General Contractor in Inglewood, CA
A general contractor in Inglewood plans around three things the city's own documents stress: aircraft noise under LAX, the Newport-Inglewood Fault, and housing that is 78.1 percent pre-1980 and rated Very Heavy for termites. MDG Builders, CSLB #1040337, manages all eleven trades here and links each City source.
Inglewood home work, sorted into eleven trade guides
Each guide below applies Inglewood's own handouts, code sections and housing to one kind of job, with the City pages linked. Pick the trade closest to what you want built.

Kitchen Remodeling in Inglewood
Four permits for a non-structural kitchen, the dimensioned plan sheet, valuation-based fees, walls and engineers, and the LAX presale report.
See Inglewood kitchen remodeling →
Bathroom Remodeling in Inglewood
Permit handout, a Very Heavy termite rating, 1950s plumbing, presale report checks and work hours for Inglewood bathrooms.
See Inglewood bathroom remodeling →
ADU Construction in Inglewood
Three conflicting size rules, HCD's 2025 findings, the fault zone plan check, garage conversions and the recorded covenant in Inglewood.
See Inglewood ADU construction →
Room Additions in Inglewood
Fault zone geological plan check, R-1 yard limits, the City's addition plan list, school fees and old-house tie-ins in Inglewood.
See Inglewood room additions →
Roofing in Inglewood
What Inglewood's re-roof handout asks for, the cool roof thresholds, termite and fault notes, and how the LAX presale report touches a roof.
See Inglewood roofing →
Windows in Inglewood
LAX sound insulation program, the City's window permit handout, U-factor and egress limits and older-house retrofit questions in Inglewood.
See Inglewood window replacement →
Flooring in Inglewood
Termite-rated subfloors, the LAX presale report, 1940s and 1950s slabs and raised floors, asbestos and lead checks, permit gaps and rental rules.
See Inglewood flooring →
Painting in Inglewood
Lead-safe rules for pre-1978 houses, stucco prep, no building permit for paint, overlay questions and sourced Los Angeles prices.
See Inglewood painting →
Concrete in Inglewood
Driveway width and curb permits, wall and fence limits, the fault zone and urban runoff, old 1940s and 1950s slabs, and costs by the square foot.
See Inglewood concrete work →
Decks in Inglewood
An exemption list with no deck line, termite damage and deck repair, yard and patio cover limits, ledger and footing details, guards and wood versus composite costs.
See Inglewood deck building →
Fencing in Inglewood
Four feet in front yards, open-work above two, eight feet in side and rear yards, a permit over four feet and the ornamental metal exception.
See Inglewood fencing →Why do LAX, the fault and 1950s tract houses decide how an Inglewood project is planned?
Start with the houses. The Centinela-Inglewood Land Company began developing the townsite in 1887, and the city incorporated in 1908 with about 1,200 residents. The Inglewood Public Art site describes 1920 to 1925 as the fastest growth of any American city, Hollywood Park opened in 1938, and the Air Force's Western Development Division set up on Manchester Boulevard in 1954, the same years tract neighborhoods such as Inglewood Knolls (1953 to 1954) were being laid out. The Census Bureau's 2020 to 2024 estimates count about 40,072 housing units: 78.1 percent were built before 1980, 16.1 percent in 1939 or earlier and 18.3 percent in the 1950s, which is the biggest decade. Roughly 37.6 percent are single-family detached, 41.7 percent sit in buildings of five or more units, and 63.8 percent of households rent. The City's Housing Element flags lead-based paint on pre-1978 homes and records 23 substandard properties in a staff survey. So a kitchen remodel, a bathroom remodel, new flooring or a repaint usually means opening up a stucco bungalow or ranch house with original plumbing, wiring and paint, and often a landlord or association to satisfy first.
Permits come second, and Inglewood publishes more per-trade paperwork than most cities. The Building Safety Division sits inside Development Services and answers at (310) 412-5294. Most projects need a Planning project number first, plans are filed online through Accela Citizen Access, and inspections are requested through the City's OpenGov portal. Per the City's handout, expedited plan check costs one and a half times the permit fee, work that starts before the permit is issued is charged double fees, and most projects are expected to clear within three review cycles. One wrinkle needs a phone call: the Municipal Code on eCode360 still lists the 2019 California Building Code and the 2016 California Residential Code, while the City's current handouts for windows, pools and grading cite the 2022 codes. Ask Building Safety which edition governs your job before the plans are drawn. Two jobs on this list come with plain printed numbers, a fence capped at 4 feet in a front yard with open-work above 2 feet, and a concrete driveway that must be Portland cement concrete, 10 to 12 feet wide for one lane and 18 to 22 for two.
The ground and the sky come third. The Safety Element says several LAX approaches pass over most of the city, and every seller must obtain a presale report that states the property's LAX impact level and any sound insulation already installed; the City's Residential Sound Insulation program, funded by FAA and airport grants, covers eligible owners inside the 2020 noise contour, which affects window replacement before you buy a single sash. The same document calls the Newport-Inglewood Fault active and running through the city. In the County's copy of the State's fault map, an Alquist-Priolo boundary touched 8 of 67 grid points we sampled, all in the northern and central parts, and a liquefaction zone touched 2 of 67. Those are sample points, not parcel maps, so confirm your lot with the City. Projects inside the fault zone need a geological plan check, which matters most for a room addition. The same sources show no fire hazard severity zones and no mapped floodplain, though the Safety Element still warns about urban flooding. The City's code table rates termite damage Very Heavy, so a deck or any wood touching soil deserves inspection, and a roof replacing more than half the surface triggers cool roof requirements.
Growth projects carry the loudest warning. For an ADU, three sources disagree: Article 35 of the zoning code sets a 500 square foot minimum, the Planning Division's standards sheet lists 150, and California's housing department wrote in May 2025 that the ordinance conflicts with state law in at least 14 ways. We could not confirm whether the City has amended it since, so state law and a call to Planning come before any drawing. Crews may work from 7:00 a.m. to 8:00 p.m. every day, holidays included, according to the City's Inspections page. MDG Builders is the general contractor of record: we write the scope, steer plan check, schedule licensed specialty subcontractors and walk the finished work with you, and you can ask for each sub's license and certificate of insurance. Our article on how subcontractors fit in explains the model, and checking a license takes five minutes on the State's site. Hawthorne, Lawndale, Gardena, El Segundo and Culver City are close by and use the same crews, while the nearest finished hubs are Los Angeles and Torrance.

- The City's code table rates termite damage Very Heavy, with zero snow load and zero frost depth.
- The presale report must state a property's LAX impact level and any sound insulation, and it stays valid for six months.
- An Alquist-Priolo boundary appeared at 8 of the 67 grid points we sampled across Inglewood, all in the north and center.
- NOAA's LAX station logs only 4.8 days a year at or above 90 degrees F and 12.23 inches of rain.
- The City lists construction hours as 7:00 a.m. to 8:00 p.m., seven days a week and on holidays.
- All 67 sampled points came back Non-Wildland in CAL FIRE's local zone layer, so wildfire rules rarely apply here.
Cities near Inglewood we also build in
Inglewood construction questions homeowners ask before hiring
Where do I apply for a building permit in Inglewood?
Apply through the Building Safety Division of Development Services, but get a Planning project number first, since most projects need one before Building Safety accepts a submittal. Plans go in online through Accela Citizen Access. Call (310) 412-5294 on weekdays; City Hall closes on alternating Fridays, so check the calendar.
Which building code edition applies to an Inglewood remodel?
It depends on the document you read, so confirm it with the City. The Municipal Code on eCode360 still adopts the 2019 California Building Code and the 2016 Residential Code, while the City's current handouts for windows, pools and grading cite the 2022 codes. Building Safety can say which edition governs your permit.
Is my Inglewood lot inside the earthquake fault zone?
Ask the City, because we can only offer a sample. In the County's copy of the State's fault map, a boundary touched 8 of 67 grid points we checked, all in the northern and central parts. Our points are not parcel maps. If your lot is inside the zone, the City requires a geological plan check.
Does living under the LAX flight path change how I remodel an Inglewood house?
It can change the windows and doors you choose and what you pay to replace them. The City's Residential Sound Insulation program funds sound modification for eligible owners inside the 2020 noise contour. Contact them at 310-412-5289 before buying, because work done under the program may already be recorded on your property.
What is the Inglewood presale report and how long is it valid?
It is a report of building records and code violations that Chapter 11, Article 8 of the Municipal Code requires before any sale or exchange. It lists permit numbers, legal units, any fault zone status and the LAX impact level with any sound insulation. It stays valid for six months, so unpermitted work can surface at closing.
Are Inglewood's ADU rules settled?
Not as far as we could confirm. Article 35 sets a 500 square foot minimum, the Planning Division's sheet lists 150, and California's housing department found at least 14 conflicts with state law in a May 2025 letter. We could not find whether the City amended the ordinance afterward, so ask Planning before you design.
Does Inglewood have wildfire or flood zones that affect my project?
Almost never. The Safety Element reports no fire hazard severity zones and no FEMA 50-year or 100-year floodplain, and our 67 sample points found none in either layer. The Safety Element still warns of urban flooding on paved surfaces, so drainage is a design question, not a mapping one.
What hours can a contractor work in Inglewood?
Seven days a week, from 7:00 a.m. until 8:00 p.m., according to the City's Inspections page, holidays included. Municipal Code section 5-41 bars disturbing outside construction between 8:00 p.m. and 7:00 a.m. within 500 feet of residential zones without a permit, so late pours invite complaints.
Send us your Inglewood address
Tell us the address and what you want built. We check the lot against the City's fault, noise and overlay sources first, then explain on the phone which Inglewood permits and reviews your job may meet.