Tarzana, CA · Serving Southern CaliforniaCSLB #1040337 · (888) 666-8224
Bathroom Remodeling in Burbank

Bathroom Remodelingin Burbank, CA

Quick answer

Bathroom remodeling in Burbank splits into two permit tiers. Swapping plumbing fixtures, electrical fixtures or ducting is Tier 1 work with no plan check, while moving walls or enlarging the room is Tier 2 and goes through plan check. About 70 percent of Burbank homes predate 1980, so lead-safe demolition matters too.

CSLB #1040337 5.0 on Houzz Free written estimate
Primary bathroom: freestanding white tub, bathroom remodeling in Downtown Burbank, Burbank
CSLB #1040337Verified at CSLB
5.0 on HouzzRated by clients
Written proposalsScope and price in writing
Licensed specialistsSubcontractors do the work

Burbank bathrooms mostly belong to houses built in a hurry. The Census estimate behind this page counts 46,928 homes in the city, and about 22.9 percent date from the 1940s, when defense-worker housing for the Lockheed plant, often Minimal Traditional houses in a few repeated plans, filled the west and southwest side, according to the City's 2009 Historic Context Report. The same estimate says 56.7 percent of occupied homes are rented, so a hall bath here is as likely to belong to a landlord as to an owner.

Below we cover how the City's two permit tiers treat a bathroom, what lead-safe demolition means in an older house, the soft-story schedule that touches apartment buildings and the work hours that set your calendar. Prices and the phase timeline are on our bathroom remodeling page, and the other trades we run here are on the Burbank overview.

Bathroom Remodeling rules in Burbank

What Burbank's Building & Safety pages say about bathroom work

  • Plumbing fixtures, re-piping, electrical fixtures and mechanical ducting are Tier 1 permits that the City lists for single-family homes. The City puts alterations and additions in Tier 2, which needs plan check.
Sources for these rules
  1. burbankca.gov: building permits
A wooden table with rolled blank drawings, a clipboard, bathroom remodeling near Burbank in Toluca Lake
Wet walls

Shower waterproofing and exhaust fans in a Burbank bathroom remodel

Most of a bathroom's life is decided by the part nobody photographs. A shower rebuilt on a sloped mortar pan, with a continuous waterproof membrane that climbs the walls and covers the curb, will outlast the tile on top of it. The pan should hold water in a flood test before any tile goes down, so ask for that test to be photographed and dated in your project file.

The ceiling has rules too. The state's 2025 Energy Code took effect January 1, 2026, the same day Burbank's local amendments to the 2025 building code did, and the Energy Commission's summary calls for local mechanical exhaust in a bathroom, either continuous or demand controlled. At least one bathroom light must be on an occupancy or vacancy sensor, and a light built into the fan must switch separately from the fan.

Climate helps less than you might hope. NOAA's 1991 to 2020 normals for Hollywood Burbank Airport show only 13.91 inches of rain a year, but steam does not need rain, and a closed bathroom with a weak fan keeps painted walls damp in every season. Confirm on the plans that the duct runs to the outdoors, not into the attic.

  • Will the pan be flood tested, and will the test be photographed?
  • Does the fan duct to the outside, and which switch runs it?
  • Which membrane system covers the walls, and how high does it go?
A bathroom shower pan being waterproofed: red waterproofing membrane painted over cement board on the wal, bathroom remodeling in Burbank Town Center, Burbank
Wartime houses

Bathroom renovation in a 1940s Burbank house: one bath and unknown pipes

Burbank's boom decades left a lot of one-bath houses. Population rose from 16,662 in 1930 to 34,337 in 1940 and 78,577 in 1950, according to the census table on Wikipedia, and the Census estimate counts 10,754 homes from the 1940s alone. The City's Historic Context Report says Magnolia Park began in 1923 on lots averaging 50 by 135 feet and was built up piecemeal by individual owners, and Wikipedia calls its homes mostly 1940s houses for veterans.

Piecemeal building means two neighbors' bathrooms can hide different pipe, framing and tile beds, and nobody can say what is in a given wall until it is open. Before a quote becomes a price, we ask for a camera look down the drain line and a check of the floor around the toilet flange for soft wood. Then we write a unit price for rotted framing into the proposal, so a surprise changes the total by a known amount.

A bath in a house of this age is often small by today's standards, and resizing it is a bigger decision than choosing tile. A wall that moves is a framing change, which the City's permit page places in its plan-check tier. The next section explains where that line falls.

A 1930s Los Angeles bathroom opened to the studs with a cast-iron tub, bathroom remodeling near Burbank in North Hollywood
Permits

Do you need a permit for a bathroom remodel in Burbank? Tier 1 and Tier 2

The City's permit page sorts work into two tiers. Tier 1 is simple repair and maintenance that needs no plan check and can generally be had over the counter, and for single-family homes some Tier 1 permits are issued online through the Burbank Online Permits portal. The City's examples include plumbing fixtures, re-piping, water heaters, electrical fixtures and mechanical ducting. Tier 2 needs plan check or zoning approval, and the City lists alterations and additions there.

The single-family exempt-work sheet names tiling, cabinets, counter tops and similar finish work as exempt from a building permit, with a warning that setbacks and other rules can still apply. So retiling over the same walls or replacing a vanity top sits on the exempt list, and a tub-to-shower swap in the same footprint reads like fixture work. The City's before-and-after remodel handout had no readable text and we found no fee schedule, so ask Building & Safety at (818) 238-5220 how your exact scope is classified before the plumber prices it.

Do not skip the permit to save a week. Section 9-1-1-109.4 of the City's building ordinance requires an investigation fee equal to the permit fee, collected on top of it, when permit work starts without one. Once a permit issues, inspections are requested one day ahead through the portal, and the permit becomes void if work has not started within 180 days.

The walk-in counter is open Monday to Thursday 8:00 a.m. to 3:30 p.m. and Friday 8:00 a.m. to 3:00 p.m., closed noon to 1:00 p.m.

Hall bathroom with a tub-to-shower conversion: white subway tile to the ceiling, clear glass panel, bathroom remodeling in Magnolia Park, Burbank
Lead-safe work

Lead-safe bathroom demolition in a pre-1978 Burbank home

About 70 percent of Burbank's housing units were built before 1980 and about 37 percent before 1950, so the federal Renovation, Repair and Painting rule will reach many bathroom jobs. It covers paid renovation in housing built before 1978. Under 40 CFR 745.83, minor repair is exempt only where 6 square feet or less of painted surface per room is disturbed indoors, and jobs in the same room within 30 days count as one job.

Gutting a bathroom disturbs far more than 6 square feet, because painted plaster, trim and a door casing all count. Ask whether the firm doing demolition is EPA lead-safe certified, how the work area is sealed and how debris leaves the house. Plastic at the doorway, a covered path to the dumpster and a wet cleanup each day cost less than clearing dust out of the bedrooms.

Burbank adds a paperwork item. Section 9-1-11-1012 requires a Waste Management Plan with applicable permit applications, and the exemptions include work that needs no permit, projects needing only a plumbing, electrical or mechanical permit and residential alterations that do not increase conditioned area. A bath refresh may fall into one of those, while a bath built into new floor area does not, so ask which applies.

A hallway floor protected with ram board and plastic sheeting outside a bathroom door, bathroom remodeling near Burbank in Universal City
Apartments and condos

Bathroom remodeling in Burbank apartments, condos and soft-story buildings

Renters hold 24,887 of Burbank's 43,890 occupied homes, and 20,254 units sit in buildings of five or more. Many bathrooms here therefore belong to a landlord or sit inside an association, and a condo job adds a third party. Ask the management office about work hours, insurance certificates and where trucks may park before you book trades.

Burbank also runs a mandatory soft-story seismic retrofit ordinance for vulnerable residential buildings. Its compliance order is dated January 10, 2025, with engineered plans due by January 11, 2027, permit and construction start by January 10, 2029 and completion by January 10, 2030. If you own a building that is subject to it, ask whether structural work is coming before you schedule new bathrooms, because the same walls and floors could be opened twice.

A unit with one bathroom needs a written plan for the tenant: which days the room is out, who provides a shower in the meantime and how any change to those dates will be communicated. We did not research Burbank's tenant notice rules, so confirm them with the City or an attorney, and write the schedule down either way.

A compact updated rental apartment bathroom with a white tub-shower combination, white subway tile, bathroom remodeling in Media District, Burbank
Bigger scope

Adding or enlarging a bathroom in Burbank: plan check, floor area and hillside permits

A bathroom that grows into a closet or a bedroom changes walls, and an addition that adds floor area is Tier 2 work needing plan check and zoning approval. In R-1 zones the zoning code sets a floor area ratio of 0.4 on the first 7,500 square feet of lot, and the ratio counts every enclosed structure, including a backyard studio. A new bath inside the existing walls adds no floor area, while a bump-out uses some of the allowance.

Plan check runs on the ProjectDox electronic system, and a complete application emailed to eplancheck@burbankca.gov brings an invitation to set up an account for the project. Drawings for a relocated bath show the fixture layout, the drain and vent path and the exhaust fan, with an engineer's letter if a joist is cut.

In the foothill area north of Sunset Canyon Drive and Bel Aire Drive, a Hillside Development Permit is needed before a building permit for any grading, extension beyond the setback lines, height over 16 feet or more than 3,000 square feet of floor area. If a bath project on a hillside lot could trip one of those, check with Planning at (818) 238-5250 before design starts.

Small powder room with a patterned cement tile floor, pedestal sink, bathroom remodeling near Burbank in Sun Valley
Listed properties

Is a Burbank house in a historic district? Bathrooms and the 16 listed properties

No. The City's list of historic properties, dated May 22, 2026, names 4 National Register properties, 2 California Register properties and 11 local Burbank Historic Resources, with one property on both registers, and it names no historic district. That makes 16 individual properties, such as the Rock House on East Olive Avenue and the Mentzer House on West Olive Avenue. For most owners the preservation question never arises, and a bathroom is interior work.

If yours is a listed house, ask Planning at (818) 238-5250 whether anything needs review before you change windows, vents or other exterior parts. The City's Historic Resource Management Ordinance sets the procedure, and we did not read its text, so we state no rule. The Rancho Area has its own review board for Development Review projects, so a bath that comes with an exterior change on a Rancho lot deserves an early call too.

MDG Builders, CSLB #1040337, is the general contractor on a bathroom job: we design, pull the permit and schedule the work, while licensed plumbing, tile, electrical and glazing subcontractors do the field work, and you can ask each one for a license number and certificate of insurance. Our post on how general contractors use subcontractors explains who answers to whom.

Walk-in shower with a recessed tile niche, small mosaic floor tile, bathroom remodeling in McCambridge Park, Burbank
Recent work

Bathroom details from Burbank and nearby remodels

Three views of the pan, tile and fixtures behind a bathroom remodel in Burbank and neighbors such as Toluca Lake and North Hollywood. Tap a photo to enlarge it.

Small powder room with a patterned cement tile floor, pedestal sink, bathroom remodeling near Burbank in Sun Valley
Walk-in shower with a recessed tile niche, small mosaic floor tile, bathroom remodeling in McCambridge Park, Burbank
Floating oak vanity with a stone top, undermount sink, round mirror and two wall sconces, bathroom remodeling near Burbank in Glendale
Cost

What bathroom remodeling costs around Burbank

Our bathroom remodeling page puts a refresh near $9,000 to $18,000, a same-layout midrange remodel near $25,000 to $40,000 and a primary bath near $50,000 to $85,000 and up. The anchor is Remodeling magazine's 2025 Cost vs. Value report for Los Angeles, where a midrange bath remodel costs $27,143. Those are regional figures, not Burbank quotes, and permit costs are separate lines because we found no City fee schedule; our bathroom cost guide shows how to read the ranges. A bath often travels with other work, so see kitchen remodeling in Glendale, windows in Burbank and the Burbank ADU page. Next door, Glendale bathrooms, Los Angeles bathrooms and Pasadena bathrooms follow their own cities' rules, and the Glendale overview lists that city's trades.

Bathroom Remodeling price ranges used for Burbank estimates (Southern California sources, before permits)
What it coversTypical range
Refresh in the same layout: new vanity, toilet, fixtures, lighting, paint, limited tile$9,000 to $18,000
Mid-range full remodel in the same layout: new shower or tub, tile, vanity, fixtures, lighting and fan$25,000 to $40,000
Upscale or primary bath: stone, custom glass, freestanding tub, double vanity, heated floor$50,000 to $85,000 and up
Adding a new bathroom$60,000 to $120,000
FAQ

Burbank bathroom permit, lead and cost questions

Do I need a permit for a bathroom remodel in Burbank?

Usually for plumbing, electrical or framing work, and not for pure finish work. Burbank lists plumbing fixtures, re-piping, electrical fixtures and mechanical ducting as Tier 1 permits with no plan check, and its exempt-work sheet names tiling, cabinets and counter tops. Walls that move are Tier 2. We could not read the City's bath handout, so confirm your scope with Building & Safety.

Do I need a building permit to change a toilet in Burbank?

Plan on one if the work touches plumbing. The City's Tier 1 list names plumbing fixtures, which is where a replacement most likely falls, but we found no page that mentions a plain toilet swap and no fee schedule. Ask Building & Safety at (818) 238-5220 before the plumber books a day, and ask whether the permit can be pulled online.

How much does a bathroom remodel cost in Burbank?

Regional figures put a refresh near $9,000 to $18,000 and a same-layout midrange remodel near $25,000 to $40,000. Remodeling magazine's 2025 Cost vs. Value report for Los Angeles lists a midrange bath remodel at $27,143. We found no Burbank price survey and no City fee schedule, so a written proposal after a site visit is the real number.

What order should you remodel a bathroom?

Demolition comes first, then rough plumbing and electrical, framing repairs, the shower pan and its flood test, waterproofing, tile, and finally fixtures and paint. In Burbank, inspections are requested one day ahead through the City's online portal and rough work is inspected before it is covered. Tile laid before the pan is tested can hide a leak for years.

Where do you shower when your bathroom is being remodeled?

Plan on a gap, because most remodels take the room out of service for the demolition, plumbing and tile days. In a one-bath house, decide before demolition where the household will shower, and in a rental, put the schedule in writing. Burbank allows work Monday to Friday 7:00 a.m. to 7:00 p.m. and Saturday 8:00 a.m. to 5:00 p.m., with none on Sundays.

Is remodeling a bathroom worth it?

A midrange remodel recoups the most. Remodeling magazine's 2025 Cost vs. Value report for Los Angeles puts the midrange bath at 89.6 percent of cost recouped at resale and the upscale bath at 42.3 percent. Those are Los Angeles averages, not Burbank sales, and resale depends on the rest of the house, so use them as a guide to scope, not a promise.

What is the difference between a bathroom remodel and a bathroom renovation?

Contractors use both words loosely, and Burbank's permit rules look at the work, not the word. A renovation usually updates what is there, such as tile and fixtures, while a remodel usually changes the layout. The line that matters here is whether walls or plumbing locations move, which is Tier 2, or fixtures swap in place, which is Tier 1.

Do I need a licensed contractor to remodel a bathroom in Burbank?

For work over $1,000, yes. California limits unlicensed minor work to $1,000 including labor and materials, and the exception does not apply if the job needs a permit or the person hires any worker. Burbank's Section 9-1-1-105.8 also issues permits only to licensed contractors, with an owner-builder exception for limited building types. Check any license on the CSLB website.

Do I need lead-safe work for a bathroom remodel in an older Burbank house?

Yes, if a paid firm disturbs more than 6 square feet of painted surface in a bathroom of a pre-1978 home, and a gut remodel almost always does. EPA's rule then requires a lead-safe certified firm. About 70 percent of Burbank's homes predate 1980, so ask for the firm's certification before demolition starts.

Free estimate

Tell us about your Burbank bathroom

Send the neighborhood, the year the house was built, whether you own or rent out the unit and whether any wall needs to move, and we will plan the site visit around those answers.

Free estimate · A real person answers · (888) 666-8224

Call (888) 666-8224