Tarzana, CA · Serving Southern CaliforniaCSLB #1040337 · (888) 666-8224
Decks in Maywood

Deck Builderin Maywood, CA

Quick answer

A deck builder in Maywood works inside three limits: the state model list exempts only a detached deck of 200 square feet or less, under 30 inches and away from the exit door; accessory structures stay in rear and interior side yards; and a patio cover stays 5 feet off the property line. Attached or higher decks need a permit.

CSLB #1040337 5.0 on Houzz Free written estimate
Raised composite deck with a cable railing and outdoor dining set on a hillside lot, canyon view, decks in Maywood City Hall, Maywood
CSLB #1040337Verified at CSLB
5.0 on HouzzRated by clients
Written proposalsScope and price in writing
Licensed specialistsSubcontractors do the work

Maywood's backyards are small and contested. The City's R-3 sheet, a 2009 document it still posts, sets a 5,000 square foot minimum lot, 65 percent building coverage and a first story rear yard of 10 percent of lot depth, at least 15 feet. Census estimates for 2020 to 2024 count 3,647 detached and 902 attached single-family homes among 6,706 units, and the Housing Element says a windshield survey in August 2021 found a visible accessory dwelling unit on more than 40 percent of residential parcels. A deck competes with a garage conversion for the same square feet.

MDG Builders, CSLB #1040337, is a Tarzana general contractor. We draw the deck, put its permit questions to the Building Division and Planning, and hire a licensed carpentry subcontractor to build it. Materials and ranges are on the decks page, and the Maywood overview shows our other trades in town.

Decks rules in Maywood

What Maywood's Building and Planning Department, Zoning Ordinance and Municipal Code say about decks

  • The state model list of exempt work (Residential Code R105.2, via the City of Albany excerpt) exempts decks not over 200 square feet and not more than 30 inches above grade that are not attached to a dwelling and do not serve the required exit door, and I found no Maywood amendment. Maywood's permit application lists 'Balcony/Deck' under Addition, so an attached or higher deck is a permit item.
  • The City's Residential Patio Cover handout says to contact the Planning Division before spending on plans, requires a fully dimensioned site plan on a separate 8.5 by 11 sheet, says a patio cover is not permitted within 5 feet of a property line, says the long side must be 65 percent open, and requires 6 foot 8 inch minimum clearance, 4 by 4 minimum posts and roof sheathing details.
  • Zoning Ordinance 4010.190 allows accessory structures only in rear and interior side yards, no higher than 12 feet, and at least 6 feet from other structures, and on a corner lot structures are not permitted in the exterior side yard; the permit application's PATIO COVER block distinguishes aluminum, wood, lattice and covered roof.
Sources for these rules
  1. albanyca.gov: work exempt from permit 2025 cbc
  2. cityofmaywood.com: Residential Patio Cover
  3. cityofmaywood.com: 2009 Maywood Zoning Ordinance PDF
A wooden table with rolled blank deck plans, a clipboard, decks near Maywood in Bell
Yards

Where on a Maywood lot can a deck or patio cover go?

In the rear or an interior side yard, and not on the street side of a corner lot. Zoning Ordinance 4010.190 allows accessory structures only in rear and interior side yards, no higher than 12 feet and at least 6 feet from other structures. Section 4010.160 asks for at least 10 feet between residential structures, with windows of neighboring units offset to protect privacy.

The posted R-3 numbers add up quickly: a 25 foot front yard, interior side yards of 10 percent of lot width but at least 3 feet and no more than 5 feet unless the building code asks for more, a 10 foot street side yard and a rear yard of 10 percent of lot depth, at least 15 feet on the first story. Each dwelling also needs 200 square feet of open space, and front yards, side yards and driveways do not count toward it. We did not find whether an uncovered deck counts toward the 65 percent coverage cap, so ask Planning.

Some blocks follow modified front yard setbacks on a zoning map we did not read, and the PDF dates from 2009, so confirm before drawing.

A rear deck of warm cedar boards on a 1920s California bungalow, with simple railings, decks in Maywood Park, Maywood
Permits

Do you need a permit to build a deck in Maywood?

A small, low, detached deck might escape one, and no City page says so. The state model list of exempt work exempts a deck of 200 square feet or less that stands no more than 30 inches above grade, is not attached to a dwelling and does not serve the required exit door, and we found no Maywood amendment to that item. Maywood's permit application lists Balcony/Deck under Addition, so an attached or higher deck is a permit item on the combined plan check form.

The permit comes before the work, and it becomes null and void if work has not started within 365 days or stops for 365 days after the last inspection. Plan check is by in-person appointment, inspections run Tuesdays and Thursdays and the form asks for the contractor's license number and class.

Skipping it carries risk. Municipal Code 8-1.03, per a third-party mirror, charges an investigation fee when permit-required work starts first, and Chapter 15 requires a Real Property Report before a sale that lists permits for unfinished work and apparent illegal structures, so an unpermitted deck can surface at closing.

  • Is the deck 200 square feet or less?
  • Is every point 30 inches or lower above grade?
  • Is it detached and away from the exit door?
A low ground-level wood deck about a foot above the lawn behind a stucco house, decks near Maywood in Vernon
Shade

What does Maywood require for a patio cover or pergola over a deck?

The City's Residential Patio Cover handout says to contact the Planning Division before spending on plans and asks for a fully dimensioned site plan on its own 8.5 by 11 inch sheet. It says a cover is not permitted within 5 feet of a property line, the long side must be 65 percent open, clearance must be at least 6 feet 8 inches, posts must be at least 4 by 4 and roof sheathing details are required. The permit application's patio cover block separates aluminum, wood, lattice and covered roof types.

Treat the handout with care. It tells applicants to call a number with a different area code than Maywood's, so it appears copied from another city, and we print no number from it. Its 5 foot rule also sits beside Zoning Ordinance 4010.190, whose setback table did not extract readably, so ask Planning which controls.

Shade is scarce here. The Safety Element says roughly 95 percent of the city lacks tree cover and projects extreme heat days rising from about 2 a year to 8 to 10 by mid-century, so a cover is comfort as much as style.

A backyard deck with a wooden pergola, string lights glowing and a lounge set at dusk, decks in Benito Juarez Park, Maywood
Footings and ledger

How should footings and a ledger be built for a deck in Maywood's liquefaction zone?

All of Maywood lies inside a California Geological Survey liquefaction Zone of Required Investigation, though the 2023 Safety Element judges the potential very low north of Slauson Avenue, higher south of it and high in a small southeast corner. We found no footing depth for decks in the City material, so ask the Building Division whether a soils report applies to your lot and what depth and diameter the plan checker expects.

Where a deck meets the house, the 2022 California Residential Code, section R507.9, calls for a ledger of at least 2 by 8 pressure-treated lumber, no concentrated loads from beams or girders and no attachment to stone or masonry veneer. Fasteners are hot-dip galvanized or stainless and the ledger is flashed, and lateral hold-downs are two 1,500 pound devices within 24 inches of each end or four 750 pound devices. Maywood's code adopts the 2025 edition per the mirror, so ask the inspector whether any value changed.

A deck on tall posts over a slope with diagonal bracing and concrete footings, new lumber, dry brush hill, decks near Maywood in Huntington Park
Guards and pools

Is deck railing 36 or 42 inches in Maywood?

Forty-two inches in the model residential code. Section R312 of the 2022 California Residential Code requires a guard where the walking surface is more than 30 inches above grade within 36 inches of the edge, sets the minimum at 42 inches and stops a 4 inch sphere at any opening. Municipal Code 8-18.01 adopts the 2025 Residential Code with no local amendment we found beyond the penalty section, so the inspector can confirm today's numbers.

A deck beside a pool answers to a second rule. Municipal Code 8-10.01, per the mirror, requires a fence or solid structure at least 6 feet high around any pool or water body 18 inches or deeper, with no opening larger than 6 inches square except doors and gates. Gates must self-close and self-latch with the latch at least 4 feet above grade, and zoning allows such pools only in side or rear yards.

Deck stairs with a black metal railing and wide treads leading down to a lawn, decks in Pine Avenue Park, Maywood
Repairs

Is deck repair worth it on an old Maywood deck, and does it need a permit?

Often, if the framing is sound, and the permit answer depends on what you touch. Swapping boards in place is the simple case, but we found no Maywood sentence that says so, and rebuilding framing, a ledger, stairs or guards points toward a permit. No deck repair threshold turned up in the code text we read, so photograph the damage and ask the Building Division.

Wood has two local enemies. UC's integrated pest management pages say drywood termites are most prevalent in southern California and infest decks and fences, and advise fixing moisture problems and sealing exterior wood. NOAA's normals for the Downtown USC station put rain at 14.25 inches a year, 11.64 of them from December through March, so ask where posts meet the ground and how the framing sheds water.

Deck framing: pressure-treated joists with metal joist hangers and flashing tape over the ledger board, decks near Maywood in Cudahy
Cost and license

What does a deck builder charge in Maywood, wood or composite?

We found no Maywood price study, so the anchor is Remodeling magazine's 2025 Cost vs. Value report for Los Angeles. In its 16 by 20 foot test deck, with a built-in bench and planter, three steps and full railing, wood costs $18,419 and returns 99.6 percent at resale, while composite costs $26,872 and returns 73.9 percent. Angi's Los Angeles deck page, last updated October 28, 2025, lists $13,570 as the average within a range of $6,335 to $20,871. The two agree on wood and split on composite, so we rate composite medium to low.

Maywood lots start at 5,000 square feet, so price a deck under 200 square feet. At about $45 to $75 per square foot for treated wood and $65 to $110 for composite, a 12 by 16 foot deck of 192 square feet multiplies to roughly $8,640 to $14,400 in wood and $12,480 to $21,120 in composite, with permits and engineering extra. Size alone does not exempt an attached deck.

Business and Professions Code 7057 lets a general building contractor take a job whose main work is framing or carpentry, which fits a wood deck. We did not find which CSLB class covers composite surfacing alone, so ask for each subcontractor's license number. Our license check guide shows how to verify one.

Close-up of composite decking boards with hidden fasteners and a clean picture-frame border, decks in Pixley Park, Maywood
Recent work

Deck photos from Maywood and nearby communities

Footings, framing, railings and finished decks from Maywood and nearby towns, shown at the stages that matter. Tap any photo to enlarge it.

Deck framing: pressure-treated joists with metal joist hangers and flashing tape over the ledger board, decks near Maywood in Cudahy
Close-up of composite decking boards with hidden fasteners and a clean picture-frame border, decks in Pixley Park, Maywood
A close view of a noncombustible composite deck surface beside a stucco house wall, decks near Maywood in Commerce
Cost

What decks costs around Maywood

Dollar figures on this page are Los Angeles planning ranges from our decks page, not a Maywood bid, and permits, engineering and any Planning review belong on separate proposal lines. For the same lot, see flooring in Maywood and concrete in Maywood. Nearby comparisons: deck building in Bell, decks in Huntington Park, decks in South Gate and decks in Los Angeles.

Decks price ranges used for Maywood estimates (Southern California sources, before permits)
What it coversTypical range
Pressure-treated wood deck$45 to $75 per square foot
Composite deck$65 to $110 per square foot
16 by 20 foot wood deck (320 sq ft)About $14,500 to $24,000
16 by 20 foot composite deckAbout $21,000 to $35,000
Hillside, second-story, rooftop and ipe decksPriced by site visit
Permits and engineeringQuoted as separate lines
FAQ

Maywood deck questions, answered

Can I build a deck without a permit in Maywood?

Only a small, low, detached one, and only if Maywood follows the model text. The state list exempts a deck of 200 square feet or less, no more than 30 inches above grade, not attached to the house and not serving the exit door. Maywood's application lists Balcony/Deck as a permit item, so call the Building Division first.

What is the largest deck without a permit in Maywood?

Under the state model list it is 200 square feet, if the deck is no more than 30 inches above grade at any point, detached and not at the required exit door. Anything bigger, higher or attached needs a permit. We found no Maywood amendment, but confirm the numbers with the counter.

What happens if a deck is built without a permit in Maywood?

The City can charge an investigation fee and require the permit anyway, and Municipal Code 8-1.04 makes a code violation a misdemeanor with each day a separate offense. The pre-sale Real Property Report also lists apparent illegal structures. Ask the Building Division what a permit after the fact would involve.

Is deck railing 36 or 42 inches in Maywood?

Forty-two inches is the model code minimum. A guard is required where the walking surface is over 30 inches above grade, and openings must stop a 4 inch sphere. Maywood adopts the 2025 Residential Code with no amendment we found beyond penalties, so the inspector can confirm the edition.

How much should a 16x20 deck cost in Maywood?

In Remodeling magazine's 2025 Cost vs. Value report for Los Angeles, a 16 by 20 foot deck with bench, planter, steps and railing costs $18,419 in wood and $26,872 in composite. Angi's Los Angeles deck page averages $13,570. Maywood has no study we found, so a site visit sets the figure.

How much would a 14x20 deck cost in Maywood?

At roughly $45 to $75 per square foot for treated wood, a 14 by 20 foot deck of 280 square feet comes to about $12,600 to $21,000, and composite at $65 to $110 comes to about $18,200 to $30,800. Those figures multiply planning ranges built for Los Angeles, medium in confidence for wood and lower for composite, and permits come on top.

Is it cheaper to build a wood deck or composite deck in Maywood?

Wood costs less to build, and the Los Angeles gap is wide. In Cost vs. Value 2025, wood costs $18,419 and recoups 99.6 percent at resale, while composite costs $26,872 and recoups 73.9 percent. Composite saves staining, while wood is exposed to termites and moisture, so weigh upkeep against the first cost.

Do freestanding decks need footings in Maywood?

Most do, because posts need support, but we found no Maywood footing depth for decks. The City's patio cover handout lets a cover sit on a slab at least 3.5 inches thick if each column carries 750 pounds or less, and otherwise puts footings 12 inches below grade, but that is for covers. Ask plan check.

Can I put a patio cover over my deck in Maywood?

Yes, in a rear or interior side yard, within limits. Zoning Ordinance 4010.190 keeps accessory structures to those yards and 12 feet in height, and the patio cover handout bars a cover within 5 feet of a property line, wants the long side 65 percent open and requires 6 feet 8 inches of clearance.

Do I need a permit for deck repair in Maywood?

Swapping boards in place is probably the simple case, but we found no Maywood sentence that says so. Replacing framing, the ledger, stairs or guards, or touching an attached deck at all, points toward a permit. Ask the Building Division with photos of the damage before you hire a deck repair crew.

Free estimate

Send the address and a photo of the back yard

Tell us the rough size, whether the deck touches the house, how high it sits above the ground and whether a pool or garage conversion is nearby. We bring the yard and permit questions to the first visit.

Free estimate · A real person answers · (888) 666-8224

Call (888) 666-8224