House Paintingin Highland, CA
House painting in Highland needs no building permit, because the City lists painting as exempt finish work, but removing or replacing sinks, electrical items or drywall does need one. A painting company still follows South Coast Rule 1113 coating limits and, in a home built before 1978, EPA's lead-safe rules. About 43.8 percent of Highland homes predate 1980.

Most of Highland's paint sits on one building boom. The Land Use Element says the suburban tracts east of City Creek came with the East Highlands Ranch planned community in the 1980s, and Highland incorporated in November 1987. ACS 2020 to 2024 estimates count 16,795 housing units: 3,789 from the 1980s, 2,849 from the 1990s and 2,354 from the 2000s, or 53.5 percent from 1980 through 2009, against 7,358 built before 1980 and 713 from 1939 or earlier. About 35.9 percent of occupied homes are rented. The table cannot separate 1978 from 1979, so we state no count of homes under the federal lead rule.
On a repaint, MDG Builders (CSLB #1040337) acts as general contractor: we scope the surfaces, line up the prep and repairs and keep the schedule, while a licensed painting subcontractor applies the coatings and a plastering subcontractor handles any stucco repair. The painting page holds our sourced prices, the Highland overview covers the other trades, and the San Bernardino and Rialto guides show how two neighbors treat similar questions. Permits come from the City's Building & Safety Division. The City's pages opened, but its Municipal Code link returned an access error, so the code sections below come from GoCodebook, a third-party mirror dated October 4, 2026, and the City has the final word.
What Highland's permit exceptions, Rule 1113 and Policy 270 say about paint
Where painting permits come from in Highland: City of Highland Building & Safety Division.
- Painting, papering, tiling, carpeting, cabinets, countertops and similar finish work are exempt from a building permit, but a permit is required if the project involves removing or replacing sinks, electrical items or drywall; the Permit Exceptions page lists the Building counter at extension 232 for questions.
- Air district rule: South Coast AQMD Rule 1113 (amended February 5, 2016) governs field-applied architectural coatings in Highland, with VOC limits in grams per liter of 50 for nonflat coatings, 100 for primers, sealers and undercoaters, 50 for roof coatings, 50 for driveway sealer, 100 for stains and 100 for waterproofing sealers (rows read from the rule's table of standards).
- Lead-safe painting: EPA's RRP rule applies to paid work that disturbs paint in houses and child-occupied facilities built before 1978, and the City's permit application bulletin has applicants acknowledge lead-safe work practices for pre-1978 residences and certify that paint-disturbing work will be done or supervised by RRP-certified individuals. The ACS 2020 to 2024 table cannot separate 1978 from 1979, so no pre-1978 count is stated.
- Fire-damaged homes and historic homes: Policy 270 requires sealer primer on every smoke-damaged interior and exterior area of a fire-damaged building. For designated resources and properties in historic districts, alterations need a certificate of appropriateness, while ordinary maintenance that does not change design, material or external appearance is not blocked (16.32.070 and 16.32.120); paint colors are not addressed in the code text read, so ask Planning. (GoCodebook mirror, text as of 2026-10-04).

What do Highland's 1980s tract homes need before a repaint, and how hard does the sun hit paint?
A house from the 1980s has been weathering for at least 37 years, so prep decides how long a new coat lasts. We found no Highland survey of siding or stucco, so we cannot say which wall material dominates. What we can say is that the sun does the work: NOAA's 1991 to 2020 normals for Redlands, the nearest full station about 5.5 miles away, show average highs from 66.6 F in January to 96.2 F in August, about 104 days a year at or above 90 F and about 26 at or above 100 F.
Rain is short and concentrated, 12.87 inches a year with 9.77 of it from December through March and only a tenth of an inch in July and August. Foothill lots can run differently, because the City's About page says Highland sits against the San Bernardino Mountains at about 1,300 feet. A proposal should list each surface, the scraping, patching and priming it gets, and the product line, not just the color name.
Ask which surfaces get primer and which get a full second coat.

Does house painting in Highland need a permit, and when does prep work change that?
Paint itself is exempt. The City's Permit Exceptions page lists painting, papering, tiling, carpeting, cabinets, countertops and similar finish work as exempt, but a permit is required if the project involves removing or replacing sinks, electrical items or drywall. That second clause is the one that catches painters: a wall opened for a repair or a light fixture swapped during prep can turn a paint job into a permitted one. The page gives the Building counter at extension 232 for questions, and the City's Building & Safety page lists 909-864-6861 as its number.
Skipping a required permit costs more than the permit. Municipal Code 15.04.030(D) adds an investigation fee equal to the permit fee, and 15.04.030(E) allows re-inspection fees. Construction hours under 15.48.020 run from 7:00 am to 7:00 pm Monday through Saturday, with none on City or federal holidays, and the definition reaches deliveries and flatwork, so a crew's early ladder staging belongs on the schedule too.
Ask the painter to list any drywall or fixture work as its own line.

Does lead paint matter in Highland, where 43.8 percent of homes predate 1980?
It can. EPA's Renovation, Repair and Painting rule covers paid work that disturbs paint in houses and child-occupied facilities built before 1978, and the City's permit application bulletin has applicants acknowledge lead-safe work practices for pre-1978 homes and certify that paint-disturbing work will be done or supervised by RRP-certified individuals. By ACS 2020 to 2024, 7,358 Highland units were built before 1980 and 3,722, or 22.2 percent, before 1960. Because the table lumps 1978 and 1979 into one decade, your own build date is the better guide.
The federal rule has limits and exclusions. Minor repair and maintenance means 6 square feet or less of painted surface per room inside or 20 square feet or less outside, with no window replacement and none of the prohibited practices, and jobs in the same room within 30 days count together. The rule prohibits open-flame burning, high-speed sanding that lacks shrouds and a HEPA vacuum, and heat guns running at 1,100 degrees F or more. A written lead determination by a certified inspector or a certified renovator's negative test-kit result excludes a component. EPA says all firms, sole proprietors included, must be certified, and EPA runs the program in California.
Ask for the painter's RRP certification number before prep starts.

What VOC limits does South Coast Rule 1113 set for a painting company in Highland?
Highland sits inside the South Coast Air Quality Management District, and Municipal Code 16.48.030 bars emissions above the District's requirements. Rule 1113, amended February 5, 2016, governs field-applied architectural coatings, and it reaches anyone who applies, stores at a worksite or solicits the application of a coating. We read these limits in grams of VOC per liter from the rule's table: 50 for nonflat coatings, 100 for primers, sealers and undercoaters, 50 for roof coatings, 50 for driveway sealer, 100 for stains and 100 for waterproofing sealers.
We could not read the flat-coating row cleanly, and the floor-coating row came out scrambled, so we print neither. We also cannot tell whether the District has amended Rule 1113 since the posted file. Ask a painting company for the product data sheets, which state each product's VOC content, and check any cabinet or specialty coating against the rule's category it falls under before the can is opened.
Ask for the data sheet on every coating that goes on a wall.

What does a painter do after smoke or fire damage in Highland?
The City has a policy for it. Policy 270, revised in April 2019, requires a special inspection permit with a two-hour minimum after a fire, flood, earthquake or wind event, and for a fire-damaged building it calls for sealer primer on all smoke-damaged interior and exterior areas plus cleaning or replacement of central HVAC units and ducts. A California structural engineer's report is required for damaged masonry, concrete or commercial structures.
The history explains why: the Old Fire of 2003 burned more than 90,000 acres in and around Highland and destroyed nearly 1,000 homes, and the Line Fire that started on September 5, 2024 along Base Line near Alpine Street led to evacuation orders for more than 9,200 homes. Wikipedia counts one structure destroyed and four damaged as of October 24, 2024. If smoke reached your house without burning it, Policy 270 is written for fire-damaged buildings, so ask Building & Safety whether it applies to you.
Ask whether the smoke sealer is priced per room or per surface.

Do historic districts or the rental program limit paint choices in Highland?
In a historic setting, the answer is: it depends on what changes. Municipal Code 16.32.070 requires a certificate of appropriateness from the Historic and Cultural Preservation Board for alterations to designated resources and properties in historic districts, while 16.32.120 says ordinary maintenance that does not change design, material or external appearance is not blocked. The code text we read does not address paint colors, so ask Planning before a Village Residential or East Highland Village house gets a new palette.
Rentals have their own gate. Under Municipal Code 15.52, a business license certificate for each residential rental depends on an owner self-certification checklist and a City inspection photographed from the public right of way within two weeks. Violations get written notice within 15 working days and must be fixed within 30 days of the notice, or the license is withheld. With 5,845 renter-occupied units, that is a real constraint, though the text we read does not list which conditions count, so ask the City what the checklist covers.

How much does a painting company charge in Highland, and how do I read the quote?
We found no Highland survey, and the publishers below do not state their methods, so these are Los Angeles figures. Angi's exterior guide for Los Angeles, updated November 13, 2025, shows an average of $4,692 in a range of $2,947 to $6,484, or $2.20 to $5.90 a square foot of home, about 50 percent more for each added story. Its interior guide, updated August 4, 2026, shows $2,525 on average, $2 to $6 a square foot of floor area and $0.50 to $0.75 extra per square foot of prep in older homes. Thumbtack's interior page shows $579 to $2,287. The federal wage survey for May 2025 shows painters in the Los Angeles area averaging $29.71 an hour, a wage and not a billing rate. For planning we use about $2,900 to $6,500 for a typical one- or two-story exterior and $2 to $6 a square foot of floor area for interiors.
House painting is class C-33 with the Contractors State License Board, and stucco work falls under C-35. Business and Professions Code 7159 asks for a written contract, a down payment of $1,000 or 10 percent at most, whichever is less, and a subcontractor check box. See the license guide and how general contractors use subcontractors.

Painting photos from Highland and nearby communities
Painting scenes tied to Highland places such as the Historic Village District, East Highlands Ranch, Molino and Warm Springs, and to nearby communities such as Redlands, Loma Linda, San Bernardino and Yucaipa, from prep and masking to trim, cabinets and finished exteriors.



Where these Highland paint figures come from
Every painting price, with its source and date and the places where the sources disagree, is on the painting page. A repaint often shares a schedule with other exterior work, and the Highland rules for it are on the roofing page, the fencing page and the kitchen remodeling page. For a Southern California city with a different historic review process, compare the guide for Pasadena.
| What it covers | Typical range |
|---|---|
| Exterior, whole house | $2,947 to $6,484 |
| Exterior, per square foot of home | $2.20 to $5.90 |
| Interior, per square foot of floor area | $2 to $6 |
| Interior, Angi's Los Angeles project range | $1,282 to $3,784 |
| Extra prep in older homes | $0.50 to $0.75 per sq ft more |
| UV-resistant paint | $10 to $20 more per gallon |
Highland house painting questions, answered
Do you need a permit to paint the exterior of a house in Highland?
No. The City's Permit Exceptions page lists painting as exempt finish work. A permit is required if the project involves removing or replacing sinks, electrical items or drywall, so a repair done during prep can change the answer. The Building counter at extension 232 can confirm a specific job.
How much does it cost to paint a house in California?
Angi's Los Angeles guide shows an average exterior job of $4,692 within $2,947 to $6,484, or $2.20 to $5.90 a square foot of home, and $2 to $6 a square foot of floor area inside. We found no Highland survey, so a measured written proposal sets the price.
How often should I repaint my house?
No source we read sets a fixed interval for Highland. Sun exposure, the quality of the prep and the paint line decide it, and the nearest NOAA station, in Redlands, logs about 104 days a year at or above 90 F. We print no number of years; ask the painter what the walls show today and what the new coating is rated for.
Do you need a contractor's license to paint in California?
Yes, for most jobs. Painting is class C-33, and Business and Professions Code 7048 sets an unlicensed-work limit of $1,000 that does not apply when a permit is required or workers are hired. Check any painter on the Contractors State License Board site and compare the name on the contract.
Can a general contractor do painting?
On our jobs, a licensed C-33 painting subcontractor applies the coatings while MDG Builders (CSLB #1040337) manages scope, schedule and payments. The subcontractor's license number and certificate of insurance are yours to request. Whether another contract structure is allowed is a question for the Contractors State License Board.
What is considered low VOC paint?
In the South Coast district it is a coating within Rule 1113's limits, which we read as 50 grams per liter for nonflat coatings and 100 for primers, sealers and undercoaters. We could not read the flat-coating limit. Ask for the product data sheet, which states VOC content, and compare it with the rule.
What are the lead paint rules for an older Highland house?
EPA's RRP rule applies to paid work that disturbs paint in homes built before 1978, and Highland's permit bulletin has applicants certify RRP-certified work for those homes. About 43.8 percent of Highland units predate 1980. Ask for the painter's certification number and whether a lead determination has been done.
Is $50 an hour good for a painter?
It depends on what the rate covers. Federal data show a mean wage of $29.71 an hour for painters in the Los Angeles area in May 2025, and a billing rate adds insurance, equipment, supervision and overhead. A line-item proposal that lists each surface and coat compares better than any hourly rate.
What should I expect from a painting contractor?
A written proposal naming each surface, the prep and repairs, the primer and finish products, the number of coats, the sheen, the dates and the payment schedule. Add the product VOC data sheets and, for a pre-1978 home, the lead-safe plan. If a line is vague, have it rewritten before signing.
Do I need a permit for drywall repair before painting?
Possibly. Highland's Permit Exceptions page says a permit is required if the project involves removing or replacing drywall, even though painting is exempt. The page does not set a size threshold for small patches, so ask the Building counter before the wall is opened.
Ask for a painting estimate in Highland
Share the neighborhood, the year the house was built, whether it was ever hit by smoke and whether you rent it out. Before we call back we check the lead question, the Rule 1113 coatings and whether any prep work would need a permit.