General Contractor in Orange, CA
A general contractor in the city of Orange, CA works with a City building division and fire department of its own, Class A roofing on every re-roof, design review across Old Towne and the three Eichler tracts, and a bedroom and bathroom cap on the Katella to SR-22 blocks. MDG Builders, CSLB #1040337, manages all eleven trades here.
Eleven trades, read against the Orange rulebook
Each guide takes one trade and sets it beside the City code we could read and the Census housing numbers. The price tables are sourced regional ranges and not Orange quotes, and no permit fee is printed on any page.

Kitchen Remodeling in Orange
1960s tract kitchens, permit-exempt finish work, the Neighborhood Preservation Overlay, Old Towne and Eichler review and the 2025 codes.
See Orange kitchen remodeling →
Bathroom Remodeling in Orange
Old Towne design review, a two-bath cap east of the Plaza, 1960s tract plumbing and the permit line that frames a bathroom job in Orange.
See Orange bathroom remodeling →
ADU Construction in Orange
Orange's 60-day ministerial ADU review, four foot setbacks, inoperable historic garage doors and the fire and flood overlays that shape a backyard unit.
See Orange ADU construction →
Room Additions in Orange
Orange's overlay caps on added bedrooms, floor area ratios, the Single Story overlay, Old Towne and Eichler review and the sprinkler and flood triggers.
See Orange room additions →
Roofing in Orange
Class A on every roof, no new covering over wood shakes, Old Towne design review, three Eichler districts and a fire map to check by parcel.
See Orange roofing →
Windows in Orange
Old Towne and Eichler design review, lead-safe rules for pre-1978 homes, the City's security glazing chapter and the fire map that frame a window job in Orange.
See Orange window replacement →
Flooring in Orange
Old Towne oak floors, 1960s tract slabs, raised floors and termites, asbestos before 1980, rentals and costs for flooring in Orange, CA.
See Orange flooring →
Painting in Orange
No paint permit, Old Towne color review, Eichler street-view rules, whole-wall tract repainting, the EPA lead rule and low-VOC limits.
See Orange painting →
Concrete in Orange
The 60 percent front yard paving cap, Old Towne walkways, sidewalk and street tree rules, flood overlays, retaining walls and pour costs in Orange, CA.
See Orange concrete work →
Decks in Orange
The 200 square foot permit line, Old Towne and Eichler review, rear yard limits, pool decks, fire-map questions and deck repair in Orange, CA.
See Orange deck building →
Fencing in Orange
A 3.5 foot front yard limit, 6 foot side and rear fences, 8 foot sound walls, banned chain link and tract walls repaired as one piece.
See Orange fencing →Which Orange rules decide your project: the Plaza district, an Eichler tract or a 1960s street?
Orange began as a townsite that Chapman and Glassell laid out between 1869 and 1873 around a central plaza. It was first called Richland, then renamed when the post office application was refused because another Richland already existed. The town incorporated on April 6, 1888, and Wikipedia calls it the only Orange County city planned and built around a plaza. Citrus carried the economy in the 1890s, and growth stayed slow until the 1950s. Preserve Orange County reports that the City processed more than 28 tracts with over 2,400 homes from 1955 to 1959, then more than 5,000 homes from 1960 to 1964. The Census Bureau's 2024 estimates count 46,126 housing units, and the 1960s are the largest decade at 26.2 percent, ahead of the 1970s at 20.3 percent and the 1950s at 12.6 percent. Only 4.1 percent date from 1939 or earlier, about 64.5 percent were built before 1980, and 43.9 percent of occupied homes are rented. Single decades carry wide margins of error, so read those shares as approximate. The result is two cities in one: a Victorian-era core and a ring of mid-century tracts, so a job on a kitchen or bathroom usually starts with old wiring, old supply pipes and paint from before 1978, and the same era governs flooring over aged adhesives.
Orange County law governs here, so nothing from the Los Angeles County codebooks applies. The City adopted the 2025 California construction codes through Ordinance 16-25 on November 12, 2025, and the Building and Safety Services Division of Community Development enforces them. Fees are set by Council resolution, so we print none. The City website blocks automated tools, so we never read its pages, and our code text comes from the GoCodebook mirror of the municipal code: confirm any section with the City before you rely on it. The same goes for the permit-exempt list. We could only read the state version as excerpted by the City of Albany, and Orange adds just TV dishes and flagpoles up to 15 feet. Orange also runs its own fire department rather than relying on the county fire authority. Two Fire Code rules are worth knowing: sprinklers become mandatory when an addition pushes a one or two family home past 5,000 square feet, and a re-roof must carry a Class A rating on every street in the city, with no covering allowed over wood shakes. That citywide Class A rule shapes every roofing job. A separate state hazard map, adopted by Ordinance 07-25, adds Very High, High and Moderate fire tiers for new buildings, but which streets sit in which tier is unknown to us, so ask the Fire Department about your parcel.
The overlays are where Orange gets specific. Old Towne, a National Register district since July 11, 1997, covers about one square mile around the Plaza and holds more than 1,300 vintage buildings, mostly from 1874 to 1940. City code calls for design review on all projects there unless a design standard exempts them, and we have not read the Old Towne standards, so for windows, painting or a roof, ask Planning first. The Fairhaven, Fairmeadow and Fairhills Eichler tracts, 339 homes, became local historic districts in November 2018, and we have not read their design standards either. Between Katella Avenue, Main Street, the SR-55 and the SR-22, a Neighborhood Preservation Overlay holds an existing home to two added bedrooms and two added bathrooms, counted from January 1, 2023, which matters to any room addition. Lots marked with an A overlay stop at one story or 20 feet. Citywide, front yard fences top out at 3.5 feet and no more than 60 percent of a front yard may be paved, a limit that frames fencing and concrete flatwork. For a deck, the state exempt list suggests small low platforms may skip a permit, and the zoning rules still apply. Flood is a conflict inside the code: the Residential Code table says Orange has no flood zones, while the zoning and flood chapters set FP-1 and FP-2 overlays, so we rely on the flood chapters. Grading thresholds sit in a manual we could not read, so they remain unverified.
ADUs are the friendliest corner of the code. Chapter 17.29 approves ADU and junior ADU applications without a hearing and gives the City 60 days to act on a complete one, and our ADU guide lays out the sizes and setbacks. The chapter's sprinkler sentence does not match state law as we read it, so ask the Building Division before you assume an ADU does or does not need sprinklers. One jurisdiction caution: parts of El Modena and Orange Park Acres may be unincorporated, and we could not verify which parcels, so a quick address check comes before any permit steps. MDG Builders holds CSLB #1040337 and acts as the general contractor. We write the scope, prepare plans, run the permit file and the schedule, and licensed specialty subcontractors do the field work; ask each one for a license number and an insurance certificate. Our posts on the way general contractors use subcontractors and checking a license on CSLB explain it. Neighbors with their own guides are Anaheim, about 4.4 miles north, and Garden Grove, about 5 miles west. Santa Ana, Tustin, Villa Park, Placentia and Yorba Linda have no hub page yet, so call us about work there.

- Orange incorporated on April 6, 1888, and its Old Towne district has been on the National Register since July 11, 1997.
- The Census counts 59.2 percent of the city's housing units as built from 1950 through 1979, and about 64.5 percent before 1980.
- City code requires a Class A roof assembly on any re-roof citywide, and nothing may be laid over wood shakes.
- Front yard fences are capped at 3.5 feet and front yard paving at 60 percent of the area.
- The Neighborhood Preservation Overlay limits added bedrooms and bathrooms to two each, counted from January 1, 2023.
- We read the code on a mirror and the state permit-exempt list on Albany's page, because the City site refused our tools.
Cities near Orange we also build in
Orange, CA permit and contractor questions, answered
Who handles building permits in the city of Orange?
The Building and Safety Services Division, part of the Community Development Department, enforces the building code and issues permits. We could not open the City's pages, so counter hours, phone numbers and fee amounts are unverified here. Fees come from a Council resolution and change, so ask the division for the current schedule before you set a budget.
Does the Orange County Fire Authority review projects in Orange?
No. Orange has its own Orange City Fire Department, which is the code official for the City's Wildland-Urban Interface chapter and enforces the local Fire Code. Fire review on your job comes from that department. We do not know which streets sit in which hazard tier, so ask the department to check your parcel on the City's adopted map.
What roof class does Orange require?
Class A, on every new roof, every re-roof and every repair covering, whether or not the house is in a fire zone. If more than half of a roof is replaced within a year, the whole covering must reach Class A. Nothing may be laid over wood shakes. Ask Planning about review first if the house is in Old Towne.
Do I need approval before changing windows or paint in Old Towne?
Possibly. City code requires design review on all projects in Old Towne and the other historic districts unless an adopted design standard exempts the work, and color and materials are among the review topics. We have not read the standards, so we cannot say which jobs are exempt. Call City Planning before ordering windows or choosing colors.
How high can a front yard fence be in Orange?
Three and a half feet in a required front yard. Side and rear fences on a standard lot may reach six feet, with toppers and lattice counting toward that height. Chain link is barred, and the code adds material limits for historic districts. Check today's text with the City, since we read it on a mirror.
How many bedrooms and bathrooms can I add between Katella and the SR-22?
At most two bedrooms and two bathrooms, half baths included, counted from the number the home had on January 1, 2023. The Neighborhood Preservation Overlay covers the blocks between Katella Avenue, Main Street, the SR-55 and the SR-22. Added bedrooms also trigger open space, living area and storage standards. Ask Planning how they apply to your lot.
Can I build an ADU in the city of Orange?
Yes, the municipal code approves ADU and junior ADU applications without a hearing and requires the City to act within 60 days of a complete application. Historic districts add garage and design rules. The chapter's sprinkler wording conflicts with state law, so confirm sprinkler needs with the Building Division. Fees are not printed here.
Are the prices on the Orange trade pages quotes from MDG Builders?
No. They are sourced regional ranges whose sources are named on each trade page, and none is an Orange quote or includes a permit fee, because we could not verify the City's amounts. A real number arrives only in MDG Builders' written proposal, after we see the property and learn which review applies to your street.
Tell MDG Builders about your Orange project
Give us the street, roughly when the house went up and whether it sits near the Plaza, in an Eichler tract or on a 1960s block. We sort out the review question first, then the roof class, fence and paving limits, and explain what the City will probably look at.