Tarzana, CA · Serving Southern CaliforniaCSLB #1040337 · (888) 666-8224
Burbank, CA

General Contractor in Burbank, CA

Quick answer

A general contractor in Burbank works around three local facts: most houses predate 1960, the northern foothills need a Hillside Development Permit, and wood roofs are banned everywhere. MDG Builders, CSLB #1040337, designs, permits and manages eleven trades here, with licensed subcontractors doing the field work.

Services

Eleven trades we manage across Burbank

Each page below takes one trade and applies Burbank's own permit tiers, zoning tables, fire map and housing stock to it, with the official sources linked. Pick the job you are weighing.

A small bright rental apartment kitchen freshly updated with white shaker cabinets, kitchen remodeling by a general contractor near Burbank in Toluca Lake

Kitchen Remodeling in Burbank

Tier 1 and Tier 2 permits, 1940s tract houses, apartment kitchens, Rancho and hillside rules and sourced Los Angeles cost tiers.

See Burbank kitchen remodeling →
Hall bathroom with a tub-to-shower conversion: white subway tile to the ceiling, clear glass panel, bathroom remodeling by a general contractor in Burbank Town Center, Burbank

Bathroom Remodeling in Burbank

Tier 1 versus Tier 2 permits, lead-safe demolition in 1940s houses, apartment and soft-story timing and Burbank's construction hours.

See Burbank bathroom remodeling →
The backyard of a 1920s California bungalow cleared for a new backyard unit, with wooden stakes, adu construction by a general contractor near Burbank in North Hollywood

ADU Construction in Burbank

The City's 850 and 1,000 square foot caps, R-1-H horse lots, garage conversions without replacement parking, preapproved plans and fire zone checks.

See Burbank ADU construction →
A 1960s stucco house with a freshly built second story, new windows and a low-pitched roof, room additions by a general contractor in Magnolia Park, Burbank

Room Additions in Burbank

The R-1 floor area ratio, second-story stepbacks, Rancho Area review, Hillside Development Permits and ProjectDox plan check for Burbank additions.

See Burbank room additions →
Close-up of a roof valley with metal flashing, new shingles cut cleanly along it, roofing by a general contractor near Burbank in Universal City

Roofing in Burbank

Online Tier 1 re-roof permits, the ban on wood roofs, fire zone checks and cool roof limits for Burbank homes.

See Burbank roofing →
Bedroom with two white double-hung windows, linen curtains, a bed with white bedding, windows by a general contractor in Media District, Burbank

Windows in Burbank

The City's window permit application, fire zone glass, lead-safe work in pre-1978 homes, bedroom egress and sun-heavy valley climate for Burbank windows.

See Burbank window replacement →
A bare plywood subfloor in an empty room being prepared: clean screws in rows, flooring by a general contractor near Burbank in Sun Valley

Flooring in Burbank

Raised floors in 1940s tract houses, renter and condo approvals, whether a floor needs a permit, slab moisture tests and what installation costs.

See Burbank flooring →
Freshly painted light gray stucco exterior of a house with a terracotta tile roof and new white trim, painting by a general contractor in McCambridge Park, Burbank

Painting in Burbank

No permit for ordinary paint, a sandblasting permit, lead-safe rules for pre-1978 homes and no historic districts in Burbank.

See Burbank painting →
Stamped concrete patio in a slate pattern with a round fire pit and outdoor chairs, concrete by a general contractor near Burbank in Glendale

Concrete in Burbank

Front yard paving caps, driveway width limits, retaining wall heights, hillside grading rules, flood and soil checks and concrete costs.

See Burbank concrete work →
A rear deck of warm cedar boards on a 1920s California bungalow, with simple railings, decks by a general contractor in Verdugo Park, Burbank

Decks in Burbank

Whether a deck needs a permit, the 10 foot side setback, fire zone and hillside rules, railing and pool barrier heights, deck repair and costs.

See Burbank deck building →
Black wrought iron fence and driveway gate in front of a stucco house with palms, fencing by a general contractor near Burbank in Tujunga

Fencing in Burbank

The 4 foot front yard limit, open design above 2 feet, no new front chain link, retaining walls and 5 foot pool barriers in Burbank.

See Burbank fencing →
Burbank at a glance

What changes about a remodel when the house is in Burbank?

Start with the age of the housing, because it sets the hidden costs. Burbank's townsite opened on May 1, 1887, and the city incorporated in 1911. Lockheed's plant and the film lots pulled population from 16,662 in 1930 to 78,577 in 1950, and the City's own historic context report describes defense worker housing, mostly Minimal Traditional houses in a few repeated plans, filling the west and southwest side. Census Bureau 2024 estimates count 46,928 housing units. About 37 percent were built before 1950, about 70 percent before 1980, and 56.7 percent of occupied units are rented. Houses that old often hide lead paint, original wiring and galvanized pipe, which is why a kitchen remodel or bathroom remodel here usually begins with a look behind the walls, and why a house painting or window replacement job can fall under EPA's lead-safe renovation rule.

Permits run through the Building & Safety Division of Community Development, and the Burbank permit counter page sorts every job into two tiers. Tier 1 is repair and maintenance with no plan check, including reroofing, and many single-family permits of that kind can be pulled online. Tier 2 covers additions, alterations and accessory dwelling units, and it goes through plan check and zoning review. Since January 1, 2026 the city enforces the 2025 California Building Code with local amendments. Anything started without a permit that needed one draws an investigation fee equal to the permit fee, on top of the permit. We tell you which tier your scope lands in before you sign anything, whether it is a room addition, an ADU or a new deck.

The street side of a Burbank lot is more regulated than most owners expect. In R-1 zones a front yard fence tops out at 4 feet and must be open above 2 feet, new chain link is banned in front and street-facing side yards, and only 45 percent of a front setback may be paved, which shapes every fence project and concrete driveway plan. Wood shake and shingle roofs are prohibited citywide, so any roof repair or replacement starts from a noncombustible covering, and a Class A rating is what the City recommends when a roof is replaced. New flooring is the one trade that usually needs no permit at all, because the City's exempt list covers tile and carpet, though a condo association or landlord may still require approval.

The northern edge of the city is a different jurisdiction in practice. Foothill lots north of Sunset Canyon Drive and Bel Aire Drive follow hillside height and view rules, and a Hillside Development Permit comes before the building permit for grading, more than 16 feet of height or more than 3,000 square feet of floor area. The Rancho area near the old equestrian district adds a Rancho Review Board and a ranch-style design standard, and horse-keeping R-1-H lots allow an ADU only as a conversion. The fire map matters on both: a parcel touching more than one hazard zone is treated as the highest one, and Very High parcels owe annual brush clearance. Burbank also lists no historic districts, only 16 individual properties, so the lot's zone and the fire map decide most outcomes, not a preservation overlay. Neighbors compare notes with our pages for Glendale and Los Angeles, which sit on either side of the foothills.

A modern California house with a dark standing-seam metal roof, white stucco walls and a blue sky, roofing by a general contractor in Downtown Burbank, Burbank
  • Burbank's Building & Safety counter takes walk-ins Monday to Thursday 8:00 a.m. to 3:30 p.m. and Friday 8:00 a.m. to 3:00 p.m., closed noon to 1:00 p.m.
  • Construction is allowed Monday to Friday 7:00 a.m. to 7:00 p.m. and Saturday 8:00 a.m. to 5:00 p.m., never on Sundays or City holidays.
  • NOAA records 13.91 inches of rain a year at the Burbank airport station, with 82 percent falling December through March.
  • That same station logs 53.9 days a year above 90 degrees F and 7.2 days above 100 degrees F.
  • Burbank's soft-story seismic retrofit ordinance requires completed work on affected apartment buildings by January 10, 2030.
  • The City's list of historic properties names 4 National Register, 2 California Register and 11 local resources, and no districts.
FAQ

Questions Burbank homeowners ask before hiring a contractor

Where do I get a building permit in Burbank?

Permits come from the Building & Safety Division of the Community Development Department, which takes walk-ins at its counter and runs an online permit portal for qualifying single-family work. Larger jobs go through electronic plan check. The City's website blocks automated tools, so confirm fees and turnaround by calling (818) 238-5220.

What is the difference between a Tier 1 and a Tier 2 permit in Burbank?

Tier 1 is simple repair and maintenance that needs no plan check and can often be issued over the counter or online, such as reroofing, water heaters and fixture changes. Tier 2 covers additions, alterations and ADUs, and it needs plan check or zoning approval before work starts.

Can I hire an unlicensed handyman for a Burbank remodel?

Only for work totaling $1,000 or less, labor and materials combined. California's exception ends if the job needs a building permit or the person hires any worker. Burbank also issues permits only to license holders, apart from a narrow owner-builder exception, so most remodels need a licensed contractor.

How do I find out if my Burbank home is in a Very High Fire Hazard Severity Zone?

Use the Check Your Zone viewer linked from the Burbank Fire Department's Fire Hazard Reduction Program page, which reflects the State Fire Marshal's March 24, 2025 map update. A parcel in more than one zone counts as the highest. Very High parcels must clear brush to 100 feet each year.

Can I have a wood shake roof or wood siding in Burbank?

No wood roof covering may be installed anywhere in Burbank, and old wood shake roofs were due to be gone by August 14, 2014, or 2005 inside the fire zones. Wood shake and shingle siding is also banned citywide, with more wood siding types barred in the fire zones.

Do hillside lots in Burbank need extra approval?

Often yes. In the foothill area north of Sunset Canyon Drive and Bel Aire Drive, a Hillside Development Permit is required before a building permit for grading, a roof higher than 16 feet, or more than 3,000 square feet of counted floor area. Slopes steeper than 1 to 3 also trigger seismic provisions.

Does Burbank have historic districts that limit exterior changes?

No. The City's list, current as of May 22, 2026, names 4 National Register properties, 2 California Register properties and 11 local Burbank Historic Resources, all by address, and no districts. If your house is on the list, call Planning at (818) 238-5250 before changing its exterior.

What does MDG Builders do on a Burbank job?

MDG Builders holds CSLB license #1040337 as a general contractor. We design the scope, pull permits, schedule and supervise the trades, and run inspections, while licensed subcontractors do the field work. You can ask for each subcontractor's license and certificate of insurance before they start.

Free estimate

Tell us about your Burbank project

Send the address and a few lines about the job. We look up the lot's zone, fire map position and hillside status first, then call to explain which Burbank reviews your scope is likely to meet.

Free estimate · A real person answers · (888) 666-8224

Call (888) 666-8224