Tarzana, CA · Serving Southern CaliforniaCSLB #1040337 · (888) 666-8224
Concrete in San Fernando

Concrete Companyin San Fernando, CA

Quick answer

A concrete company in San Fernando answers to two City desks: Public Works for any sidewalk, curb, ramp or driveway approach in the right-of-way, and Planning and Building and Safety for walls and slabs on the lot. Flat driveways and walks are exempt on the state model list, but any masonry wall needs a building permit.

CSLB #1040337 5.0 on Houzz Free written estimate
Stamped concrete patio in a slate pattern with a round fire pit and outdoor chairs, concrete in Downtown San Fernando, San Fernando
CSLB #1040337Verified at CSLB
5.0 on HouzzRated by clients
Written proposalsScope and price in writing
Licensed specialistsSubcontractors do the work

San Fernando's flat ground filled with houses in two waves. The City's 2025 historic survey says about 62 percent of the 1945 housing stock dated from 1910 to 1930, then tract building covered the north and northwest from 1946 into the late 1960s, and the 1950s alone account for 2,053 of today's 6,613 homes in Census estimates. The February 1971 earthquake destroyed many homes and downtown buildings, and County Assessor data cited in the survey shows only about 230 surviving buildings from 1971 to 1979. An original front walk or driveway from the tract years is now roughly 55 to 80 years old.

MDG Builders, CSLB #1040337, is a general contractor in Tarzana. We draw up the scope, take it through Building and Safety and Public Works and hire a licensed concrete subcontractor to form, pour and finish the work (how that works). The concrete page covers materials and finishes, and the San Fernando overview lists our other trades in town.

Concrete rules in San Fernando

What San Fernando's Public Works, Building and Safety Division and Zoning Code say about concrete work

  • Construction or repair of street, sidewalk, curb, curb ramp, driveway approaches and sewer in the public right-of-way needs a Public Works Construction Permit with liability insurance naming the City, plans reviewed over ten days, and a bonded sewer contractor for sewer work.
  • The state list of permit-exempt work (Residential Code R105.2, as excerpted by the City of Albany from the 2025 code) exempts sidewalks and driveways not more than 30 inches above grade, and retaining walls up to 4 feet from the footing bottom unless they carry a surcharge. San Fernando's masonry fence and wall rule still requires a building permit for any masonry wall or pillar.
  • For projects covered by the Objective Design Standards, at least 20 percent of the lot area not used for buildings or required vehicle access and parking must be pervious, at least 50 percent of the street-facing yard between the house and the curb must be landscaped, and hardscape there is limited to pedestrian and vehicle access and paved patios and decks (section 5.1.1).
  • Where tree roots have caused severe hardscape damage, the Director can approve removal of a heritage, native or protected tree on an ISA certified arborist's report, and replacement trees are required at a 1 to 2 ratio when preservation is infeasible (Section 106-350).
  • CSLB defines the C-8 Concrete classification as forming, pouring, placing, finishing and installing mass, pavement, flat and other concrete work.
Sources for these rules
  1. sanfernando.gov: Construction Permits
  2. albanyca.gov: work exempt from permit 2025 cbc
  3. sanfernando.gov: san fernando ods book 2026 june single page
  4. sanfernando.gov: chapter 106 zcu clean
  5. cslb.ca.gov: Licensing Classifications Detail
A wooden table with rolled blank site plans, a clipboard, concrete near San Fernando in Sylmar
Sidewalks and approaches

Who needs a permit to fix a cracked sidewalk or driveway apron in San Fernando?

Anyone working in the public right-of-way does. The City's Public Works Construction Permits page lists street, sidewalk, curb, curb ramp and driveway approach construction and repair, plus utility trenching, and requires liability insurance naming the City as additional insured and certificate holder. Plans get a ten day review, so build that time into the schedule before a crew is booked.

Work that disturbs traffic needs a Traffic Control Plan stamped by a registered traffic engineer, with five days allowed for review, and sewer work needs a bonded sewer contractor. We did not find the City's text on who pays for a lifted sidewalk panel in front of a house, so ask Public Works before assuming the cost is yours or the City's. A panel cracked by a tree root also touches the tree rules below.

New broom-finished concrete driveway and a curved walkway to the front door of a California house, concrete in Lopez Adobe, San Fernando
Tree roots

Can I remove a tree whose roots are lifting my driveway or walk in San Fernando?

Not on your own say-so if it is a heritage, protected or native tree. Zoning Code Section 106-350 says that where roots have caused severe hardscape damage the Director can approve removal on a report from an ISA certified arborist, and that replacement trees are required at a 1 to 2 ratio when keeping the tree is not feasible.

Pouring near a tree you keep has its own rules: fence it with a barrier at two times the trunk diameter, up to 15 feet, place no fill within 3 feet of the trunk and avoid compacting soil inside the drip line. A tree that dies from construction is replaced with two 15 gallon trees. Ask the crew to show where the footing trench, the base and the barrier go before the first cut.

These rules come from the Chapter 106 PDF the City posts on its General Plan page, whose effective date we could not confirm, and the City's code site blocked automated reading, so check the live section with Planning.

A new light gray broom-finish concrete front walk with clean saw-cut joints leading to a historic Califor, concrete near San Fernando in Pacoima
Front yards

How much of a San Fernando front yard can be paved?

It depends on whether the Objective Design Standards reach the job. The City's June 2026 standards apply to new homes, substantial renovations (50 percent or more of exterior walls or roof removed), additions of 50 percent or more or 500 square feet, whichever is less, new upper floors and accessory dwelling units, and they do not apply to minor renovations or routine maintenance. A driveway replacement alone looks like maintenance, but that is our reading, so ask Planning.

Where they do apply, section 5.1.1 keeps at least 20 percent of the lot area not used for buildings or required parking and access pervious, and at least 50 percent of the street-facing yard landscaped, with hardscape there limited to walkways, driveways and paved patios and decks. An addition or ADU is the usual reason a concrete plan gets redrawn.

Corners and driveways add a clear-view rule. Section 106-377 keeps a triangle at least 20 feet along the right-of-way from a corner (10 feet at alleys) and 10 feet at single-family driveways, where only a non-view-obscuring fence or a hedge up to 30 inches may stand.

Exposed aggregate concrete walkway with a neat edge, lawn and succulents either side, concrete in San Fernando City Hall, San Fernando
Patios and slabs

Can you pour a concrete patio or slab in San Fernando without a permit?

We cannot confirm that from a City source. Residential Code section R105.2, as excerpted by the City of Albany, exempts sidewalks and driveways not more than 30 inches above grade, but a ground-level patio slab is not named, and we found no San Fernando handout on flatwork. Ask Building and Safety for a yes or no in writing, with the slab size and its distance to each property line.

A slab for a shed, workroom or cabana is an accessory structure under Section 106-45. It cannot sit in front of the main building (garages excepted), must be at least 6 feet from the main building and 3 feet from any property line if detached, and a non-parking structure is capped at the lesser of 500 square feet, 50 percent of the main building's ground floor or 50 percent of the rear yard.

Poured work also joins a larger file at resale. The pre-sale inspection program produces a report of City records and any violations an inspector finds, so an unpermitted wall or covered slab can surface then.

Close-up of smooth trowel-finished concrete with precise saw-cut control joints, soft side light, concrete near San Fernando in Mission San Fernando Rey de
Walls

How tall can a retaining or block wall be in San Fernando before it needs a permit?

The state model list exempts a retaining wall of 4 feet or less, counted from the footing bottom, that carries no surcharge, but San Fernando is stricter for masonry. The City's Walls and Fences application (Form CDD-024.5, 07/2026) says a masonry wall needs a building permit, asks for a plot plan and prints a total fee of $142.80. Section 106-378 sends every fence, wall or gate to Planning first, and a wall over 6 feet or one with masonry pillars to the Building Division.

Height limits come from the same form: 4 feet in a front yard or street-facing corner side yard, 6 feet in side and rear yards, and a retaining wall plus a fence above it may not exceed the freestanding limit. Block must be finished on both sides with stucco or split-face, and a solid wall facing the street needs two coats of anti-graffiti coating (Section 106-376). The form's 8 foot gateway clearance conflicts with the 7 foot maximum in the Objective Design Standards, so confirm if a gate is planned.

CSLB's C-29 masonry class covers concrete block walls, including fences, and its C-13 fencing class excludes masonry, so ask which license the wall crew holds.

A new concrete block retaining wall in a sloped yard with a drainage gravel strip and young plants, concrete in Las Palmas Park, San Fernando
Ground and weather

What do San Fernando's ground and weather do to a slab?

The City's 2022 Safety Element maps one liquefaction hazard zone, along the western boundary and mostly residential, and says no landslide hazard zones are present. It names the 1971 San Fernando (Sylmar) and 1994 Northridge earthquakes as the two most significant recent events. We found no San Fernando soils report or expansive soil statement, so ask for a soils report or probed footings when a wall or heavy slab is planned.

Flooding is narrow. The Element says the city is not in a 100-year floodplain; the one exposed area is the commercial and industrial strip about a block either side of the Pacoima Wash, if Pacoima Dam failed completely, with temporary flooding up to about six feet.

Weather sets the pour schedule. NOAA's Pacoima Dam normals show 18.55 inches of rain a year, 14.76 of them from December through March, and 0.07 inch in July. Van Nuys Airport averages 93.1 F for August highs, with 77.1 days a year at or above 90 F and 14.7 at or above 100 F, so ask the crew how it protects a pour on those days.

A trench for a concrete footing with a rebar cage on chairs, a string line and form boards, concrete near San Fernando in Arleta
Cost and license

What does a concrete company charge for concrete work in San Fernando?

We found no San Fernando price study, so these are Los Angeles figures from Angi's 2026 pages, which cite customer surveys and pro data as their basis. Angi gives $4 to $13 per square foot for a patio, $15 to $30 for stamped work and $8 to $20 for a driveway, with permits at $200 to $500 for patios and $150 to $400 for driveways. Our planning range for a typical slab of 300 square feet or more is $8 to $14 plain and $15 to $30 decorative, which puts a 20 by 20 foot plain patio at $3,200 to $5,600. Plain flatwork is medium in confidence, decorative work and driveways lower, and small jobs cost more per foot.

We print no per-foot price for retaining walls. Angi's Los Angeles average is $7,140 with a typical range of $2,674 to $11,842, and height and drainage drive it. Federal wage data put Los Angeles-area cement masons at $33.67 an hour in May 2025, a wage and not a billing rate.

CSLB's C-8 class covers forming, pouring and finishing flat and other concrete work. Our license check guide shows how to verify one.

Wood formwork with a rebar grid laid on gravel before a concrete pour for a backyard patio slab, concrete in San Fernando Library, San Fernando
Recent work

Concrete photos from San Fernando and nearby communities

Forms, rebar, screeded driveways, walks and finished patios from San Fernando and nearby Valley communities, shown at the stages that matter. Tap any photo to enlarge it.

A trench for a concrete footing with a rebar cage on chairs, a string line and form boards, concrete near San Fernando in Arleta
Wood formwork with a rebar grid laid on gravel before a concrete pour for a backyard patio slab, concrete in San Fernando Library, San Fernando
A freshly poured concrete driveway slab with wooden forms and a long screed board resting across it, concrete near San Fernando in Granada Hills
Cost

What concrete costs around San Fernando

Dollar figures here are Los Angeles planning ranges from our concrete page, not a San Fernando bid, and the proposal should show demolition, base, rebar and any City fees on their own lines. For the same lot, see flooring in San Fernando and decks in San Fernando. Neighboring comparisons: concrete in Los Angeles, concrete in Burbank, concrete in Santa Clarita and concrete in Glendale.

Concrete price ranges used for San Fernando estimates (Southern California sources, before permits)
What it coversTypical range
Patio, walkway or slab, broom finish, 300 sq ft or more$8 to $14 per square foot
Decorative: stained, stamped or exposed aggregate$15 to $30 per square foot
Driveway replacement, with demolition of the old slab$9 to $20 per square foot
20 by 20 foot plain patio (400 sq ft)About $3,200 to $5,600
20 by 20 foot decorative patio (400 sq ft)About $6,000 to $12,000
Small jobs under 300 sq ftUsually above the per-foot range
Retaining wallsSet by the written proposal
FAQ

San Fernando concrete questions, answered

Can I pour a concrete patio without a permit in San Fernando?

We cannot confirm that from a City source. The state model list exempts sidewalks and driveways up to 30 inches above grade, not a ground-level patio, and we found no San Fernando flatwork handout. Ask Building and Safety for a written answer with the slab size and its distance to each property line.

Can I expand my driveway without a permit in San Fernando?

Not without checking with the City. Anything in the public right-of-way, including a driveway approach, needs a Public Works Construction Permit with insurance naming the City. On the lot itself the state model list exempts driveways up to 30 inches above grade, but we found no San Fernando width rule, so ask Planning before you widen one.

What is the maximum height of a retaining wall without a permit in San Fernando?

Up to 4 feet on the state model list, counted from the bottom of the footing, if the wall holds back no surcharge. San Fernando is stricter for masonry: its fence and wall form says a masonry wall needs a building permit, and Planning approves every wall first. Confirm before you dig.

How much should a 20x20 concrete patio cost in San Fernando?

Angi's 2026 Los Angeles page gives $1,600 to $5,200 for a 20 by 20 foot patio at $4 to $13 per square foot. Our planning range of $8 to $14 plain puts 400 square feet at $3,200 to $5,600. Both are Los Angeles ranges and not a bid, and small jobs carry minimum charges.

How much does a concrete driveway cost in San Fernando?

Angi's 2026 Los Angeles page shows $8 to $20 per square foot and an average of $7,270, with 200 square feet around $2,500. Our planning range for replacement is $9 to $20 including demolition of the old slab. We rate driveways low to medium in confidence, and a driveway approach in the right-of-way needs a City permit.

Is 4 inches of concrete thick enough for a driveway in San Fernando?

We found no San Fernando thickness standard and no code section to quote, so 4 inches is common industry practice and not a City rule. A driveway approach in the public right-of-way goes through the City's ten day plan review, while a private drive's thickness, base and rebar should be written into your proposal.

Who pays to fix a cracked sidewalk or driveway apron in San Fernando?

We did not find the City's text on who pays, so ask Public Works. What we can confirm is that sidewalk, curb ramp and driveway approach repair in the right-of-way needs a Public Works Construction Permit, liability insurance naming the City and a ten day plan review, so a crew cannot simply patch it.

How much does a stamped concrete patio cost in San Fernando?

Angi's 2026 Los Angeles page gives $15 to $30 per square foot and an average of $5,948, which puts a 20 by 20 foot patio at $6,000 to $12,000. Decorative work is medium to low in confidence because the sources vary. Ask for the sealer, the pattern and the control joints to be listed in the proposal.

Can I remove a tree whose roots cracked my driveway in San Fernando?

For a heritage, protected or native tree, only with the Director's approval on an ISA certified arborist's report, and replacement trees at a 1 to 2 ratio if the tree cannot be saved. Section 106-350 comes from the Chapter 106 PDF the City posts, whose effective date we could not confirm, so check with Planning.

What license does a concrete company need in San Fernando?

CSLB's C-8 class covers forming, pouring and finishing flat concrete work, and its C-29 masonry class covers concrete block walls. Work that needs any permit must go to a licensed contractor even under $1,000. A San Fernando resale form also asks for the contractor's license number and class, so keep it.

Free estimate

Send a photo of the slab, the sidewalk and any tree nearby

Tell us what you want poured or replaced, how close a tree stands, and whether the work touches the sidewalk or a wall. The right-of-way and tree questions come with us to the first visit.

Free estimate · A real person answers · (888) 666-8224

Call (888) 666-8224