Tarzana, CA · Serving Southern CaliforniaCSLB #1040337 · (888) 666-8224
San Fernando, CA

General Contractor in San Fernando, CA

Quick answer

A general contractor in San Fernando works inside a 2.4 square mile city where 83 percent of homes predate 1980, every fence needs a Planning application, work over $10,000 needs a waste plan and a pre-sale inspection report follows a sale. MDG Builders, CSLB #1040337, manages all eleven trades here.

Services

All eleven trades, applied to San Fernando's own rules

Each guide below takes the City's zoning sections, forms and housing facts and applies them to one trade, with the official sources linked. Pick the job closest to yours and read what Planning and Building and Safety are likely to ask for.

A historic California Craftsman bungalow kitchen with original wood windows, kitchen remodeling by a general contractor near San Fernando in Sylmar

Kitchen Remodeling in San Fernando

Older kitchens, permits for gas and plumbing, a waste plan on jobs over $10,000 and a pre-sale inspection that can expose unpermitted work.

See San Fernando kitchen remodeling →
Floating oak vanity with a stone top, undermount sink, round mirror and two wall sconces, bathroom remodeling by a general contractor in Lopez Adobe, San Fernando

Bathroom Remodeling in San Fernando

San Fernando's bathroom rules: the permit line, old plumbing, the resale inspection report, a debris plan and lead-safe work.

See San Fernando bathroom remodeling →
A backyard accessory dwelling unit: white board-and-batten cottage with a black-framed window and a , adu construction by a general contractor near San Fernando in Pacoima

ADU Construction in San Fernando

San Fernando's ADU route: the owner-occupancy conflict, 850 and 1,200 square foot caps, garage doors, fees and the resale inspection.

See San Fernando ADU construction →
Primary suite addition: bedroom with a vaulted ceiling, a large window, room additions by a general contractor in San Fernando City Hall, San Fernando

Room Additions in San Fernando

San Fernando's room addition rules: the 500 square foot review line, lot coverage, design standards, trees and the debris plan.

See San Fernando room additions →
A low-slope flat roof freshly coated with a white reflective membrane, roofing by a general contractor near San Fernando in Mission San Fernando Rey de

Roofing in San Fernando

A re-roof permit to confirm, a waste plan with Republic Services, no fire zone mapped in the city and historic review for older houses.

See San Fernando roofing →
A hillside Los Angeles house with new dual-pane tempered glass windows in black frames, windows by a general contractor in Las Palmas Park, San Fernando

Windows in San Fernando

San Fernando's window rules: lead-safe work in older homes, an open permit question, historic review, garage conversions and heat.

See San Fernando window replacement →
Luxury vinyl plank floor in a kitchen and dining area, warm gray wood look, white cabinets, flooring by a general contractor near San Fernando in Arleta

Flooring in San Fernando

The City's pre-sale report, vinyl and lead checks in 1920s to 1950s homes, slab moisture tests, debris plans and what flooring costs in San Fernando.

See San Fernando flooring →
A 1960s California ranch house with a fresh two-tone exterior: soft greige body, painting by a general contractor in San Fernando Library, San Fernando

Painting in San Fernando

Lead-safe rules for pre-1980 homes, historic review questions, a two-coat graffiti rule on street walls and sourced paint prices.

See San Fernando painting →
A new concrete block retaining wall in a sloped yard with a drainage gravel strip and young plants, concrete by a general contractor near San Fernando in Granada Hills

Concrete in San Fernando

Public Works permits for sidewalks and approaches, protected trees, masonry walls, front yard limits, pre-sale reports and concrete costs in San Fernando.

See San Fernando concrete work →
A close view of a noncombustible composite deck surface beside a stucco house wall, decks by a general contractor in San Fernando Middle School, San Fernando

Decks in San Fernando

The 200 square foot permit line, quake hold-downs, accessory structure limits, guard and pool rules, resale checks and deck repair in San Fernando.

See San Fernando deck building →
A black powder-coated steel pool fence with square pickets and a latch gate beside a lawn and a mode, fencing by a general contractor near San Fernando in Lake View Terrace

Fencing in San Fernando

A Planning application for every fence, 4 foot fronts, 6 foot sides, a chain link ban and a gateway height conflict to settle.

See San Fernando fencing →
City rules

What should a San Fernando homeowner check before hiring a general contractor?

San Fernando is small and old, and both facts shape every job. The land was platted in 1874 and the city incorporated on August 31, 1911. Today it covers about 2.4 square miles and is surrounded on every side by the City of Los Angeles. The City's 2025 historic survey says the population grew about 134 percent during the 1920s to 7,567 people by 1930, and that roughly 62 percent of the 1945 housing stock dated from 1910 to 1930. Tract houses then filled the north and northwest between 1946 and the late 1960s. The 1971 earthquake destroyed many homes and downtown buildings, and the survey cites County Assessor data showing only about 230 surviving buildings from 1971 to 1979. Census Bureau 2024 five year estimates count 6,613 housing units, 61.6 percent of the occupied ones owner-occupied, about 72.6 percent single-family detached and 83.0 percent built before 1980, with a median owner-occupied value of $674,700. Those ages matter behind the walls of a kitchen remodel or a bathroom remodel, where original pipe, wiring and floor layers can turn up, and on paper, because EPA's lead-safe rule reaches paid work that disturbs paint in pre-1978 housing, including a repaint or a window replacement.

It helps to know where our local rules come from. The City's Building and Safety page, run by the Community Development Department at City Hall, names the 2022 California Building Code and the 2017 California Fire Code, and we found no ordinance adopting a later edition, so ask which edition governs your permit. Building, mechanical, electrical and plumbing applications, plus accessory dwelling unit and site plan reviews, go through the City's Online Permit Counter, and the City warns that same-day issuance at the counter is not guaranteed. On June 15, 2026 the Council approved a Zoning Code Update, a Corridors Specific Plan update and Objective Design Standards. Our section numbers come from the Chapter 106 zoning PDF the City posts, since the City's code host would not open for our tools, and we could not confirm when that PDF's text took effect. Treat each section number as something to confirm with Planning. Dollar amounts appear on our pages only as printed on City forms: $345 on the resale inspection application, $142.80 on the Walls and Fences form, and $431.66 and $2,114.05 on a 2023 ADU form that is older than the zoning update.

A few local rules cut across trades. Anyone building or substantially repairing a fence, wall or gate files with Planning first, and a building permit is added above six feet or for any masonry; the City's fence form prints an 8 foot gateway clearance while the Objective Design Standards say 7 feet, a conflict to settle before a gate is drawn. For ADU construction, the posted code says owner occupancy is not required, yet the City's August 2023 ADU form still carries an owner occupancy covenant, so ask Planning which governs. The Objective Design Standards also reach substantial renovations and upper-floor additions, which is where a room addition can be pulled into an architectural style requirement. Work over $10,000, remodels over 250 square feet and re-roofs trigger a Construction and Demolition Waste Management Plan: service is set up with Republic Services before the permit issues, and a report showing at least 65 percent diversion is due before final inspection. A new roof fits that list. A driveway approach, curb or sidewalk in the street needs a Public Works permit before any concrete work begins, and Section 106-350 protects heritage, protected and native trees near decks, slabs and footings. Plain finish work such as new flooring sits on the state's permit-exempt list, though the waste plan can still apply to a larger remodel.

Hazards are quieter than in the foothill cities next door, but they are real. The City's 2022 Safety Element maps no CAL FIRE fire hazard severity zone inside San Fernando, and a 68 point sample of the County's August 2025 layer inside the boundary came back NonWildland at every point. That is a sample, not parcel zoning, so check an address on CAL FIRE's viewer. The same element names the 1971 San Fernando and 1994 Northridge earthquakes, says landslide zones are not present and maps one liquefaction zone along the western edge. NOAA's Pacoima Dam station, about 3.5 miles northeast, records 18.55 inches of rain a year, while Van Nuys Airport counts 77.1 days above 90 degrees F. The City also requires a pre-sale inspection report before any residential sale, listing city records and code violations, so unpermitted work can surface when the house is sold. MDG Builders is the general contractor of record, CSLB #1040337: we design, permit and manage the job, and licensed specialty subcontractors do the field work. Our license-check guide shows how to verify any contractor. Nearby hubs are Los Angeles, Burbank, Glendale and Santa Clarita.

Wide-plank natural oak floor in a bright living room with a white sofa and a large window, flooring by a general contractor in Downtown San Fernando, San Fernando
  • San Fernando was incorporated on August 31, 1911 and covers about 2.4 square miles.
  • About 83 percent of the city's housing units were built before 1980.
  • The 2022 Safety Element maps no fire hazard severity zone inside the city limits.
  • The resale inspection application in the City's forms prints a $345 fee.
  • Remodels over 250 square feet and work over $10,000 need a waste plan with Republic Services.
  • The City's 2025 survey evaluated 324 properties and flagged 221 as potential historic resources.
Nearby

Cities near San Fernando we also build in

FAQ

Questions San Fernando homeowners ask before they hire

Do I need a permit to build a fence in San Fernando?

Yes, every fence needs approval first, and some need a second permit. Section 106-378 in the Chapter 106 PDF requires a Planning application for any new or altered fence, wall or gate, plus a building permit above six feet or with masonry. Confirm the section number with Planning, because we could not verify its effective date.

Is San Fernando in a fire hazard zone?

The City's 2022 Safety Element maps no CAL FIRE fire hazard severity zone inside San Fernando, and our 68 point sample of the County's August 2025 layer returned NonWildland at every point. That is a sample, not parcel zoning, and Santa Ana winds can still carry embers, so check your address on CAL FIRE's viewer.

What is the San Fernando pre-sale inspection report?

It is a City report that sellers must obtain before selling any residential property, excluding hotels, motels and mobile homes. It lists city records for the structure and any code violations an inspector finds. The seller applies in person at City Hall, and unpermitted work done years ago can show up there.

What is the construction waste plan San Fernando asks for?

It is the City's Construction and Demolition Waste Management Plan form, which lists remodels over 250 square feet, valuation over $10,000, additions and re-roofing. Service is arranged with Republic Services before the permit issues, and a report must show at least 65 percent of debris diverted before final inspection, or final approval can be denied.

Can I build an ADU without living on the property?

The City's posted zoning text says owner occupancy is not required for ADUs, but its August 2023 ADU application form still carries an owner occupancy covenant citing an older section. The two conflict, and the PDF's effective date is unconfirmed, so ask Planning which text governs before you plan a rental.

Which building code does San Fernando enforce?

The City's Building and Safety page names the 2022 California Building Code and the 2017 California Fire Code. We found no City ordinance adopting a later edition, so ask Building and Safety which edition governs your permit. Fire code enforcement is coordinated with the Los Angeles Fire Department, according to the same page.

Do older San Fernando homes need lead-safe work?

Most do. EPA's Renovation, Repair and Painting rule requires a certified firm and lead-safe practices for paid work that disturbs paint in housing built before 1978, and about 83 percent of San Fernando's units predate 1980. Window replacement and demolition of painted surfaces never qualify for the small job exemption.

How much do San Fernando permits and plan reviews cost?

It depends on the project, and we quote only fees printed on City forms. The resale inspection application prints $345, the Walls and Fences form $142.80, and the 2023 ADU form $431.66 for conversions and $2,114.05 for new units, plus valuation based building fees. The ADU form predates the 2026 update, so confirm current amounts.

Free estimate

Tell us about your San Fernando project

Share the address and a short description of the work. Before we call, we look at which City reviews could apply, such as Planning for fences and exteriors, the waste plan and a nearby sale.

Free estimate · A real person answers · (888) 666-8224

Call (888) 666-8224