Tarzana, CA · Serving Southern CaliforniaCSLB #1040337 · (888) 666-8224
West Hollywood, CA

General Contractor in West Hollywood, CA

Quick answer

A general contractor in West Hollywood mostly works inside older apartment buildings, where owners and associations approve the job before a permit is filed, since 80.2 percent of occupied homes are rented. The northern edge adds fire map and fault checks. MDG Builders, CSLB #1040337, manages all eleven trades here.

Services

The eleven trades MDG Builders runs for West Hollywood owners

Each trade page applies West Hollywood's code sections, overlays and building age to one kind of job, and it marks what we could not confirm. Start with the work you have in mind.

Close detail of custom kitchen cabinetry: inset shaker doors, soft-close drawers, brass pulls, kitchen remodeling by a general contractor near West Hollywood in Beverly Grove

Kitchen Remodeling in West Hollywood

Apartment-building kitchens, exempt finish work versus permits, the code edition to confirm, tenant questions and overlay limits on bump-outs.

See West Hollywood kitchen remodeling →
A compact updated rental apartment bathroom with a white tub-shower combination, white subway tile, bathroom remodeling by a general contractor in West Hollywood West, West Hollywood

Bathroom Remodeling in West Hollywood

West Hollywood bath work: apartment and condo buildings, the permit line, 1920s plumbing, lead rules, the Norma Triangle and work hours.

See West Hollywood bathroom remodeling →
Interior of a finished ADU studio: kitchenette with white cabinets, sleeping area, adu construction by a general contractor near West Hollywood in Fairfax District

ADU Construction in West Hollywood

West Hollywood's two ADU permit paths, the 60 day clock, apartment-lot rules, size and height caps, fault and fire checks and fees.

See West Hollywood ADU construction →
Survey stakes and string lines marking the footprint of a future room addition on a side yard beside, room additions by a general contractor in Sunset Strip, West Hollywood

Room Additions in West Hollywood

West Hollywood's addition rules: zoning proof with the permit, the R1-B overlays, rear-yard structures, fault zone, canopy trees and historic review.

See West Hollywood room additions →
A low-slope flat roof freshly coated with a white reflective membrane, roofing by a general contractor near West Hollywood in Trousdale Estates

Roofing in West Hollywood

Apartment-building roofs, a fire map along the northern edge, a re-roof permit to confirm and weekday-only exterior work.

See West Hollywood roofing →
Living room with new large white vinyl windows and a sliding glass door, bright natural light, windows by a general contractor in West Hollywood City Hall, West Hollywood

Windows in West Hollywood

West Hollywood windows: historic review, lead-safe rules for older buildings, hillside fire glass, the permit question and apartment-building jobs.

See West Hollywood window replacement →
A neat stack of unlabeled wood and vinyl floor plank samples in different tones leaning against a wa, flooring by a general contractor near West Hollywood in Beverly Hills

Flooring in West Hollywood

Rentals and condos, 1920s apartment floors, asbestos and lead checks, the permit question and work hours for floors in West Hollywood.

See West Hollywood flooring →
A 1960s California ranch house with a fresh two-tone exterior: soft greige body, painting by a general contractor in Plummer Park, West Hollywood

Painting in West Hollywood

Lead-safe rules for pre-1980 buildings, old stucco, landmark paint review, interior work in rentals and weekday-only exterior hours.

See West Hollywood painting →
A new light gray broom-finish concrete front walk with clean saw-cut joints leading to a historic Ca, concrete by a general contractor near West Hollywood in Hancock Park

Concrete in West Hollywood

The 50 percent permeable yard rule, retaining wall limits, the fault zone, Saturday pour hours and concrete costs in West Hollywood.

See West Hollywood concrete work →
Close-up of composite decking boards with hidden fasteners and a clean picture-frame border, decks by a general contractor in Pacific Design Center, West Hollywood

Decks in West Hollywood

The northern fire zone strip, the 200 square foot permit line, yard limits, overlays, balcony owners and deck repair in West Hollywood.

See West Hollywood deck building →
A black powder-coated steel pool fence with square pickets and a latch gate beside a lawn and a mode, fencing by a general contractor near West Hollywood in Laurel Canyon

Fencing in West Hollywood

42 inch solid fronts, six foot open fences, a chain-link ban, retaining wall limits and a permit exemption the City and state list differently.

See West Hollywood fencing →
Apartments first, hillside second

How does West Hollywood's mix of apartment blocks and hillside lots change a contracting job?

West Hollywood is small and packed tight. The city covers 1.89 square miles, began in the late 1890s as the railroad town of Sherman, took the name West Hollywood in 1925 and stayed under County rule until it incorporated on November 29, 1984. Census Bureau 2024 five-year estimates count 26,079 housing units, and 80.2 percent of the 22,920 occupied units are rented. Just 2,428 units, about 9 percent, are detached houses, while 21,220 units, or 81.4 percent, sit in buildings of five or more units. About 17 percent date from 1939 or earlier, about 24 percent from before 1950 and about 80 percent from before 1980, and 1920s Spanish Revival and Art Deco apartment buildings, many designed by Leland Bryant, still line Fountain, Harper and Havenhurst. The median owner-occupied home is valued at $924,800, plus or minus $63,354. A typical call is therefore a kitchen remodel in a unit where the landlord or association must say yes, a bathroom remodel on pipes from the 1920s, or new flooring over a subfloor that has not been opened in decades. Tenant protections and rent rules are outside what we verified, so this page leaves them out; ask the City before you plan work in an occupied unit.

The rulebook is the Los Angeles County building code with a layer of West Hollywood changes. As the Municipal Code reads on the GoCodebook mirror, chapter 13.04 adopts County Title 26 with the 2025 California Building Code as in effect January 1, 2026, and chapter 13.20 does the same for the residential code. The City's own site and the eCode360 copy blocked our tools, so we read the GoCodebook text, and the details of the Building & Safety exemption list come from a third-party copy that cites the City's page. Treat every one of those readings as something to confirm with the Building & Safety Division. For the 2026 ordinances that update the building code and the ADU rules, we saw Council agendas but never the adopted text, so adoption as written is unconfirmed. We also found no fee schedule and no window replacement handout, so fees and window replacement paperwork show up in proposals as lines to verify. A few rules hold either way. A permit application expires if no permit issues within 18 months, a debris control plan approved by Public Works must be in place before work starts, and any application has to show compliance with the zoning ordinance. Construction runs on weekdays from 8 a.m. to 7 p.m., on Saturdays for interior work only and never on Sundays or listed holidays, which keeps roof repair and deck building to Monday through Friday.

The northern strip is where the lot starts to matter. Los Angeles County Fire's copy of the state fire map, revised August 21, 2025, put 18 of 121 sample points inside the city in Very High, 9 in High and 9 in Moderate, all in a band near the Sunset Strip and the top of the city. That is a point sample, not parcel zoning, so look up the address on the City's fire map before anyone specifies a Class A covering, ember-resistant vents or tempered glass. A September 2025 Council item introduced an ordinance to adopt CAL FIRE's March 2025 map, and we could not confirm its adoption. Part of the Norma Triangle sits in the Hollywood Earthquake Fault Zone, and Building Code 13.04.070 lets the Building Official require a geologist's report. West Hollywood West and the Norma Triangle follow the R1-B zone with design findings, the West Hollywood West table sets a floor area ratio of 0.5, the Norma Triangle guidelines date from January 23, 2017, and a 2024 ordinance asks new projects for canopy trees, all of which shape a room addition. Designated landmarks need a certificate of appropriateness under Chapter 19.58, though the Director can approve in-kind roof, window, paint and fence work. Zoning also caps paving, since no more than half of required yards may be non-permeable, which limits concrete work. A solid front fence stops at 42 inches, chain-link is banned, and the City's exempt list says 6 feet where the state list says 7, a conflict to settle before anyone builds. ADU construction is ministerial under 19.36.310, with a 60 day clock on a complete application, and it is the route that fits apartment lots best.

Weather is the easy part. NOAA's 1991 to 2020 normals for the UCLA station, about 4.3 miles west in Westwood and so a nearby estimate, show 17.73 inches of rain a year, 14.53 of it from December through March, with 10.4 days above 90 F and 0.3 above 100 F. Average highs run from 67.0 F in February to 78.8 F in August, which leaves a long dry stretch for house painting and exterior jobs. Every price on our trade pages comes from Los Angeles sources, because we found no West Hollywood price survey, so read them as planning ranges and not as a bid. MDG Builders holds CSLB #1040337 and acts as the general contractor of record: we write the scope, file the permits, book licensed specialty subcontractors and inspect the finished work with you, and each subcontractor's license and insurance certificate are yours to request. Our article on subcontractors explains who does what. Nearby cities with their own hubs are Culver City, Santa Monica, Los Angeles, Glendale and Burbank, and Beverly Hills lies just to the south and west.

Primary bathroom: freestanding white tub, bathroom remodeling by a general contractor in Norma Triangle, West Hollywood
  • West Hollywood incorporated on November 29, 1984 and covers just 1.89 square miles.
  • Renters hold 80.2 percent of occupied homes, and 81.4 percent of homes are in buildings of five or more units.
  • About 80 percent of the housing stock predates 1980, so lead-safe rules reach many repaint and window jobs.
  • A County fire layer sample put 18 of 121 points inside the city in Very High, all near the northern edge.
  • A permit application expires when no permit is issued within 18 months of filing.
  • Municipal Code 9.08.050 bars Sunday work and any exterior work on Saturdays.
Nearby

Cities near West Hollywood we also build in

FAQ

Hiring a general contractor in West Hollywood: common questions

Do I need a licensed general contractor for work on my West Hollywood property?

Usually yes. California lets an unlicensed person take only jobs under $1,000, counting labor and materials together, and only when no workers are hired and no building permit is needed. Most West Hollywood remodeling needs a permit, so a licensed contractor is the safe route, and CSLB lists fines and jail time for violations.

Who issues building permits in West Hollywood?

The Building & Safety Division of the Community Development Department issues them. The City's own pages blocked our tools, so we cannot describe portal steps, counter hours, fees or turnaround times with confidence. Call the division or visit before you plan around a date, and bring your zoning information, since applications must show zoning compliance.

How do I find out whether my West Hollywood building is in a fire hazard zone?

Look it up on the City's fire map page, or call the Public Safety Division at (323) 848-6414. Our sample of the County layer found zoned points only near the northern edge, but a sample is not parcel zoning, so rely on the City's map for your exact address.

Does a remodel in a rented West Hollywood unit need the landlord's approval?

In practice, yes. With 80.2 percent of occupied homes rented and 81.4 percent of homes in buildings of five or more units, the owner, the lease and any association rules decide before the City does. We did not research tenant or rent rules, so ask the City and the owner before scheduling work in an occupied unit.

What hours may contractors work in West Hollywood?

Construction is allowed on weekdays from 8 a.m. to 7 p.m., and on Saturdays only for interior work. Sundays and ten listed holidays are off limits, and gas or combustion-powered leaf blowers are banned at all times. We read this on the GoCodebook mirror, which notes some exceptions, so confirm with the City.

How tall can a fence be in a West Hollywood front yard?

A solid fence in the required front setback is limited to 42 inches, and one at least half transparent may reach six feet. Chain-link is banned. The permit exemption is unclear: a third-party copy of the City's list says 6 feet, the state list says 7, so ask Building & Safety before you build.

Can I build an ADU on a West Hollywood apartment lot?

Probably, as we read the code. A building permit alone can cover converted ADUs inside a multifamily building, up to 25 percent of the existing units, plus detached ADUs on a multifamily lot. A complete application gets a decision within 60 days. We could not confirm the 2026 ordinance text, so ask Planning for the current rules.

Does lead-safe work apply to older West Hollywood buildings?

Yes, for most of them. About 80 percent of the city's housing units went up before 1980, and EPA's renovation rule applies to paid work that disturbs paint in housing built before 1978. Window replacement is always covered. The firm must be certified, so ask for the certificate before demolition or sanding begins.

Free estimate

Tell us about your West Hollywood property

Give us the address, say whether it is a house, a condo or an apartment building, and describe the job. Before we call, we check the fire map, the overlays and any historic status, and we ask who has to approve the work.

Free estimate · A real person answers · (888) 666-8224

Call (888) 666-8224