Tarzana, CA · Serving Southern CaliforniaCSLB #1040337 · (888) 666-8224
Roofing in Hemet

Roof Repairin Hemet, CA

Quick answer

Roof repair in Hemet turns into permit work once a re-roof reaches 100 square feet, and the City lists a flat $250 fee for a single-family reroof under 4,000 square feet. Wood shakes are barred, designated fire hazard areas need Class A roofing, and every new application now goes through the City's Tyler online portal.

CSLB #1040337 5.0 on Houzz Free written estimate
Barrel clay tile roof on a Spanish-style California house with white stucco walls and an arched entry, roofing in Hemet Public Library, Hemet
CSLB #1040337Verified at CSLB
5.0 on HouzzRated by clients
Written proposalsScope and price in writing
Licensed specialistsSubcontractors do the work

Hemet began as a townsite after the Lake Hemet Company and the Hemet Land Company formed on January 27, 1887, the first train arrived in April 1888 and residents voted to incorporate on January 11, 1910. Most roofs here are far younger than that. Census Bureau ACS 2024 five-year estimates count 35,345 housing units with a median year built of 1984, and 14,680 of them, about 41.5 percent, predate 1980. The City's history page dates the big change to the early 1960s, when Sierra Dawn, the country's first mobile home subdivision with individually sold lots, was followed by other mobile home parks and retirement developments.

On a roofing job, MDG Builders (CSLB #1040337) writes the scope, files the permit and keeps the schedule, and a licensed C-39 roofing subcontractor does the tear-off and the installation. The roofing page holds our sourced prices, the Hemet overview lists every trade we manage here, and the roofing guides for Menifee and Temecula show how two other Riverside County cities treat the same work. San Jacinto, Perris, Beaumont and Banning are separate cities, and East Hemet, Valle Vista and Winchester sit outside the city limits, so ask the right building department before assuming Hemet's rules reach your address. The Building & Safety Division issues permits inside the city. The City's own code page refused our request, so code text below comes from GoCodebook, a third-party mirror updated October 19, 2026, and each section should be confirmed with the City.

Roofing rules in Hemet

What Hemet's fee schedule, Building Code amendments and interface rules say about roofs

  • Hemet requires a permit for re-roofing of 100 square feet or more.
  • The adopted Building Code amendment bars wood shake and wood shingle roofs on a building (a home that already has shakes may be re-roofed with a listed Class A assembly), and says roof coverings on buildings in a designated fire hazard area must be Class A (text read in GoCodebook's verbatim copy of the Hemet Municipal Code, a third-party mirror updated 2026-10-19, because the City's own code page at hemetca.gov/104/Municipal-Code returned HTTP 403).
  • Under HMC 14-420 for interface and fire hazard severity areas, noncombustible Class A roofing is required in all fire hazard severity zones, open ends of tile roofs must be sealed with noncombustible material, individual roof and gable vents may not exceed 144 square inches, and undereave vents belong near the fascia rather than the wall (text read in GoCodebook's verbatim copy of the Hemet Municipal Code, a third-party mirror updated 2026-10-19, because the City's own code page at hemetca.gov/104/Municipal-Code returned HTTP 403).
  • Hemet adopted an expedited process for small residential rooftop solar under Government Code 65850.5 (HMC Article XII), so a roof job that adds panels is a separate solar permit with its own streamlined review (text read in GoCodebook's verbatim copy of the Hemet Municipal Code, a third-party mirror updated 2026-10-19, because the City's own code page at hemetca.gov/104/Municipal-Code returned HTTP 403).
  • Roof design wind for Hemet is 110 mph for Risk Category II (100 mph Category I, 115 mph Categories III and IV) at Exposure C per the City's design page.
Sources for these rules
  1. hemetca.gov: 8914
  2. gocodebook.com: division 3 california building code
  3. gocodebook.com: division 2 wildland interface area requirements
  4. gocodebook.com: article xii small residential rooftop mounted solar systems
  5. hemetca.gov: Design Information
A wooden table with rolled blank drawings, a clipboard, roofing near Hemet in East Hemet
Permit and fee

Does a roof repair or re-roof need a permit in Hemet, and what does it cost?

A re-roof of 100 square feet or more needs a permit, according to the City's Do I Need a Building Permit handout, and Code Compliance lists re-roofs among the jobs that draw an administrative citation when they are done without approval. The Master Schedule of Fees, amended October 28, 2026, shows a flat $250 for a single-family reroof or roof overlay under 4,000 square feet. The schedule says that line includes inspection and plan review but not permit processing, Planning review, technology fees or charges collected for other agencies, so the total at the counter can run higher.

A small patch sits in a gray area. The handout's threshold is 100 square feet and it calls its own list incomplete, so phone (951) 765-2475 before assuming a leak repair is exempt. Work that starts before the City says the job card and plans are ready counts as work without a permit and may draw a special investigation fee, so the permit number should exist before the dumpster arrives.

Ask the roofer to price the permit and any extra City fees as separate lines.

A ladder leaning against the eave of a stucco house with a clay tile roof and a closed clipboard hanging , roofing in Weston Park, Hemet
Filing

Where do I file a Hemet roofing permit, and why do the City's own pages disagree?

Online, through the Tyler Enterprise Permitting and Licensing portal. Effective August 11, 2026, the Building & Safety and Planning pages say every new application goes through it for uploads, tracking and inspection scheduling, while permits already in progress stay in the older TrakiT system until they are migrated. The Plan Review page adds that resubmittals must be electronic and that nothing is issued until the plans carry every department's wet signature, outside releases are in and fees are paid.

Several details conflict. The Building & Safety page gives counter hours of Monday to Friday, 7:30 am to 5:30 pm, yet the Plan Review page says the over-the-counter small project counter runs Monday to Thursday, 7:30 am to 5:00 pm, and asks you to arrive before 4:30 pm. Building & Safety sits in City Hall at 445 E Florida Avenue, but some older handouts print 510 E Florida Avenue, the Fire Department's administration address. Phone numbers differ too: (951) 765-2475 is on the Building & Safety page, while (951) 765-2450 heads some guides. Call first and ask which counter is open that day.

A composition shingle roof replacement in progress: half the roof covered with new gray architectural shi, roofing near Hemet in Estudillo Mansion
Roof type

Do Hemet roofs have to be Class A, and are wood shakes allowed?

Wood shakes are out. The adopted Building Code amendment bars wood shake and wood shingle roofs on a building, although a home that already has shakes may be re-roofed with a listed Class A assembly, and roof coverings on buildings in a designated fire hazard area must be Class A. That is a narrower statement than Class A for every roof in the city, so ask the counter whether your address is in a designated area before choosing a product.

In the interface and fire hazard severity areas the details get specific. Section 14-420 calls for noncombustible Class A roofing in all fire hazard severity zones, open ends of tile roofs sealed with noncombustible material, individual roof and gable vents of no more than 144 square inches and undereave vents placed near the fascia instead of the wall. Those items change how a ridge vent, a tile closure or an eave is detailed, so they belong in the written scope whenever the house is near a zone.

Roof ridge with lapped ridge-cap shingles and a continuous ridge vent in charcoal gray, clear sky, roofing in Hemet Fire Department Station, Hemet
Fire zones

Is my Hemet roof in a Very High fire zone, and did the 2025 maps change it?

We cannot place your lot. The adopted Public Safety Element, a file dated February 28, 2025, says several Very High zones lie inside Hemet, all in the Local Responsibility Area and in the southern half of the City. It lists areas south of Domenigoni Parkway, east of South State Street, west of California Avenue in the Four Seasons neighborhood and north of East Florida Avenue (Route 74) along the northeastern edge, and counts about 1,500 parcels worth an estimated $900,000,000 in a Very High zone.

The element also places Four Seasons in two spots, west of California Avenue in one sentence and along the eastern boundary above Route 74 in another, so a parcel lookup should settle it, not a paragraph. The City's fire zone page says CAL FIRE's 2025 maps were not drawn by the City, cannot be changed by it and are proposed. It expects updated boundaries, 100 feet of defensible space in Very High zones, Wildland-Urban Interface building codes for new construction and seller disclosure of zone status. Whether Hemet has adopted the 2025 maps by ordinance is unverified, so ask Fire Prevention before materials are ordered.

Put the fire zone answer, with its date, in the contract file.

A hillside Southern California neighborhood of homes with tile and composition roofs among dry chaparral , roofing near Hemet in San Jacinto City Hall
Roof age and weather

How old are Hemet roofs, and what do 121 days above 90 degrees and Santa Ana wind do to them?

Roof age follows the neighborhood. General Plan 2030 says the Greater Downtown District grew from the late 1890s into the early 1930s with mostly one-story homes 12 to 15 feet tall, and Wikipedia's census table shows 5,416 residents in 1960 and 12,252 in 1970, up 126.2 percent. ACS 2024 counts 1,300 units from 1949 or earlier, 1,599 from the 1950s, 4,114 from the 1960s and 7,667 from the 1970s. The 2019 Housing Element, on older ACS data, put the 1970s at 25.7 percent of units where the 2024 table gives 21.7, and we use the newer one. We found no Hemet roof survey, so we print no lifespan in years.

NOAA's 1991 to 2020 normals for the Hemet station give about 121 days a year at or above 90 F and about 41 at or above 100 F, with 11.75 inches of rain, 8.53 of it from December through March. The City's design page lists 110 mph Risk Category II wind at Exposure C and no snow load, and its Climate Vulnerability Assessment says Santa Ana winds frequently exceed 40 mph. We found no City nailing rule, so ask the roofer to state the wind rating of the assembly.

Ask for any deck repair as its own priced line before work starts.

Plywood roof decking covered with synthetic underlayment and drip edge, a ridge line against a clear sky, roofing in Hemet Fire Department Station, Hemet
Mobile homes

Who handles a roof on a mobile home or a park home in Hemet?

Ask first, because Hemet runs its own program. The City took over enforcement of the state Mobilehome Parks Act and Special Occupancy Parks Act from the State Department of Housing and Community Development (HMC 14-361 and 14-362) and delegated it to the planning director, building official and police chief. Its Mobile Home Park Inspections page says state law requires it to inspect park common areas, buildings, equipment, utilities and each individual lot.

That reaches a lot of roofs, because 8,257 Hemet units, 23.4 percent with a margin of error of plus or minus 750, are mobile homes. A mobile home may be lived in only inside a park, an approved TR-20 independent mobile home subdivision or a travel trailer park (HMC 90-653). The pages we read do not say whether a park home re-roof goes through Building & Safety or the park inspection staff, so ask both, and ask park management for its own rules. The Mobile Home Rent Review Commission, created by voter initiative in 1979, meets only on request to hear tenant petitions; we read nothing tying it to roof work.

Finished charcoal-gray shingle roof on a suburban two-story house with new gutters and a few solar panels, roofing near Hemet in San Jacinto
Cost and hiring

How much does roof replacement cost in Hemet, and how do I hire a roofer?

No Hemet price survey turned up, so the figures here come from Los Angeles and an Inland Empire bid can differ. Angi's Los Angeles guide, updated July 31, 2026, reports a typical $10,256 to $24,963 around a $17,271 average, with asphalt at $4 to $12 a square foot, tile at $7 to $15 and metal at $7 to $16, plus $1,000 to $3,000 for tear-off and $500 to $1,000 to detach and reset solar panels. Remodeling magazine's Cost vs. Value 2025 report puts a Los Angeles asphalt roof at $36,417 and a metal roof at $62,069 without naming the roof size. For a typical house we plan roughly $10,000 to $25,000 in asphalt, $15,000 to $37,000 in tile and $20,000 and up in metal.

Roofing is CSLB class C-39. California law requires a signed written contract, limits a down payment to $1,000 or 10 percent of the price, whichever is lower, and gives a buyer three business days to cancel, five if the buyer is 65 or older. Panels need their own permit, because Hemet adopted an expedited process for small residential rooftop solar under Government Code 65850.5. Check credentials with our license guide, read how general contractors use subcontractors and compare prices in the California roofing cost guide.

Roofing material samples on a driveway: a gray shingle, roofing in Hemet Fire Department Station, Hemet
Recent work

Roofing photos from Hemet and nearby communities

Roofing scenes tied to Hemet places such as Downtown Hemet, Weston Park, Cawston Community Park and Hemet Valley Mall, and to nearby communities such as San Jacinto, East Hemet, Winchester and Valle Vista, from tear-offs and underlayment to tile repair and flashing work.

Close-up of a concrete tile roof with metal flashing along a wall and a roof vent, neatly cut tiles, roofing near Hemet in Winchester Farms Marketplace
Close-up of a roof valley with metal flashing, new shingles cut cleanly along it, roofing in Hemet Fire Department Station, Hemet
Close detail of a clay tile roof where a few broken tiles have been replaced with matching new tiles, roofing near Hemet in Green Acres
Cost

Where these Hemet roof figures come from

Every roofing price, with its source and date, sits in the table on the roofing page. A new roof often comes with other exterior work, and the Hemet rules for it are on the fencing page, the painting page and the kitchen remodeling page. For a neighboring Inland Empire rulebook to set beside Hemet's, read the roofing guide for Moreno Valley.

Roofing price ranges used for Hemet estimates (Southern California sources, before permits)
What it coversTypical range
Asphalt shingle, typical single-family roof$10,000 to $25,000
Concrete or clay tile$7 to $15 per sq ft
Metal$7 to $16 per sq ft
Remodeling Cost vs. Value 2025, Los AngelesAsphalt $36,417.
metal $62,069.
ExtrasTear-off $1,000 to $3,000.
solar detach and reset $500 to $1,000.
FAQ

Hemet roofing questions, answered

Do I need a permit to replace my roof in Hemet?

Yes, once the re-roof covers 100 square feet or more. The City's permit handout lists it, and the fee schedule shows a flat $250 for a single-family reroof under 4,000 square feet, before processing, Planning and other agencies' charges. Applications go through the Tyler online portal, so the roofer should hold the permit number before work starts.

How much does a new roof cost in Hemet?

We found no Hemet survey. Angi's Los Angeles guide gives a typical $10,256 to $24,963 and an average of $17,271, and we plan about $10,000 to $25,000 for asphalt, $15,000 to $37,000 for tile and $20,000 and up for metal. Roof size, tear-off, decking and solar reset move the number, and a written proposal sets the price.

What is the 25% rule for roofing?

We found no Hemet code section or City handout that uses 25 percent. The number in the City's permit handout is 100 square feet: a re-roof at or above it needs a permit. Ask Building & Safety how it measures roof area, because that decides whether a partial replacement crosses the line.

Does Hemet require a Class A roof?

In designated fire hazard areas, yes. The adopted Building Code amendment requires Class A roof coverings there, bars wood shakes on any building, and Section 14-420 calls for noncombustible Class A roofing in all fire hazard severity zones. It is not a citywide rule for every roof, so ask the counter whether your address is in a designated area.

Is my Hemet roof in a fire hazard zone?

We cannot say for your lot. The Public Safety Element describes Very High zones in the southern half of the City, and the City calls CAL FIRE's 2025 maps proposed. Whether Hemet adopted them is unverified, so ask Fire Prevention for your parcel and put the answer in your contract file.

What is the difference between roof repair and roof replacement for permits in Hemet?

The City's handout sets the line at a re-roof of 100 square feet or more and calls its list incomplete, so a small repair may not need a permit but we cannot promise it. A full roof replacement always crosses 100 square feet. Phone Building & Safety at (951) 765-2475 before skipping a permit on any repair.

Can a general contractor do roofing in Hemet?

Yes, as the manager of the job: MDG Builders (CSLB #1040337) writes the scope and runs the permit while a licensed C-39 roofing subcontractor does the work. Ask for that subcontractor's license number and certificate of insurance, then confirm the license on the CSLB site before the crew is scheduled.

How do I check a roofing contractor's license in California?

Type the license number into the Contractors State License Board's lookup, confirm that class C-39 is active and make sure the name matches the contract. Hemet also lists a City of Hemet business license and a valid CSLB license among its encroachment permit requirements, so request proof of both for any job touching the right of way.

Who permits a roof on a mobile home in Hemet?

We could not confirm it. Hemet enforces the state Mobilehome Parks Act itself and inspects each park lot, but the pages we read do not say whether a park home re-roof is a Building & Safety permit or a park inspection item. Ask both offices and the park management before you hire.

What is the best time of year to replace a roof in Hemet?

Summer is driest, with only 0.05 to 0.19 inch of rain from June through August against 8.53 inches from December through March, but about 41 days a year reach 100 F. Late spring and early fall trade a little rain risk for cooler decks, so ask how the crew handles heat and Santa Ana gusts.

Free estimate

Ask for a roof inspection in Hemet

Tell us the neighborhood, whether it is a house or a mobile home, the roof covering, the age of the home and where water shows up inside. Before we call back we check the 100 square foot permit line, the fire zone question and which office handles your address.

Free estimate · A real person answers · (888) 666-8224

Call (888) 666-8224