Tarzana, CA · Serving Southern CaliforniaCSLB #1040337 · (888) 666-8224
Bathroom Remodeling in Redlands

Bathroom Remodelingin Redlands, CA

Quick answer

Bathroom remodeling in Redlands needs a City building permit when the job removes or moves a vanity, sink, tub or shower, changes lighting or replaces wallboard. Paint, a toilet swap, mirrors and floor coverings alone do not. Permits for a bath go through the One Stop Permit Center in person, and historic review covers exterior changes only.

CSLB #1040337 5.0 on Houzz Free written estimate
Primary bathroom: freestanding white tub, bathroom remodeling in A. K. Smiley Public Library, Redlands
CSLB #1040337Verified at CSLB
5.0 on HouzzRated by clients
Written proposalsScope and price in writing
Licensed specialistsSubcontractors do the work

Redlands bathrooms span more than a century of plumbing. The City says it was founded in 1881, incorporated in 1888 and known by 1900 as the City of Millionaires, and its history page points to the 1897 Kimberly Crest chateau, the Queen Anne Morey House and the bungalows around Smiley Park. The Census Bureau's 2024 one-year estimates count 27,483 homes, and about 56.0 percent were built before 1980. The Housing Element's older five-year table puts that share at 65.8 percent, so call it roughly 56 to 66 percent, with the right answer depending on the survey. The median owner-occupied home is worth $613,600, plus or minus $29,608.

Below you will find the permit line, the City's checklist for what goes inside a remodeled bath, what sits behind old walls, historic district limits, asbestos and dust rules, rentals and the schedule. We read City pages directly, but Municipal Code text came from GoCodebook's third-party mirror, so confirm each rule with the Building & Safety Division before you design. Prices are on our bathroom remodeling page, and the Redlands area page lists every trade we cover here.

Bathroom Remodeling rules in Redlands

What Redlands Building & Safety checks in a bathroom job

Where bathroom remodeling permits come from in Redlands: City of Redlands Development Services Department, Building & Safety Division.

  • Bathroom work: the City's handout (Rev. 2/14/2023, citing the 2022 codes) says bathroom renovations generally require a building permit, where a renovation means removing or relocating vanities, sinks, tubs and showers, changing lighting or replacing wallboard, while toilet replacement, towel bars, mirrors, paint and floor coverings alone are maintenance needing no permit.
  • Bathroom technical requirements on the City's handout: a 20 amp GFCI outlet within 36 inches of each basin, a 50 cfm humidity-controlled, ENERGY STAR exhaust fan ducted outdoors and switched separately from the light even when there is a window, a vacancy sensor on at least one high-efficacy light, tempered glass at tubs and showers, pressure-balancing or thermostatic valves, a 1.8 gpm shower head limit, and a shower interior of at least 1,024 square inches that fits a 30 inch circle.
Sources for these rules
  1. redlands.gov: residential bathroom renovation
A wooden table with rolled blank drawings, a clipboard, bathroom remodeling near Redlands in Mentone
Permit line

Do I need a permit for a bathroom remodel or renovation in Redlands?

Yes, once you go past surface work. The City's bathroom handout defines a renovation as removing or relocating vanities, sinks, tubs and showers, changing lighting or replacing wallboard, and it lists paint, toilet replacement, towel bars, mirrors and floor coverings as maintenance that needs no permit when nothing else is included. Turning a tub into a shower is a renovation. A new vanity in the same spot with the same plumbing sits on the line, so ask before you buy.

The permit itself is an in-person visit. Only solar, water heaters, HVAC changeouts, panel upgrades, patio covers, block walls, fencing and re-roofs can start in the City's online portal, so a bathroom with a moved drain goes to the One Stop Permit Center at 35 Cajon Street, Suite 15A, and payment is made at the counter. The Building page lists Monday through Thursday, 8:00 to 4:30, with alternate Fridays closed, while the One Stop page says Monday through Friday with the same alternate-Friday closure, so call 909-798-7536 before you drive over. Inspections are requested online.

Skipping the permit is costly. The Municipal Code charges an investigation fee equal to the minimum permit fee for work started without one, and a violation is a misdemeanor with each day counted separately. Our license check guide shows how to confirm a contractor before any deposit.

Hall bathroom with a tub-to-shower conversion: white subway tile to the ceiling, clear glass panel, bathroom remodeling in Redlands Bowl, Redlands
Inside the room

What does a remodeled bathroom have to include under Redlands' handout?

A short list of installed details, all of them inspected. The handout asks for a 20 amp GFCI outlet within 36 inches of each basin, a 50 cfm humidity-controlled ENERGY STAR exhaust fan ducted outdoors and switched apart from the light even when a window is present, and a vacancy sensor on at least one high-efficacy light. Showers need pressure-balancing or thermostatic valves, a 1.8 gpm showerhead limit and tempered glass at tubs and showers.

The shower interior must be at least 1,024 square inches and fit a 30 inch circle, which rules out some very small stall layouts. One catch: the handout was revised on February 14, 2023 and cites the 2022 codes, while the City has since adopted the 2025 California Building and Residential Codes through Chapters 15.04 and 15.06. We treat the handout as a floor and ask the counter whether anything changed, since a plan sheet that cites an old rule gets corrected at review.

  • Is the fan ducted outdoors and wired on its own switch?
  • Does the shower floor area clear 1,024 square inches with a 30 inch circle?
Walk-in shower with a recessed tile niche, small mosaic floor tile, bathroom remodeling near Redlands in Loma Linda
Old walls

What is behind the walls of a Redlands bathroom built between 1890 and 1980?

More layers than the tile suggests. Census figures show about 8.1 percent of homes, 2,217, date from 1939 or earlier, 4.2 percent from the 1940s and 9.5 percent from the 1950s, so about 21.8 percent predate 1960. The big postwar surge came after the City's 1950 population of 18,429 climbed to 43,619 by 1980, and the Housing Element ties that growth to subdividing former citrus groves. The 1960s, 1970s and 1980s together make up about 52 percent of homes.

Condition varies by neighborhood. The Housing Element says older South Redlands homes are in better shape than their age predicts because owners fix up historic homes, and that most repair need, painting, reroofing and some reconstruction, sits in North Redlands. We found no source that dates pipe or wiring types by decade, so nobody can name what a wall holds until it is open. Expect to price a camera run through the drain and a pause for an electrician's look before the vanity wall is closed.

  • Who runs a camera through the drain before the new floor goes down?
  • Who checks the panel and wiring when a vanity wall is opened?
A 1930s Los Angeles bathroom opened to the studs with a cast-iron tub, bathroom remodeling in Lincoln Memorial Shrine, Redlands
Historic districts

Does a bathroom remodel in a Redlands historic district need a Certificate of Appropriateness?

Not for the interior. The City's preservation page says a Certificate of Appropriateness applies to exterior work, and Municipal Code 2.62.200 requires one for exterior alterations to designated resources and new construction in the eight local districts, the Santa Fe Depot and Smiley Park National districts and individual landmarks. A new vanity, tile or tub behind the walls is not what that review looks at.

Exterior pieces of a bath job can be. The Planning checklist treats new window sizes or openings visible from the street as a major item for the Historic and Scenic Preservation Commission, while a matching opening on a side or rear wall is minor and approved by staff. A new bath window facing the street, or a bump-out, is therefore a hearing, and the Housing Element puts that process at about 45 days from a complete application. Planning is at 909-798-7555 ext. 1, and the City's Planning Permits page lists an application fee of $1,160 for a Mills Act contract, a tax offset for upkeep. Window specifics are on our Redlands window page.

Small powder room with a patterned cement tile floor, pedestal sink, bathroom remodeling near Redlands in San Bernardino International
Asbestos, lead and dust

Who checks for asbestos and lead before a Redlands bathroom is demolished?

A hired contractor does, and the rules are firm even when the schedule is tight. Redlands sits inside South Coast AQMD, whose Rule 1403 calls for a survey for asbestos-containing material and notice to the District at least 10 working days before most non-emergency demolition or renovation. An owner who personally renovates a single-unit dwelling is exempt, but a paid contractor is not, and the survey duty does not apply to a single-unit renovation that strips less than 100 square feet of asbestos-containing surface. Old floor tile, mastic and wallboard texture are the usual suspects.

Lead is separate. Federal rules cover paid work that disturbs painted surfaces in a house built before 1978, and the Census table cannot split 1978 from 1979, so your own build year decides. Dust is covered too: Rule 403 bars visible dust beyond the property line, and Redlands can suspend a permit when dust or uncontained asbestos exceeds standards. A dumpster left on the street falls under Municipal Code 15.04.060, which requires clearance from the City Engineer, and paint or wash water must stay out of the gutter because Redlands street runoff reaches the Santa Ana River untreated.

A hallway floor protected with ram board and plastic sheeting outside a bathroom door, bathroom remodeling in Smiley Park Historic District, Redlands
Rentals and multiunit

What changes when the Redlands bathroom is in a rental, a duplex or a condo?

The first question becomes who owns the pipe. The Census Bureau counts 44.0 percent of Redlands households as renters, 13.1 percent of homes sit in buildings of two to four units and 22.8 percent in buildings of five or more, with another 2.1 percent mobile homes. A shared drain stack, a wall that backs onto another unit or a tenant who needs notice all change how a bath job is scheduled.

The City's permit rules do not distinguish owner from landlord, but who can sign does. An owner pulls a permit with ID, an owner's representative needs a notarized Authorized Agent Letter and the Property Owner's Package, and a licensed contractor uses a state license number. In an association building, ask the board for its remodel rules before ordering anything. A second unit with its own bath follows the Redlands ADU page path, and a wall pushed outward is on the Redlands room addition page.

A compact updated rental apartment bathroom with a white tub-shower combination, white subway tile, bathroom remodeling near Redlands in San Bernardino-Tippecanoe
Schedule and waterproofing

How long does a bathroom remodel take in Redlands, and who does the work?

Our planning ranges are 2 to 6 weeks for design and selections, a few days of demolition and rough plumbing, 3 to 5 days of waterproofing and cure, 1 to 2 weeks of tile and fixtures and a few days for glass and the final inspection. Redlands is dry, with 12.87 inches of rain a year and about 104 days at or above 90 F, so the moisture a bath sees comes from the shower. Our practice is a pan sloped to the drain, cement backer board, one membrane that wraps the curb and a flood test with photos before tile. That test is ours, not a City rule.

MDG Builders, CSLB #1040337, acts as the general contractor. It draws the layout, handles the permit and books the trades, while a licensed plumber, tile setter and electrician set the work, and each can show a license number and certificate of insurance on request. The subcontractor chain explained shows who does what, and a California home improvement deposit is capped at $1,000 or 10 percent of the price, whichever is less.

A bathroom shower pan being waterproofed: red waterproofing membrane painted over cement board on the wal, bathroom remodeling in Santa Fe Depot District, Redlands
Recent work

Bathroom photos from Redlands and nearby homes

Bathroom scenes tied to Redlands, from opened vintage walls and waterproofing to finished tile, in homes that range from the Smiley Park bungalows to the tracts built on former citrus groves. Tap a photo to enlarge it.

A compact updated rental apartment bathroom with a white tub-shower combination, white subway tile, bathroom remodeling near Redlands in San Bernardino-Tippecanoe
A bathroom shower pan being waterproofed: red waterproofing membrane painted over cement board on the wal, bathroom remodeling in Santa Fe Depot District, Redlands
Floating oak vanity with a stone top, undermount sink, round mirror and two wall sconces, bathroom remodeling near Redlands in Loma Linda University Medical
Cost

What bathroom remodeling costs around Redlands

Our bathroom remodeling page builds its tiers on a bath of about 35 square feet: about $9,000 to $18,000 for a refresh, $25,000 to $40,000 for a midrange remodel that keeps the layout, $50,000 to $85,000 and up for a primary bath and $60,000 to $120,000 for a bath added from nothing. We found no Redlands cost survey, so those tiers lean on Los Angeles figures. Remodeling magazine's 2025 Cost vs. Value report lists a midrange bath at $27,143 and an upscale one at $85,055, and Thumbtack's page for that city, updated July 2026, spans $8,495 to $26,582. A median home value of $613,600 hints at finishes in the middle or upper tiers, though a site visit settles it. The City's building fee schedule carries Current, Full Cost and Year 1 to 3 columns, so we cannot tell which one applies today, and permit and plan check charges appear as their own lines in a written proposal. The bathroom cost guide explains what moves a bath between tiers. For nearby bath work see San Bernardino, Fontana, Ontario and Los Angeles.

Bathroom Remodeling price ranges used for Redlands estimates (Southern California sources, before permits)
What it coversTypical range
Refresh in the same layout: new vanity, toilet, fixtures, lighting, paint, limited tile$9,000 to $18,000
Mid-range full remodel in the same layout: new shower or tub, tile, vanity, fixtures, lighting and fan$25,000 to $40,000
Upscale or primary bath: stone, custom glass, freestanding tub, double vanity, heated floor$50,000 to $85,000 and up
Adding a new bathroom$60,000 to $120,000
FAQ

Redlands bathroom remodel questions, answered

Do I need a permit for a bathroom remodel in Redlands?

Yes, when you remove or relocate a vanity, sink, tub or shower, change lighting or replace wallboard. The City's handout exempts paint, toilet swaps, towel bars, mirrors and floor coverings done alone. Bathroom permits are applied for in person at the One Stop Permit Center, because the online portal handles only a short list of permit types.

Do I need a permit for a shower remodel?

Usually, because a new shower brings a valve, a drain and wall framing. Re-tiling a shower you are not otherwise changing is a surface job. Converting a tub to a shower, moving the drain or replacing wallboard falls on the permit side of the City's line, and the shower interior must reach 1,024 square inches and fit a 30 inch circle.

What is the difference between a bathroom remodel and a bathroom renovation?

A renovation usually replaces fixtures and finishes where they stand, while a remodel moves the layout, pipes or wiring, though contractors blur the two words. Redlands' handout uses the word renovation for any removal or relocation of fixtures, so the permit follows what you touch, not what you call it.

How much does a bathroom remodel cost in California?

Our tiers assume a 35 square foot bath: about $9,000 to $18,000 for a refresh, $25,000 to $40,000 for a midrange remodel and $50,000 to $85,000 and up for a primary bath. They rest on Los Angeles sources rather than a Redlands survey, so a written proposal after a site visit sets your actual price.

Can a handyman do a bathroom remodel?

Only a very small one. California lets an unlicensed person take work worth $1,000 or less, but not when a permit is required or when that person hires help. A Redlands tub-to-shower conversion needs a permit, so look up the license on the CSLB site first.

How long does a bathroom remodeling take?

Allow 2 to 6 weeks for design, a few days of demolition and rough plumbing, 3 to 5 days of waterproofing and cure, 1 to 2 weeks of tile and fixtures and a few days for glass and inspection. Redlands publishes no plan check turnaround on the pages we read, so permit time is a separate unknown.

Do bathroom remodels in older Redlands homes need lead-safe and asbestos checks?

Yes, when a paid contractor disturbs paint in a pre-1978 house or old flooring and wallboard materials. About 56 to 66 percent of Redlands homes predate 1980, depending on the survey. South Coast AQMD Rule 1403 covers hired contractors, while an owner doing personal work in a single-unit home is exempt.

Is remodeling a bathroom worth it?

Usually the midrange tier is, because Remodeling magazine's 2025 Cost vs. Value report for Los Angeles shows a midrange bath recouping about 89.6 percent of its cost at resale, against about 42.3 percent for an upscale one. We found no Redlands resale study, so treat that as a regional guide, not a forecast.

Free estimate

Tell us about your Redlands bathroom

Send the neighborhood, roughly when the house was built, whether it sits in a historic district, and whether the drain, tub or a window is moving, and we begin with the permit question and the asbestos and lead checks.

Free estimate · A real person answers · (888) 666-8224

Call (888) 666-8224