Tarzana, CA · Serving Southern CaliforniaCSLB #1040337 · (888) 666-8224
Kitchen Remodeling in Camarillo

Kitchen Remodelingin Camarillo, CA

Quick answer

A kitchen remodel in Camarillo needs a City permit once cabinets, the sink, the dishwasher or an island are removed, replaced or moved, or the wiring or hood changes; a new countertop alone or refaced cabinets do not. Filing is digital through OpenGov, and a permit on a pre-1994 house also triggers water-saving fixture upgrades.

CSLB #1040337 5.0 on Houzz Free written estimate
A 1950s California ranch house kitchen opened to the dining room after a wall was removed, kitchen remodeling in Camarillo Old Town, Camarillo
CSLB #1040337Verified at CSLB
5.0 on HouzzRated by clients
Written proposalsScope and price in writing
Licensed specialistsSubcontractors do the work

Most Camarillo kitchens were built for a town that barely existed seventy years ago. Rancho Calleguas was granted in 1837, the first townsite was laid out around 1910 beside St. Mary Magdalen Church, and the valley stayed mostly farmland until the Ventura Freeway arrived in the mid-1950s. Veterans who had served at the nearby bases bought many of the first tract houses, Wikipedia dates incorporation to October 22, 1964, and the Leisure Village retirement community opened in 1973. Census Bureau ACS 2024 one-year estimates place 6,668 of the city's 27,476 housing units in the 1970s and 4,170 in the 1960s, while only about 2.0 percent predate 1950 and 47.3 percent are something other than a detached house.

MDG Builders, CSLB #1040337, takes a Camarillo kitchen from the first measurement to the final inspection as its general contractor: we write the scope, file it through the City's portal and book the inspections, and licensed plumbing, electrical, cabinet and tile subcontractors do the hands-on work. Permits come from the City's Building & Safety Division, staffed under contract by Charles Abbott Associates inside City Hall. The City's handouts open normally, but we read the Municipal Code on GoCodebook, a third-party mirror, so treat each section number here as something to confirm at the counter. Our kitchen remodeling page carries the sourced cost tiers, and the Camarillo overview lists every other trade we manage in town.

Kitchen Remodeling rules in Camarillo

What Camarillo's kitchen handout, plumbing amendment and fee schedule say

Where kitchen remodeling permits come from in Camarillo: City of Camarillo Community Development Department, Building & Safety Division.

  • Per the City's Kitchen Remodel handout, a permit is required for removing, replacing or relocating cabinets, countertops, sink, dishwasher or an island, or for altering the electrical or exhaust hood, but not for countertop replacement alone or re-facing existing cabinets; a required permit must be obtained before the remodel starts. The permit handout separately lists new or replacement cabinetry as not needing a permit, so confirm scope with the counter.
  • The Kitchen handout (written to the 2019 codes) lists high-efficacy lighting with separately switched under-cabinet lights, IC-rated airtight recessed fixtures, tamper-resistant GFCI receptacles within 6 feet of the sink and on islands, at least two 20-amp small-appliance circuits, an air gap for a dishwasher tied to a disposal, and a note that island traps are roughed in above the floor.
  • Civil Code Section 1101.4 (quoted in the handout) requires buildings built before January 1, 1994 with non-compliant plumbing fixtures to be upgraded whenever a building permit is issued for remodeling, even if the fixtures are outside the project scope; the handout lists the limits (for example kitchen faucets over 2.2 gpm).
  • Camarillo's plumbing amendment (Section 16.04.256) sets kitchen faucets at a maximum 1.8 gpm at 60 psi (briefly up to 2.2), residential lavatory faucets at 1.5 gpm, and requires an on-demand hot water recirculation system for water heaters in newly built single dwellings (Section 16.04.257).
  • Replacing a water heater needs a permit under the City's handout and costs $231 flat in Exhibit F before surcharges; a service panel upgrade is $292 residential.
  • Residential Alterations (Remodel) non-structural fees in Exhibit F start at a $511 base permit fee for a 100 square foot valuation tier, and structural remodels start at $635, with plan check separate (valuation uses 50 percent of the ICC table).
Sources for these rules
  1. cms7files.revize.com: Residential%20Kitchen%20Remodel
  2. gocodebook.com: chapter 16.04 uniform building codes adopted by reference 1
  3. cms7files.revize.com: Master%20Fee%20Schedule%202026%20 %20Updated%202.26.26%20FOR
A wooden table with rolled blank drawings, a clipboard, kitchen remodeling near Camarillo in Somis
Tract-era kitchens

How old is a Camarillo kitchen, and what does a 1960s or 1970s ranch layout mean for a remodel?

The 1970s were Camarillo's busiest building decade at 24.3 percent of all units, the 1960s added 15.2 percent, and roughly 70.0 percent of the stock went up between the 1960s and the 1990s. About 44.7 percent was built before 1980 and about 24.7 percent since 2000. That spread means a remodel here usually starts from a kitchen planned in the 1960s, 1970s or 1980s, and the first decision is whether to keep that footprint or open a wall.

The age of the house also matters on permit day. Civil Code Section 1101.4, which the City prints in its kitchen handout, says a building put up before January 1, 1994 with non-compliant plumbing fixtures must have them upgraded once a remodeling permit issues, whether or not those fixtures are part of the job. Every house in the 44.7 percent built before 1980 falls under it, and so do homes from the 1980s and the early 1990s. The handout treats a kitchen faucet above 2.2 gpm as non-compliant, while the City's own plumbing amendment, Section 16.04.256, sets a new kitchen faucet at 1.8 gpm at 60 psi, allowed to rise briefly to 2.2. Buy the faucet to the lower figure, and ask whether the inspector will also look at toilets and showerheads elsewhere in the house.

Count every faucet, toilet and showerhead in the house before the permit is filed, not only the ones in the kitchen.

Close detail of custom kitchen cabinetry: inset shaker doors, soft-close drawers, brass pulls, kitchen remodeling in Camarillo City Hall area, Camarillo
Cabinet permits

Do you need a permit to replace kitchen cabinets in Camarillo, and why do two City handouts disagree?

Yes, under the City's Residential Kitchen Remodel handout, which requires a permit before work starts when cabinets, countertops, the sink, the dishwasher or an island are removed, replaced or relocated, or when the electrical or the exhaust hood is altered. Only two jobs escape it there: a new countertop on its own and re-facing the existing cabinet boxes.

The shorter 'When Do I Need a Permit' sheet reads the other way, listing cabinets and countertops among work that needs no permit, next to carpeting, tiling and painting. We read the kitchen handout as the more specific document for a kitchen, and the cautious path is to describe the full scope to Building & Safety at 805-388-5395 and keep the answer in writing. Guessing wrong costs more than asking: Section 16.04.045 adds an investigation fee equal to the permit fee when work begins before a required permit, charged on top of the permit itself.

  • Countertop replacement on its own: no permit under either handout
  • New doors and drawer fronts on the old cabinet boxes: no permit
  • New cabinets, a moved dishwasher or a new island: permit under the kitchen handout
  • A new circuit, a moved outlet or a new hood duct: permit

Ask for the cabinet answer by email so the decision travels with the project file.

Range wall of a kitchen: stainless gas range, plaster range hood, zellige tile backsplash, kitchen remodeling near Camarillo in Dos Vientos Community Park
Wiring and the hood

What does Camarillo's kitchen handout ask for in outlets, lighting, circuits and the range hood?

The handout lists the details an inspector checks in a remodeled kitchen: high-efficacy lighting, under-cabinet lights on their own switch, IC-rated airtight housings for any recessed cans, tamper-resistant GFCI receptacles within 6 feet of the sink and on islands, and at least two 20-amp small-appliance circuits. A dishwasher that drains through a disposal needs an air gap, and an island sink has its trap roughed in above the floor.

Those lines were written to the 2019 codes, while Section 16.04.010 adopts 'the most current edition' of the state codes, amended locally by Ordinance 2034 on November 12, 2025. The California Energy Commission says the 2025 Energy Code took effect on January 1, 2026, and its summary of mandatory measures calls for mechanical exhaust in every kitchen, a field check of airflow and sound on a vented range hood, and dimmers on kitchen lighting other than lights built into the hood. Which of those reach a remodel rather than a new house turns on the alteration rules in section 150.2, which we did not read, so ask Building & Safety for its current kitchen checklist before ordering the hood and the light fixtures.

Choose the hood and the lighting after the checklist arrives, not before.

Kitchen island with three counter stools and pendant lights, kitchen remodeling in Camarillo Ranch House, Camarillo
Walls, slabs and creeks

Kitchen renovation that moves a wall, a sink or an island: drawings, slabs and flood rules in Camarillo

Taking out a wall changes the paperwork. The City's Building Design Limitations handout lets an unlicensed person draw non-structural interior work, but not any part that affects structural or seismic safety, and the Building Official may still ask for an architect or engineer where state law would not. The 2026 Master Fee Schedule opens a structural residential remodel at a $635 base permit fee, against $511 for a non-structural one, with plan check billed on its own line.

Moving the plumbing brings its own cost driver. In a house on a concrete slab, a new sink or island drain means saw-cutting a trench through the floor, and Camarillo gives good reason to look closely at that slab: the Safety Element records expansive-soil damage in Camarillo Heights and on the west side, and names the residential areas along Santa Rosa Road as highly expansive too. A cracked or lifted slab found during demolition is a repair to price before the cabinets go in.

Near Calleguas Creek, Conejo Creek, Beardsley Wash or Revolon Slough, check the flood map first. Chapter 16.34 says a substantial improvement, one costing 50 percent or more of the building's market value, in a mapped special flood hazard area must put the lowest floor at least 1.0 foot above base flood elevation. Whether a kitchen counts depends on the building's value and everything else in the same permit, so ask Public Works at 805-388-5340 whether the lot is mapped.

A kitchen gutted to the studs: new wall framing, rough plumbing lines and electrical boxes visible, kitchen remodeling near Camarillo in CSU Channel Islands
Lead and asbestos

Is there lead paint or asbestos in an older Camarillo kitchen, and who checks before demolition?

Treat lead as possible in any house built before 1978. The City's 2022 Housing Element warns that units from before that year may carry lead-based paint, and EPA's Renovation, Repair and Painting Rule says a paid renovation that disturbs paint in such housing must be done by a certified firm using lead-safe practices. Kitchens gather painted surfaces: cabinet faces, window trim, soffits and the wall behind the old range.

Asbestos belongs to the air district, not the City. Camarillo sits in the Ventura County Air Pollution Control District, and the District's questionnaire, linked from the City's handouts page, says the form also shows compliance with Rule 62.7 for residential renovation and demolition, says those projects will require an asbestos survey, and asks whether 100 square feet or more of asbestos-containing material will come out. Old sheet flooring and its mastic, joint compound and textured ceilings are common places a survey samples.

Debris has a rule too. Section 9.07.010 asks anyone building or reconstructing on a lot to provide containers for trash and recyclables and, where possible, to separate wood, metal, cardboard, concrete and masonry for reuse, so a kitchen tear-out needs a sorted bin plan.

Get the lead certification and the asbestos survey result before the first cabinet comes off the wall.

A 1950s California kitchen during demolition with a wall opened to bare studs showing old cloth-covered w, kitchen remodeling in Camarillo Heights, Camarillo
Condos, renters and Leisure Village

Can I remodel a kitchen in a Camarillo condo, Leisure Village home, mobile home or rental?

Yes, but the City permit is only one of the approvals. The ACS 2024 count puts 33.3 percent of Camarillo's 26,025 occupied homes in renters' hands, 20.7 percent of units in buildings of five or more and 4.6 percent, 1,254 units, in mobile homes. The Housing Element lists 2,136 attached senior units in Leisure Village alone, 259 at The Springs, and four mobile home parks: Camarillo, Camarillo Springs, Casa Del Norte and Rancho Adolfo. We did not read any association's or park's rules, so get the HOA or park approval in writing before a cabinet is ordered.

Who files matters too. An older City FAQ, written before the OpenGov switch, says the owner or a licensed contractor may apply and that a contractor must hold a valid City business license. A tenant should have the owner's consent before anything is filed. Under Business and Professions Code 7159 as the CSLB explains it, a buyer aged 65 or older has five business days to cancel a home improvement contract instead of three, which matters in a city with a large senior community.

Shared walls make the clock count. Section 10.34.120(E) bars construction noise above the chapter's limits next to or inside a residential zone from 7 PM to 7 AM, all day Sunday and on New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving and Christmas. Inspections run in a 9:00 AM to 12:00 PM or a 1:00 PM to 4:00 PM window, booked at 805-388-5383 or online.

A small bright rental apartment kitchen freshly updated with white shaker cabinets, kitchen remodeling near Camarillo in Herzog Wine Cellars
Cost and contracts

How much does a kitchen remodel cost in Camarillo, and what should the contract say?

We found no Camarillo cost survey that states its method, so the nearest sourced figures are for Los Angeles. Remodeling magazine's 2025 Cost vs. Value report lists $29,765 for a minor midrange kitchen there, $86,214 for a major midrange remodel and $171,369 for a major upscale one, working from Verisk cost data. Thumbtack's Los Angeles page, updated July 13, 2026, gives $12,471 to $40,909, and Sweeten's network opens a medium kitchen with no layout change at $24,500, $37,500 or $76,000 by finish level. Our own planning tiers run about $25,000 to $45,000 for a refresh, $45,000 to $90,000 for new cabinets, counters and appliances in the same footprint, and $90,000 to $170,000 or more for upscale work or a new layout.

City fees sit on top of those figures. The base amounts in the fee schedule, including $231 for a water heater swap and $292 for a residential panel upgrade, grow by an 11.34 percent technology surcharge, and most items also carry a 17.89 percent General Plan surcharge that Exhibit F waives for nonstructural residential alterations. Business and Professions Code 7159 requires a written contract and caps the down payment at $1,000 or 10 percent of the price, whichever is less. A kitchen draws on several license classes, C-6 for cabinets, C-36 for plumbing, C-10 for electrical, C-54 for tile and C-5 for framing, and our license check guide shows how to look up each one.

Finished bright kitchen in a California home: white shaker cabinets, quartz island with waterfall edge, kitchen remodeling in Las Posas Estates, Camarillo
Recent work

Kitchen photos from Camarillo and the valley around it

Kitchen scenes tied to Camarillo places such as Old Town, Camarillo Heights, Mission Oaks and Leisure Village, and to nearby Somis, Newbury Park and the Santa Rosa Valley, from opened walls and framing to cabinets, hoods and finished rooms.

A small bright rental apartment kitchen freshly updated with white shaker cabinets, kitchen remodeling near Camarillo in Herzog Wine Cellars
Finished bright kitchen in a California home: white shaker cabinets, quartz island with waterfall edge, kitchen remodeling in Las Posas Estates, Camarillo
A historic California Craftsman bungalow kitchen with original wood windows, kitchen remodeling near Camarillo in Newbury Park
Cost

Sources behind the Camarillo kitchen numbers

The tiers above and the sources that disagree with them are laid out on our kitchen remodeling page, and the California kitchen cost guide explains what moves a project from one tier to the next. How we divide a kitchen among licensed trades is described in how general contractors use subcontractors, and the Los Angeles kitchen permit guide shows how a much larger city draws its permit line. Each neighboring city issues permits under its own handouts, as our kitchen guides for Oxnard, Thousand Oaks, Moorpark, Port Hueneme, Simi Valley and Ventura show, and Santa Paula runs its own counter as well. Work that often travels with a kitchen has its own Camarillo pages: the bathroom remodel, new floors, interior painting, a room addition for a bigger footprint and an ADU with a second kitchen.

Kitchen Remodeling price ranges used for Camarillo estimates (Southern California sources, before permits)
What it coversTypical range
Refresh in the same layout: new counters, sink, lighting, hardware, paint and limited cabinet work$25,000 to $45,000
Full remodel in the same layout: new cabinets, counters, appliances, flooring and lighting$45,000 to $90,000
Upscale remodel or layout change: custom cabinets, premium appliances, a moved wall, relocated plumbing or gas$90,000 to $170,000 and up
FAQ

Kitchen remodel questions from Camarillo homeowners

Do I need a permit for a kitchen remodel in Camarillo?

Yes, in most cases. The City's kitchen handout requires a permit when cabinets, countertops, the sink, the dishwasher or an island are removed, replaced or relocated, or when the electrical or exhaust hood changes. Replacing only the countertop, or re-facing the existing cabinets, needs none. Every application is filed online through the OpenGov portal.

Do I need a permit to replace kitchen cabinets?

In Camarillo, probably yes. The kitchen handout puts removing or replacing cabinets on its permit list, although the City's general permit sheet lists cabinets as exempt. Because the two documents disagree, describe the scope to Building & Safety at 805-388-5395 and keep the answer with your project records.

Can I remodel my kitchen without a permit?

Only the exempt pieces, such as a countertop on existing cabinets or refaced doors and drawer fronts. Work that needed a permit and started without one draws an investigation fee equal to the permit fee under Section 16.04.045, charged in addition to the permit fee and not as a substitute for any penalty.

How much does a kitchen remodel cost in California?

For the Los Angeles area, Cost vs. Value 2025 lists $29,765 for a minor midrange kitchen and $86,214 for a major midrange remodel, and Thumbtack shows $12,471 to $40,909. We found no Camarillo survey with a stated method, so treat these as the nearest sourced figures and expect City permit fees and surcharges on top.

Can you remodel a kitchen for under $30,000?

Yes, for a refresh that keeps the layout. Cost vs. Value's Los Angeles minor midrange kitchen comes in at $29,765, and Sweeten's lowest tier for a medium kitchen without a layout change starts at $24,500. Moving the sink, adding an island or opening a wall pushes a project past that figure because each adds permits, trades and inspections.

What is the difference between a kitchen remodel and a kitchen renovation?

In everyday use the two words overlap, but a kitchen renovation usually means renewing what is already there, while a remodel changes the layout or how the room works. In Camarillo the label does not decide the permit: the City's handout looks only at what is removed, replaced or relocated.

How long does a kitchen remodel take?

We found no sourced duration for Camarillo, so we will not quote one. The City's limits set the outer frame: an application lapses 180 days after filing if not pursued, and an issued permit becomes invalid if work does not start within 12 months or stops for 180 days. Cabinet lead times and inspections set the real schedule.

Do you have to pay a remodeling contractor upfront?

No, not beyond a small deposit. Business and Professions Code 7159 limits the down payment on a home improvement contract to $1,000 or 10 percent of the price, whichever is less, and later payments should not run ahead of the work done. Owners 65 and older get five business days to cancel.

What order should you remodel a kitchen in?

Plans and permit come first, then demolition, any framing and the rough plumbing, wiring and duct work, followed by the rough inspections. Drywall, cabinets, countertops, backsplash tile and flooring come next, and fixtures, appliances and the final inspection close the job. In Camarillo each inspection is booked for a morning or afternoon window at 805-388-5383.

Can a handyman do a kitchen remodel in Camarillo?

Not one that needs a permit. Since January 1, 2025 California lets an unlicensed person take jobs under $1,000 only when no permit is needed and nobody is hired to help, so a kitchen that moves a sink, replaces a cabinet run or adds a circuit needs a licensed contractor whatever the price.

Free estimate

Start a Camarillo kitchen estimate

Send the neighborhood, the decade the house was built, whether it is a detached home, a condo or a park home, and which of the sink, the cabinets or a wall you want to move, and the first call starts with the permit scope and the fixture count.

Free estimate · A real person answers · (888) 666-8224

Call (888) 666-8224