Tarzana, CA · Serving Southern CaliforniaCSLB #1040337 · (888) 666-8224
Whittier, CA

General Contractor in Whittier, CA

Quick answer

A general contractor in Whittier clears Planning Services first and Building & Safety second, under the 2025 state codes the City has applied since January 1, 2026. Four historic districts, an H-R hillside zone, a citywide Class A roof rule and an east side fault zone shape the work. MDG Builders, CSLB #1040337, manages eleven trades here.

Services

Eleven trades we manage for Whittier homes

Each page below applies Whittier's own code sections, overlays and housing stock to one trade, with the City's sources linked. Pick the job closest to yours.

A small bright rental apartment kitchen freshly updated with white shaker cabinets, kitchen remodeling by a general contractor near Whittier in Santa Fe Springs

Kitchen Remodeling in Whittier

Which finish work skips a permit, 1950s tract walls, historic district review, online plumbing and electrical permits and older wiring.

See Whittier kitchen remodeling →
Hall bathroom with a tub-to-shower conversion: white subway tile to the ceiling, clear glass panel, bathroom remodeling by a general contractor in Hadley-Greenleaf Historic, Whittier

Bathroom Remodeling in Whittier

Online like-for-like permits, Uptown historic review, 1950s walls, very heavy termite rating and work hours for Whittier bathrooms.

See Whittier bathroom remodeling →
The backyard of a 1920s California bungalow cleared for a new backyard unit, with wooden stakes, adu construction by a general contractor near Whittier in Pico Rivera

ADU Construction in Whittier

Sixty-day review, four preapproved plans, historic district waivers, hillside plans and fire flow tests for Whittier ADUs.

See Whittier ADU construction →
A 1960s stucco house with a freshly built second story, new windows and a low-pitched roof, room additions by a general contractor in Central Park, Whittier

Room Additions in Whittier

The 600 square foot Planning line, 40 percent lot coverage, single-story neighborhoods, hillside plans, historic review and soils in Whittier.

See Whittier room additions →
A ladder leaning against the eave of a stucco house with a clay tile roof and a closed clipboard han, roofing by a general contractor near Whittier in La Mirada

Roofing in Whittier

Class A on every roof, the metal roofing ban, historic district waivers, Puente Hills fire exposure and online re-roof permits.

See Whittier roofing →
Bedroom with two white double-hung windows, linen curtains, a bed with white bedding, windows by a general contractor in College Hills, Whittier

Windows in Whittier

Planning approval, pre-1941 and historic district review, the City's window handout, egress sizes and fire zone glass in Whittier.

See Whittier window replacement →
A bare plywood subfloor in an empty room being prepared: clean screws in rows, flooring by a general contractor near Whittier in Montebello

Flooring in Whittier

What lies under 1950s carpet, termite and slab checks, original oak in four historic districts, asbestos in old vinyl and the license a floor installer needs.

See Whittier flooring →
The exterior wall of an older house prepared for lead-safe painting with plastic sheeting along the , painting by a general contractor in Earlham Drive, Whittier

Painting in Whittier

No paint permit, historic district color questions, lead-safe rules for older homes, termite-prone trim, stucco and sourced prices.

See Whittier painting →
Stamped concrete patio in a slate pattern with a round fire pit and outdoor chairs, concrete by a general contractor near Whittier in South El Monte

Concrete in Whittier

Driveway width caps, hillside grading in the Puente Hills, historic walks and walls, fault and slope ground, wall heights and costs by the foot.

See Whittier concrete work →
A rear deck of warm cedar boards on a 1920s California bungalow, with simple railings, decks by a general contractor in Whittier College, Whittier

Decks in Whittier

Hillside development plans, fire zone decking, the 30 inch permit line, deck repair rules, historic district review and costs by material.

See Whittier deck building →
Wooden survey stakes with orange flagging tape and a string line marking a property line along a bac, fencing by a general contractor near Whittier in Norwalk

Fencing in Whittier

Front yard caps by lot width, the 18 inch permit question, the fence palette, corner lots, Greenway Trail walls and historic district waivers.

See Whittier fencing →
Whittier at a glance

Before you hire a general contractor in Whittier, what should you check first?

Start with the age of the house, because Whittier's story is a story of layers. Pickering Land and Water Company bought a former ranch in 1887, reserved 20 acres for a college and named the Quaker colony for the poet John Greenleaf Whittier. The town incorporated on February 25, 1898 with 585 residents, and its lemons, oranges, walnuts and oil fields supported 14,822 people by 1930. Growth then came in a rush: 16,115 residents in 1940, 33,663 in 1960 and 72,863 in 1970, as tracts replaced groves. The Census Bureau's 2024 one year estimates count 31,200 housing units here. About 37.1 percent went up in the 1950s, 17.4 percent in the 1940s, 15.2 percent in the 1960s and 13.3 percent in 1939 or earlier, which puts 88.8 percent before 1980. Roughly 62.8 percent are detached single-family homes and 41.1 percent of households rent. So a kitchen remodel or bathroom remodel usually opens walls with original wiring and pipe, new flooring raises questions about old vinyl, termites and slab moisture, and a repaint of a pre-1978 house falls under federal lead-safe rules.

The approval path has a fixed order. The Community Development Department says Planning Services must evaluate a project before Building & Safety reviews plans, and its counter is open 7:30 a.m. to 4:00 p.m. Monday through Thursday and 8:00 a.m. to 4:00 p.m. on Friday. Many permits for a re-roof, plumbing, electrical, solar, a like-for-like bathroom or a window change are filed through the City's online portal. Since January 1, 2026 plan check follows the 2025 California codes with the 2023 County Fire Code. An issued permit expires if work has not started within 180 days, and permit-covered work runs 7:00 a.m. to 8:00 p.m. Monday through Saturday, never on Sundays or federal holidays. The code's exempt list names painting, tiling, carpeting, cabinets and counter tops, so cosmetic work can skip a permit. It also lists walls or fences up to 18 inches and detached wood decks up to 30 inches above grade, yet the City's fence page says a new fence needs a building permit, so treat that 18 inch line as a question for the counter and see the deck builder page before you plan a platform. This page quotes no fee amounts, because the City's fee sheets could not be read reliably.

Overlays then decide what is possible. Four historic districts sit around Uptown: Central Park with 45 properties, Hadley-Greenleaf with over 190, College Hills with 97 and Earlham with seven. In them, and on any landmark, a change to a building's appearance needs a certificate of appropriateness from the Historic Resources Commission or a waiver from its Secretary before any permit is issued, which touches a roof, windows and a paint scheme. Maintenance that changes no design, material or look is not blocked, and the City tells owners of houses built before 1941 to call Planning first. Land on the 1979 hillside maps is the H-R Hillside Residential zone: a hillside development plan and a soils and geologic report come before any building permit, density is capped at 3 units per net acre, and cuts and fills stop at 20 feet. We did not open those maps, so we name no street as H-R. That zone shapes an ADU, a room addition and any concrete work that moves soil. Every roof covering in the city must be Class A, and most metal roofing is banned on houses.

Hazards come last, and they come with caveats. CAL FIRE's updated Local Responsibility Area map reached Whittier on March 24, 2025, and we could not confirm that the City Council has adopted it by ordinance, so check the City's fire severity zone page and ask. The hazard plan counts 2,373 of 23,414 parcels as Very High, mostly north of Whittier Boulevard. A State Alquist-Priolo fault zone covers part of the Whittier fault on the east side, and the 1987 Whittier Narrows earthquake damaged Uptown's pre-1930 buildings hardest. Every hazard figure we quote from County mapping is a count of points in a 413-point sample, not a share of the city's area. The Whittier City Yard gauge records 13.32 inches of rain a year, 79 percent of it from December through March, and Fullerton Airport, about 7 miles away and lower than most of town, logs 39 days a year at 90 degrees F or above. MDG Builders is the contractor of record, CSLB #1040337: we write the scope, carry it through Planning and plan check, book licensed specialty subcontractors and walk the result with you. Our subcontractor explainer describes that split, and the nearest hubs are Norwalk and Downey.

Raised composite deck with a cable railing and outdoor dining set on a hillside lot, canyon view, decks by a general contractor in Uptown Whittier, Whittier
  • Whittier's four historic districts hold 45, over 190, 97 and seven properties.
  • An issued Whittier building permit expires if work has not started within 180 days.
  • Municipal Code 15.18.010 requires a Class A roof covering on every roof in the city.
  • About 88.8 percent of Whittier's 31,200 housing units were built before 1980.
  • The 1987 Whittier Narrows earthquake did its worst damage to Uptown buildings from before 1930.
  • Whittier receives 13.32 inches of rain a year, with 79 percent falling December through March.
Nearby

Cities near Whittier we also build in

FAQ

Whittier general contractor questions, answered

Does a remodel in Whittier always need a permit?

No, not always. The City's code exempts painting, tiling, carpeting, cabinets and counter tops, and ordinary repairs need no application unless they cut a wall, remove a beam, change an exit or alter safety-related piping or wiring. Moving plumbing, gas, wiring or walls does need one, so ask the counter.

Where do I start a building permit in Whittier?

Start with Planning Services in the Community Development Department, because a project must be evaluated there before Building & Safety reviews plans. Many permits are filed online, and the counter is open Monday through Thursday 7:30 a.m. to 4:00 p.m. and Friday 8:00 a.m. to 4:00 p.m. Confirm any turnaround time by phone.

How do I tell if my Whittier house is in a historic district?

Ask Planning to check the address against the four districts: Central Park, Hadley-Greenleaf, College Hills and Earlham. Inside one, and on any landmark, a change to a building's appearance needs a certificate of appropriateness or a waiver before a permit. The City also asks owners of homes built before 1941 to call first.

What is the H-R hillside zone in Whittier?

It is the Hillside Residential zone in Municipal Code chapter 18.14, applied to land on the City's 1979 hillside maps. A hillside development plan and a soils and geologic report must be approved before any building permit, and density is capped at 3 units per net acre. Ask Planning whether your parcel is mapped.

Is my Whittier home in a very high fire hazard zone?

Check the CAL FIRE viewer and ask the City. CAL FIRE's updated Local Responsibility Area map reached Whittier on March 24, 2025, and we could not confirm that the Council has adopted it by ordinance. The hazard plan counts 2,373 of 23,414 parcels as Very High, mostly north of Whittier Boulevard.

Does every roof in Whittier have to be Class A?

Yes. Municipal Code 15.18.010 requires every roof covering assembly in the city to be at least Class A, not only in fire zones. Metal roofing is also prohibited on houses unless it imitates wood shake or tile or is architecturally integrated, so a roofing material needs checking before you order it.

Can I build a Whittier fence over 18 inches without a permit?

Probably not. The code's exempt list excuses walls or fences not over 18 inches, but the City's fence page says a new or rebuilt fence needs a building permit, plus a development review application for front, street side and side yard fences. Treat the two statements as unsettled and confirm with Planning.

Does the Whittier fault affect a home project?

It can on the east side. A State Alquist-Priolo Earthquake Fault Zone, released in 1991, covers part of the Whittier fault, and 10 of 413 sample points in County mapping fell inside it. That is a point count, not a parcel count, so ask the City whether your lot is mapped before designing.

Free estimate

Ask about a Whittier address

Tell us the street address and the job you have in mind. Before we talk scope we look up whether the lot sits near Uptown's four districts, on the hillside maps or inside the east side fault zone, and then name the reviews that could apply.

Free estimate · A real person answers · (888) 666-8224

Call (888) 666-8224