Tarzana, CA · Serving Southern CaliforniaCSLB #1040337 · (888) 666-8224
Flooring in Redlands

Flooring Installationin Redlands, CA

Quick answer

Flooring installation in Redlands needs no building permit for the covering alone, because the City's bathroom handout lists floor coverings as maintenance, but plumbing, electrical or structural work done with it does. About 56 percent of the city's homes predate 1980, so test old tile and adhesive for asbestos and the slab for moisture first.

CSLB #1040337 5.0 on Houzz Free written estimate
Wide-plank natural oak floor in a bright living room with a white sofa and a large window, flooring in A. K. Smiley Public Library, Redlands
CSLB #1040337Verified at CSLB
5.0 on HouzzRated by clients
Written proposalsScope and price in writing
Licensed specialistsSubcontractors do the work

Redlands was founded in 1881 and incorporated in 1888, and the City's own history page calls it the Washington Navel Orange growing capital of the world. The Census Bureau's 2024 estimates count 27,483 homes, with a wide margin of error, and about 8.1 percent date from 1939 or earlier, 21.8 percent from before 1960 and 56.0 percent from before 1980. That mix puts Victorian parlors, Craftsman bungalows and postwar slabs in one city, and each of them hides a different floor.

MDG Builders, CSLB #1040337, is a general contractor in Tarzana that writes the scope, takes the permit questions to the Building & Safety Division and schedules licensed flooring and tile subcontractors to do the laying. The flooring page covers materials, the Redlands overview lists our other trades here, and a floor job often travels with concrete work in Redlands when a slab needs attention.

Flooring rules in Redlands

What Redlands' Building & Safety Division, South Coast AQMD and the City's storm water program say about flooring work

  • Flooring: the City's bathroom handout treats floor coverings, when no other work is included, as maintenance needing no permit, and the pages read give no other flooring rule, so a floor covering swap needs no building permit while any structural, plumbing or electrical work done with it falls under the permit rules.
  • Pre-1980 floors: ACS 2024 puts about 56.0 percent of Redlands homes before 1980 (see housing), and South Coast AQMD Rule 1403 defines resilient floor covering as asbestos-containing floor tile and sheet vinyl with more than 1 percent asbestos, so a contractor removing old tile or sheet flooring in an older Redlands home may trigger the survey and notification duties (the owner-occupant exemption does not cover a hired contractor, and the rule is not tied to a build year).
  • Floor coatings: South Coast AQMD Rule 1113 has a separate floor coatings category (opaque coatings for floors and clear coatings for concrete floors) with its own VOC limit; the rule defines floor coatings as opaque coatings for floors plus clear coatings for concrete flooring.
Sources for these rules
  1. redlands.gov: residential bathroom renovation
  2. aqmd.gov: rule 1403
  3. aqmd.gov: r1113
A wooden table with a clipboard, a tape measure, rolled blank plans and flooring samples of oak, flooring near Redlands in Mentone
Permits

Do you need a permit to replace flooring in Redlands?

Not for the covering by itself, as far as the City's pages show. Redlands publishes no flooring page, but its bathroom renovation handout, revised February 14, 2023, lists floor coverings, paint, towel bars and mirrors as maintenance that needs no permit when no other work is included. The same handout calls removing or moving a vanity, tub or shower a renovation that does need one, so a bathroom floor that comes up with the fixtures is permit work.

Anything under the floor is a different question. The City's Do I Need a Permit handout, from 2019 and not exhaustive, lists new or replaced plumbing fixtures and sewer lines, new circuits and outlets, and alterations, so a moved drain, a radiant heat mat or a sistered joist belongs on a permit. The Municipal Code, which we read in GoCodebook's third-party mirror, lets the City withhold a permit when the site has open violations and charge an investigation fee equal to the minimum permit fee for work started without one. Confirm that wording with the City.

Plan the call before the demolition. The One Stop Permit Center at 35 Cajon Street, Suite 15A, answers at 909-798-7536, and the Building & Safety page and the Center's page disagree on counter hours, Monday to Thursday against Monday to Friday, with alternate Fridays closed on both. The City accepts the owner with ID, a licensed contractor with a workers' compensation certificate or a notarized agent.

A neat stack of unlabeled wood and vinyl floor plank samples in different tones leaning against a wall, flooring in Redlands Bowl, Redlands
Historic homes

Can you refinish the original floors in a Redlands Victorian or Craftsman house?

Often, and the historic district rules stay outside the front door. The City's Planning Permits page says a Certificate of Appropriateness covers exterior work, so sanding a parlor floor inside one of the eight local historic districts is not a design review item. The Census Bureau counts 2,217 homes from 1939 or earlier and 1,160 more from the 1940s, which is the pool of houses old enough to carry original wood underfoot.

A floor job can reach the exterior without warning. The City's major and minor checklist treats new door sizes or openings visible from the street, a closed-in front porch and a change of major wall material as major items that go to the Historic and Scenic Preservation Commission. Matching new openings on side and rear elevations are minor and approved by staff. If a plan widens a doorway to the porch or swaps an exterior threshold, call Planning at (909) 798-7555 ext. 1 first.

Owners here already do this work. The Housing Element says older South Redlands homes are in better shape than their age predicts because owners fix up historic homes, and the City accepts Mills Act contracts to offset the cost of maintaining them. The City's history page names the 1897 Kimberly Crest chateau, the Queen Anne Morey House, the Smiley Park bungalows and the Olive and Highland Avenue estates as the older core. Ask the sander to show the wear layer at a vent opening before anyone promises a refinish.

An old oak strip floor in a 1920s California house half sanded to bare wood and half with the old finish, flooring near Redlands in Loma Linda
Postwar tracts

What is under the floors of a North Redlands tract house from the 1960s to the 1980s?

Layers, and sometimes asbestos. The Census Bureau counts 4,427 homes from the 1960s, 4,980 from the 1970s and 4,826 from the 1980s, about 52 percent of the city together, and the Housing Element ties the growth after 1950 to subdividing former citrus groves. It says most of the city's repair need, painting, reroofing and landscaping, sits in North Redlands, which has many homes over 50 years old and no historic districts. Floors of that age often carry carpet over sheet vinyl over resilient tile on a slab.

No design review stands between that floor and a new one. Because North Redlands has no historic districts, a tract house meets the City only when the work touches structure, plumbing or wiring, so the written proposal has to carry the burden: who takes the sample, who removes a layer that tests positive and who pays for it.

Count the layers before pricing. The 1-year Census estimates carry margins of 600 to 1,400 homes per decade, so treat the decade counts as a guide, not a tally. A tract house has often been refloored once or twice, and every layer adds height at doorways and appliances. Ask for transitions, door undercuts and dishwasher clearance as separate proposal lines.

Luxury vinyl plank floor in a kitchen and dining area, warm gray wood look, white cabinets, a round table, flooring in Lincoln Memorial Shrine, Redlands
Slabs and moisture

Does Redlands' flood history or winter rain push moisture through a concrete slab?

It can, and one dry summer proves little. NOAA's 1991 to 2020 normals from a station inside the city show 12.87 inches of rain a year, 9.77 of it from December through March. The 2021 Local Hazard Mitigation Plan says the Santa Ana River and Mill Creek flooded Orange and Alabama Streets in 1965, 1966, 1969, 1976, 1980, 1992, 1993 and 1995, and it rates sandy soils along the river, the Mission Zanja and San Timoteo Creek high or very high for liquefaction.

The test answers the question, not the season. In-slab humidity probes (ASTM F2170) and calcium chloride kits (ASTM F1869) are the usual tools, and the plank or vinyl maker's limit sets the pass mark. The National Wood Flooring Association tells installers to follow the flooring and adhesive makers' limits and strongly recommends a vapor retarder of 0.13 perms or less, such as 6 mil polyethylene, for concrete subfloors. Ask for each reading in writing, with its date and spot.

A big remodel can also count toward the flood rules. Municipal Code 15.32, read in the GoCodebook mirror, treats an addition or remodel that reaches 50 percent of a structure's market value as a substantial improvement, and residential lowest floors in zones AE and AH must then sit 2 feet above base flood elevation. New flooring alone is far below that line, but a whole-house remodel should add up its lines. We did not look up any address.

A bare concrete slab floor in an empty room with a clear plastic dome moisture test kit and a small hygro, flooring near Redlands in San Bernardino International
Air and water rules

What do South Coast AQMD and Redlands storm water rules say about tearing out, sanding and sealing floors?

Three district rules touch a floor job, and the first is asbestos. Rule 1403 calls for a survey and notice to the District at least 10 working days before most non-emergency demolition or renovation, and it defines resilient floor covering as tile and sheet vinyl with more than 1 percent asbestos. The rule does not reach an owner-occupant who personally renovates a single-unit home, so a hired contractor is covered, and the survey duty skips single-unit renovation that strips under 100 square feet of asbestos-containing surface. The posted copy was amended October 5, 2007, and we did not check later changes.

Dust and coatings come next. Rule 403 bars dust that stays visible past the property line or exceeds 20 percent opacity, which matters when a crew hauls out a slab layer or grinds a floor. Rule 1113 has a separate floor coatings category that covers clear coatings on concrete floors. The VOC table in the posted PDF extracts out of order, so we quote no limit and suggest asking for the product's data sheet.

Water is the third. Redlands runs a storm water program under a Santa Ana Regional Water Quality Control Board permit, and the City lists paint, motor oil and pesticides among pollutants that must stay out of the street and catch basins because runoff reaches the Santa Ana River untreated. Rinse water from adhesive, grout and sealer should go where the crew can collect it, and that is our advice, not a line from the City.

A bare plywood subfloor in an empty room being prepared: clean screws in rows, flooring in Smiley Park Historic District, Redlands
Cost and license

What does a flooring contractor charge in Redlands, and who needs which license?

We found no Redlands price study that states its method, so these figures borrow Angi's Los Angeles pages and carry medium to low confidence. Its July 8, 2026 flooring page shows labor at $3 to $9 per square foot, engineered hardwood at $10 to $18 installed, solid hardwood at $12 to $22 and refinishing at $4 to $8, and its September 15, 2026 laminate page puts removal of an old floor at $455 to $685 for 200 square feet. Federal wage data (BLS, May 2025) show a mean of $33.48 an hour for floor layers in the Los Angeles area, so Inland Empire bids may differ.

Make the proposal itemize each layer. Tear-out and haul-off, asbestos testing, moisture tests, leveling, stairs, transitions and baseboards each deserve a line. Business and Professions Code 7159.5 caps a home improvement down payment at $1,000 or 10 percent of the price, whichever is less, and our flooring cost guide weighs refinishing against replacement.

CSLB's C-15 class covers preparing a surface and laying carpet, resilient sheet and tile and wood floors, and ceramic tile is a separate C-54 class. Redlands asks a contractor pulling a permit for a state license number and a workers' compensation certificate, and our license check guide shows how to read a CSLB record.

Raised wood floor framing seen from a crawlspace, with joists, a girder on concrete piers, flooring near Redlands in San Bernardino-Tippecanoe
Recent work

Flooring photos from Redlands and nearby communities

Plank samples, moisture tests, tile and finished rooms from Redlands and the communities around it, shown at the steps where the decisions get made. Tap any photo to enlarge it.

Raised wood floor framing seen from a crawlspace, with joists, a girder on concrete piers, flooring near Redlands in San Bernardino-Tippecanoe
Large-format porcelain tile floor in a house entry with a wood front door and a console table, flooring in Santa Fe Depot District, Redlands
Hardwood stair treads and landing with a white painted riser and a simple black metal railing, daylight, flooring near Redlands in Loma Linda University Medical
Cost

What flooring costs around Redlands

Dollar figures on this page are Los Angeles planning ranges from our flooring page, not a Redlands bid, so ask for tear-out, lab tests, moisture checks and subfloor repair as separate proposal lines. For other Inland Empire cities, read flooring in San Bernardino, flooring in Fontana and flooring in Ontario, with flooring in Los Angeles as the big-city benchmark. The subcontractor guide explains which trade lays each layer, and a new slab or patio may also call for a deck in Redlands.

Flooring price ranges used for Redlands estimates (Southern California sources, before permits)
What it coversTypical range
Installation labor only$3 to $9 per sq ft
Solid hardwood, installed$12 to $22 per sq ft
Engineered hardwood, installed$10 to $18 per sq ft
Refinishing existing hardwood$4 to $8 per sq ft
Laminate, whole project$2,000 to $5,500
Hardwood, whole project$3,153 to $8,496
Removing the old floor$455 to $685 per 200 sq ft
TileNo sourced Los Angeles range
FAQ

Redlands flooring questions, answered

Do I need a permit to replace flooring in Redlands?

Not for the floor covering alone. The City's bathroom handout lists floor coverings as maintenance needing no permit when no other work is included, and we found no flooring page that says otherwise. A moved drain, new circuit or repaired joist does need one, so call the One Stop Permit Center at 909-798-7536 with the full scope.

How much does it cost to have flooring professionally installed?

Angi's Los Angeles flooring page, updated July 8, 2026, puts labor at $3 to $9 per square foot, with engineered hardwood at $10 to $18 installed and solid hardwood at $12 to $22. No Redlands study states its method, so read these as medium to low confidence, and expect tear-out, leveling and stairs as their own lines.

How much does it cost to install 1000 sq. ft of hardwood flooring?

Using Angi's Los Angeles rates, 1,000 square feet of solid hardwood runs $12,000 to $22,000 installed, and engineered hardwood runs $10,000 to $18,000. Both are Los Angeles ranges rather than a Redlands bid, and removal of the old floor, stairs and subfloor repair each change the total.

How much to refloor a 2000 sq. ft house?

At Angi's Los Angeles installed rates, 2,000 square feet of engineered hardwood comes to $20,000 to $36,000 and solid hardwood to $24,000 to $44,000, before tear-out of the old floor. A Redlands bid can differ, and a house with a mix of tile, wood and carpet will price each room on its own.

Can you put flooring over concrete?

Yes, once the slab is tested and prepared. The flooring maker's moisture limit sets the pass mark, and the installer checks it with humidity probes in the slab or calcium chloride kits before any patching or leveling. About 56 percent of Redlands homes predate 1980, so old adhesive on the slab may also need a lab test.

Why does moisture come through a concrete floor?

Water vapor rises from the soil under the slab, and rain, irrigation and roof runoff keep that soil damp. Redlands averages 12.87 inches of rain a year, nearly all of it from December through March, and parts of town have a flood history, so a dry August proves nothing. A slab test gives the real reading.

Is there asbestos in old floor tile in Redlands homes?

Possibly, and nobody can tell by eye. South Coast AQMD Rule 1403 defines resilient floor covering as tile and sheet vinyl with more than 1 percent asbestos, and about 15,389 Redlands homes, 56.0 percent, were built before 1980. Send a sample to a lab before sanding or prying, and have the proposal say who removes and pays for a positive layer.

Is refinishing hardwood floors worth it?

Often, when enough wood remains above the nails, which a vent opening or cut threshold will show. Refinishing runs $4 to $8 per square foot on Angi's Los Angeles pages, against $12 to $22 for new solid hardwood installed. Interior floors in a Redlands historic district are not a Certificate of Appropriateness item, which covers exterior work.

Does a historic district in Redlands review interior flooring?

No, not on the pages we read. The City's Certificate of Appropriateness covers exterior alterations, new construction and demolition in the eight local districts and on designated landmarks. A floor job that changes a street-visible door or porch opening is a different matter, so call Planning at (909) 798-7555 ext. 1 before ordering.

What license does a flooring contractor need in Redlands?

Floor installers work under a C-15 license for carpet, resilient flooring and wood, and ceramic or stone tile setters under C-54. To pull a permit in Redlands, a contractor shows the state license number and a workers' compensation certificate. Check the number on the CSLB site and ask each subcontractor for a license and certificate of insurance.

Free estimate

Tell us the year the house was built, the rooms and what is under the floor now

Say whether the house is a Victorian or Craftsman near the center, a tract house on the north side or a newer home, which rooms you want done and what covers the floor today. The asbestos test, the slab reading and any permit question come with us to the first visit.

Free estimate · A real person answers · (888) 666-8224

Call (888) 666-8224