General Contractor in Redlands, CA
A general contractor in Redlands answers to a City that issues its own permits and staffs its own Fire Department. Eight local historic districts review exterior changes, and the 2025 wildfire code covers the whole city. Between 56.0 and 65.8 percent of homes predate 1980, depending on the survey. MDG Builders holds CSLB #1040337.
Eleven trades, checked against Redlands handouts, code chapters and fire pages
Pick the job on your list and open its Redlands page. Each one points to the City handout, code chapter or Fire Department page behind its answer, says when the text came from a third-party code mirror, and treats a dollar range as a planning figure for the region, never as a bid on your house.

Kitchen Remodeling in Redlands
A City handout defines what needs a kitchen permit, interior work stays outside historic review, 2025 codes apply and homes built before 1980 may need asbestos checks in Redlands.
See Redlands kitchen remodeling →
Bathroom Remodeling in Redlands
Redlands' bathroom permit line and in-room checklist, homes from the 1890s to the 1980s, historic district limits, asbestos rules and rentals.
See Redlands bathroom remodeling →
ADU Construction in Redlands
State ADU law first, then Redlands' sizes and setbacks, historic district review, the 2025 wildfire code, flood and hillside rules and City-run utilities.
See Redlands ADU construction →
Room Additions in Redlands
Redlands' five-set plan check, R-1 coverage numbers, historic review for visible additions, hillside slope, the flood rule and the wildfire code.
See Redlands room additions →
Roofing in Redlands
Online re-roof permits, staff review in eight historic districts, Class A roofs in fire zones and a cool roof rule written for the 2019 Energy Code in Redlands.
See Redlands roofing →
Windows in Redlands
Redlands' historic district window review, window permit status, 96 F summer highs, Santa Ana wind, the wildfire code and lead-safe work in older homes.
See Redlands window replacement →
Flooring in Redlands
Victorian and Craftsman floors, North Redlands tract slabs, asbestos survey rules, flood-zone slabs, historic district limits and flooring costs in Redlands.
See Redlands flooring →
Painting in Redlands
No permit for paint alone, a Planning call before color or siding changes in eight historic districts, South Coast VOC limits and storm drains that reach the Santa Ana River.
See Redlands painting →
Concrete in Redlands
Permit questions for slabs, hillside grading from 15 percent slope, flood-zone elevation, retaining walls and flagpoles, historic blocks, Rule 403 dust and concrete costs in Redlands.
See Redlands concrete work →
Decks in Redlands
The 2025 Wildland-Urban Interface Code, historic district review, permit questions, ledger and guard rules, hillside lots, balcony inspections, deck repair and costs in Redlands.
See Redlands deck building →
Fencing in Redlands
A 6 foot permit exemption, 3 foot solid front yards, staff review of new fences in historic districts and 2025 wildfire rules for fences near Redlands homes.
See Redlands fencing →What should a general contractor know about Redlands, where a historic district, a wildfire code and a flood rule can all land on one lot?
The City dates its founding to 1881 and its incorporation to 1888, and by 1900 Redlands had earned the label City of Millionaires, later softened to City of Beautiful Homes, on the back of navel oranges. The City's Housing Element counts 1,000 residents in 1888, 4,797 in 1900, 18,429 in 1950, 36,355 in 1970 and 73,168 in 2020, and it ties the growth after 1950 to subdivided citrus groves. Walk the old core and you pass Victorian and turn of the century landmarks, among them Kimberly Crest, the Morey House and the Smiley library, with bungalows near Smiley Park and big houses along Olive and Highland Avenues. Census Bureau ACS 2024 one year estimates, read through Census Reporter, count 27,483 housing units, give or take 2,237, and 44.0 percent of occupied homes are rented. About 56.8 percent of units are detached houses. The biggest decades are the 1970s with 4,980 units, the 1980s with 4,826 and the 1960s with 4,427, and about 8.1 percent date from 1939 or earlier. ACS puts the share built before 1980 at about 56.0 percent, while the Housing Element's older five year table says 65.8 percent, so we quote the range instead of one number. The era cells carry margins of 600 to 1,400 units, and because the table cannot split 1978 from 1979 we print no pre-1978 count. The median owner-occupied home is valued at $613,600. The Housing Element also says homes in South Redlands age better than their years suggest, because owners fix up historic houses, while most repair need, such as painting and reroofing, sits in North Redlands, which has many homes over 50 years old and no historic districts.
Redlands issues its own permits. Building & Safety is a division of Development Services, run from the One Stop Permit Center at 909-798-7536, and inspections are requested online. The City's two pages disagree on counter hours: one says Monday through Thursday with alternate Fridays closed, the other says Monday through Friday with every other Friday closed, so call before you drive over. Only solar, water heater, HVAC changeout, panel upgrade, patio cover, block wall and fence, and roofing permits can start in the online portal, and payment is still made in person. Everything else is filed at the counter. A permit may be pulled by the owner, by a licensed contractor with proof of workers' compensation insurance, or by an authorized agent holding a notarized letter. The City's code text was read in GoCodebook, a third-party mirror dated October 2026, so confirm section numbers with the City before you quote them. It lists the 2025 California Building, Residential and Fire Codes with local amendments, plus a 2025 Wildland-Urban Interface Code that covers every area of the city, although the kitchen and bathroom handouts still cite older code cycles. The fee schedule on the City's page carries columns labeled current, full cost and Year 1 to 3, and we could not tell which one is in force, so these pages quote no permit fees. New dwellings, additions and detached buildings need five 24 by 36 inch plan sets and two sets of Title 24 calculations. Work begun before the permit issues draws a separate investigation charge, and a building code violation is a misdemeanor that the code counts day by day. Dust, coatings and asbestos fall under South Coast AQMD Rules 403, 1113 and 1403, and water service comes from the City's own utility.
The eleven trades reach that counter differently. A roof repair or replacement is permit work that can start online, and in a historic district it is a minor review item. A window replacement is treated as permitted work, and a new opening you can see from the street is a major review item. A kitchen remodel or bathroom remodel reaches the counter as soon as cabinets, sinks, tubs or showers move or come out, but paint, floor coverings and a toilet swap alone stay outside it. A room addition must fit a lot that allows 30 percent coverage and a 25 foot rear yard. An ADU follows State ADU law, which the City says it applies, with detached units up to 1,200 square feet. House painting needs no building permit, yet a historic district asks you to call Planning before a color or siding change. Flooring installation needs no permit for the covering alone, though old tile and adhesive in an older house may bring asbestos survey duties. A fence up to 6 feet is exempt unless it encloses a pool, and the front yard has its own limits. Concrete work has no published exemption list, walls over 3 feet need a permit and anything touching the public right of way goes to Municipal Utilities & Engineering. A deck should be treated as permit work because the City publishes no low-deck exemption.
Then come the hills, the water and the fire. About 30 percent of Redlands sits in a high fire hazard severity zone, mostly the south and east, where the City's 2025 Community Wildfire Protection Plan names Smiley Heights, Live Oak Canyon, San Timoteo Canyon and the eastern edge near Mentone and Yucaipa. We could not load the State's map viewer, so we checked no parcel, and the Redlands Fire Department can tell you your lot's zone. Redlands runs its own Fire Department, not San Bernardino County Fire, and its Community Risk Reduction Division reviews fire plans, issues fire permits and inspects defensible space. The local WUI chapter calls for a 100 foot fuel modification zone around buildings in hazardous fire areas, Class A roofs in Moderate, High and Very High zones, and a penalty of $1,000 a day. On top of that sits design review: eight local historic districts, most of them in South Redlands, plus two National Register districts require a Certificate of Appropriateness for exterior work, and any demolition of a structure 50 years or older goes to the Historic and Scenic Preservation Commission. Interior work stays outside that review. In flood zones AE and AH the lowest floor must sit 2 feet above base flood elevation, and the 1819 Mission Zanja is called a serious threat in big storms. The Hillside Development District starts at an average slope of 15 percent. Voter-approved growth caps in Title 19 are suspended while SB 330 applies. Neighbors with their own guide: San Bernardino. Loma Linda, Highland, Yucaipa and Colton stay plain text for now. MDG Builders, CSLB #1040337, plans the scope and files the permits, and the field work goes to licensed subcontractors who will hand over their license numbers on request. Two short reads help before any signature: the blog post on how general contractors use subcontractors and the one on checking a contractor's license.

- Redlands issues its own permits through Building & Safety at 909-798-7536, and its own Fire Department reviews fire plans, so a county fire district is not part of the picture.
- ACS 2024 puts about 56.0 percent of the city's 27,483 housing units before 1980, while the Housing Element's older table says 65.8 percent.
- Exterior changes in the eight local and two National Register historic districts need a Certificate of Appropriateness, and the City's minor list covers re-roofs and new fences.
- About 30 percent of the city is in a high fire hazard zone, and the 2025 Wildland-Urban Interface Code applies in every area of Redlands.
- In flood zones AE and AH, the lowest floor of new residential construction must be at least 2 feet above base flood elevation.
- Code text on these pages was read on GoCodebook, a third-party mirror dated October 2026, and the permit fee column now in force could not be confirmed.
Cities near Redlands we also build in
Redlands questions we hear before a contract is signed
Does Redlands issue its own building permits?
Yes. The Building & Safety Division of Development Services issues permits from the One Stop Permit Center, and you can reach it at 909-798-7536. Only roofing, solar, HVAC, panel, water heater, patio cover, block wall and fence permits start online. Everything else is filed in person, so ask what to bring before you go.
Does Redlands have its own fire department?
Yes. The City runs the Redlands Fire Department, and its Community Risk Reduction Division reviews development plans, issues fire permits and inspects defensible space. Redlands is not served by San Bernardino County Fire. For a question about sprinklers, access or a detached ADU, call the Fire Marshal's office at 909-798-7603.
Is my Redlands home in a fire hazard severity zone?
Possibly. The City's wildfire plan says about 30 percent of Redlands is in a high zone, mostly south and east, near Smiley Heights and the canyons. We could not load the State's map viewer, so we cannot confirm any parcel. Ask the Fire Department, since the 2025 WUI Code applies citywide anyway.
Do I need design approval before changing the outside of an older Redlands home?
Only if the house is a designated landmark or sits in one of the eight local or two National Register historic districts. Then exterior changes need a Certificate of Appropriateness, with minor items such as re-roofs and fences approved by staff and larger ones heard by the Commission. Interior work is outside that review.
How old are Redlands homes, and what does that mean for remodeling?
Between about 56.0 percent (ACS 2024) and 65.8 percent (the Housing Element's older table) of Redlands homes predate 1980, so plan for aging roofs, plumbing and wiring. The Census cannot split 1978, so we print no pre-1978 share. Older floor tile and adhesive can also require an asbestos survey under South Coast Rule 1403.
What are Redlands' voter-approved growth limits, and do they affect my project?
Title 19 caps new residential development at 400 units a year under a point system, but the City suspended enforcement under Resolution 8082 while SB 330 is in effect. We could not confirm how it would treat a given addition or ADU, so ask Planning before you design around any limit.
Do flood or hillside rules change what I can build in Redlands?
They can. In flood zones AE and AH the lowest floor of new residential construction must sit 2 feet above base flood elevation, and an addition costing half the structure's market value counts as a substantial improvement. The Hillside Development District applies from a 15 percent average slope and requires an engineer's slope plan.
What does a general contractor do on a Redlands job?
The general contractor is the party you sign with and the one responsible when trades overlap. MDG Builders, CSLB #1040337, plans the work, files the City permits, books licensed subcontractors for the field work and inspects the finished result with you. Check each license at cslb.ca.gov and ask to see insurance certificates.
Tell us where your Redlands project sits
Tell us whether the house is near downtown, on a historic block, in a North Redlands tract or close to the south and east canyons, about when it was built and which jobs you are weighing. We will look up the review, fire and flood questions for that part of town before we phone you back.