharge applies to some items. Valuation sets the final amount.

Do I need a building permit to change a toilet in my home?

Yes in Camarillo, because the City's permit handout lists replacing plumbing fixtures among the work that needs a building permit. In a house built before 1994 the permit can also trigger water-saving upgrades under Civil Code Section 1101.4. Call Building & Safety at 805-388-5395 to confirm how your fixture is handled.

How much does a bathroom remodel cost in California?

For a 35 square foot bath we use $9,000 to $18,000 for a refresh, $25,000 to $40,000 for a midrange remodel and $50,000 to $85,000 and up for a primary bath. Los Angeles data from 2025 supports those tiers because no Camarillo survey turned up. A site visit and a written proposal give the real price.

Can a handyman do a bathroom remodel?

Only a very small one. Since January 1, 2025, California lets an unlicensed person do work totaling $1,000 or less, but only if no permit of any kind is needed and the person employs no one. A Camarillo bathroom that replaces fixtures needs a permit, so it needs a licensed contractor even under $1,000.

What is the difference between a bathroom remodel and a bathroom renovation?

Renovation generally keeps the layout and swaps finishes and fixtures, while remodeling moves walls, drains or what sits inside them. At the Camarillo counter the difference shows up as the permit line: tile and countertops are exempt, but moving or replacing a shower, tub or lavatory is not. Tell the counter which kind of job you mean.

How long does a bathroom remodeling take?

Plan on 2 to 6 weeks for design and selections, 3 to 7 days for demolition and rough plumbing, 3 to 5 days for waterproofing and curing, then 1 to 2 weeks each for tile and fixtures and for glass and final work. Permit time comes first, and a digital filing through the City's portal starts that clock.

Is remodeling a bathroom worth it?

Partly. Remodeling magazine's 2025 Los Angeles report shows a midrange bath recovering about 89.6 percent of its cost at sale and an upscale one about 42.3 percent. Camarillo's median owner-occupied home is valued at $871,300, and no local resale study turned up, so treat both numbers as a regional guide.

Does a bathroom remodel in Camarillo need lead-safe work?

Usually, if the house predates 1978. EPA's rule covers paid work that disturbs paint in those homes, and about 44.7 percent of Camarillo homes were built before 1980. Ask whoever disturbs the paint to show an EPA firm certificate and to explain how the work area will be sealed and cleaned.

Can I use my bathroom during the remodel?

Not the one being remodeled, and not for most of the job, because the fixtures come out and the shower pan has to cure before tile. If the house has one bath, ask for a written calendar of the days without water. A second bath, a gym membership or a relative's home covers the gap.

Free estimate

Tell us about your Camarillo bathroom

Tell us the tract or neighborhood, the decade the house went up, whether you own or rent and whether the bath sits in a house, a condo or a mobile home, and the first visit begins with the permit line and the fixture question.

Free estimate · A real person answers · (888) 666-8224

Call (888) 666-8224